Figlen
Forum Replies Created
- AuthorPosts
Figlen
ParticipantThanks for the comments ctesiphon. Gunter, I’m not a banker either!
Figlen
ParticipantMy apologies if this is not the place for this message but I am quite new to this issue and trying to get a handle on where exactly it stands at the moment.
If people could just let me know whether the points listed below represent a reasonable representation of where this stands at the moment, I would be extemely grateful.
-JCD may be starting to build the bike stands this month
-a few of the metropanels have been removed or moved due to safety concerns (but nowhere near the number that had been flagged as dangerous)
-none of the existing 48 panel billboards that were supposed to have been removed as part of the deal have been removed
-safety concerns about the placement of backlit, moving advertising in the sightlines of drivers have not been effectively addressed.
-wayfinding systems and toilets that were to be part of the deal have been dropped
-original proposed numbers of bicycles has been reduced, as have the number of metropoles/metropanels
-safety issues of metropanels being unsafe for blind pedestrians have not been addressed
-the contract that DCC have with JCD is still under wraps, so we still don’t really know what DCC stands to get from it.
-the localised cityscape that features at the bottom of the metropanels seems to be the same for all of them (dome + some other blocky buildings)
-concerns that some people have about the over-saturation of advertising in public spaces have not been addressed
By the way, I am not a journalist!
- AuthorPosts