2004 – Athlone Civic Centre and Library, Co. Westmeath
Completed in 2004, the Civic Centre, Library and Centre Square are the main focal points of a strategic master plan for the regeneration of Athlone.
2004 – City of Vancouver National Works Yard, British Columbia
This 12-acre Engineering Operations Facility is the City of Vancouver’s pilot initiative to promote sustainable design practices.
2004 – Colorado Convention Center, Denver
A huge development – the entire facility is 2.4 million sf in total size, construction began in January 2001 and opened in December 2004.
2004 – Croke Park, Jones’s Road, Dublin
Awarded the RIAI Gold Medal. Commenting on the award, judging panel chairwoman Joan O’Connor said: “Croke Park stadium is a landmark in the architectural,
2004 – Design for 35 Barrow Street, Dublin
Proposal for tall residential tower for the area alongside Grand Canal Dock. Never received planning permission.
2004 – DKIT Faculty of Nursing, Dundalk, Co. Louth
Buit by STV as a standalone building on their extensive campus at DKIT. The glass-fronted building cost €15.5 million and covers 4,000 square meters.
2004 – Lewis Glucksman Gallery, Cork, Co. Cork
The Lewis Glucksman Gallery, located at University College Cork’s main entrance on Western Road, is a major new addition to the vibrant cultural life of the Munster region.
2004 – Liffey House, Tara Street, Dublin
Various Departments of the former Dublin Corporation were accommodated in the original Liffey House. This building,
2004 – Limerick County Council Offices, Limerick
The principal objectives of Limerick County Hall were to provide an environment conducive to the council fulfilling its roles: to reflect and foster ease of communication between staff and with the public,