Reply To: 32-floor building planned for Dublin

Home Forums Ireland 32-floor building planned for Dublin Reply To: 32-floor building planned for Dublin

#738548
niall murphy
Participant

When luas work on first 2 lines finishes start building the next 2. Then when port tunnel finishes get the boring machines and do metro from airport to join luas lineB at Ranelagh. in the mean time work on Kildare line and later start electrifying Maynooth and Kildare so that when Interconnector is built DART goes from kildare to maynooth via Stephens Green, Docklands etc. Metro should be called DART in my opinion with same train liveries etc to avoid confusion of having so many systems. Then you would have DART, Luas and an outer suburban system.

Really though what DART stands for would make a good name for a city-wide transport system

Latest News