2010 – Drive Through Restaurant, Briarhill, Galway
On this project the challenge was how to build a drive though restaurant on a site just off the M6 motorway on the eastern edge of Galway City.
On this project the challenge was how to build a drive though restaurant on a site just off the M6 motorway on the eastern edge of Galway City.
With its steel and glass facade, the new terminal makes use of natural light to create a modern and comfortable space for both departing and arriving passengers.
The project takes on five contiguous Protected Structures in central Dublin and converts them to new uses for the Dublin Dental Hospital.
Glasnevin Cemetery is run by the Glasnevin Trust, the cemetery first opened in 1834,
This brand new 2,111 capacity purpose built theatre was designed by architect Daniel Libeskind and is due to open in March 2010.
The €20million building was specifically designed to combine the elements of research, performance and teaching by leading French Architect Daniel Cordier,
The building has been designed to accommodate a team working on the digitisation of the treasures of Trinity’s Old Library: a vital component of the plan to open the significant Manuscript and Early Printed Books collections of the Library to the world.
The landside bar and cafe in the new terminal at Dublin airport is a 84mm oak veneered plywood deformed grid shell as a baldacchino over bar and server.
The Obel Tower dominates the Belfast skyline. Planning permission was granted in January 2008 for an extra two floors to be added to the tower to cater for further demand in apartment space.
The house is on a terrace whose split-section is native to Georgian Dublin; a grand parlour to the front with smaller rooms to the rear at half-levels one up and one down from the street.
Map is being rolled out, not all buildings are mapped yet - shows location of buildings on this page.