what now for Irish Times D’olier Street buildings?

Home › Forums › Ireland › what now for Irish Times D’olier Street buildings?

Viewing 20 posts - 41 through 60 (of 67 total)
  • Author
    Posts
  • #749338
    GrahamH
    Participant

    Before

    …and, er, After

    Dear oh dear.

    The iconic curved corner, Before and After.

    The occasional spalled brick and parts of decayed pointing were repaired with a yellow mortar.

    A beautiful ivory has been chosen for the sashes, most of which are reproduction. Only the very occasional original sash with glass survives.

    As can be seen, a system of secondary glazing has been installed, whereby what appears to be an aluminium frame with a central horizontal glazing bar divides the inner window into two separate casements that open inwards. Very effective when one doesn’t have shutter boxes, but alas unacceptable that their street face is white. It should be black or grey. This is easily done with modern aluminium products and should have been insisted upon in a prestige terrace such as this.

    One of the distinctive and little known features of this WSC terrace is that the attic level is principally a dummy storey. All of the squat attic windows are consumed to the rear by their roofs, presumably on account of the shortfall in funding the WSC experienced in the opening years of the 19th century. They wanted to economise while keeping up appearances. And standards – which is more than can be said of today. All of the attic windows, with the exception of the curved end where an apartment occupies the attic floor, have been fitted with horrendous mirror glass! An entirely unacceptable state of affairs.

    How on earth was this permitted by DCC?

    Shocking stuff. In all honesty, is there anything DCC does not deem as being up to standard? Does it even have standards?

    In the case of the red brick houses, not even the rubbishy modern casement windows with mirrored glass were extracted!

    The vast majority of the upper floors are offices. There are four small apartments in the entire complex, all located on the corner of D’Olier Street and Fleet Street in the curved corner. Each is of two bedrooms, with a kitchen-cum-living room where one is expected to dine at a breakfast bar if space in the dinky ‘living room space’ is to be preserved. What a crying shame in such fine buildings.

    Around the back and, well, I don’t think anyone knows what’s going on here. Evidently never resolved from the outset in the early 1800s, or compromised over the years through addition and modification, this area, in spite of its historic fabric, required more serious intervention to sort it out. But it wasn’t.

    As seen to the left above, a former doorway infilled with mismatched brick was left untreated, and appalling grey ruled pointing pasted over the whole lot. What an unholy mess.

    The Wide Streets Commissioners would be rolling in their graves at this standard of finish fronting a prominent public space.

    Indeed, this odd kink in the street is now left without proper form or function. Even a nice seat for the patrons for the 150 bus would be a simple, useful and elegant gesture.

    #749339
    GrahamH
    Participant

    The curious little doorcase around the corner is one of the delights of this terrace. A real charmer. It has been beautifully conserved.

    Some images of the rear area during construction. If there is one overriding sense of awe about this project, it is the immense skill, dexterity and professionalism displayed by the contractors, architects and project managers in working with one of the most challenging, dense and sensitive urban sites conceivable. It is of enormous credit to them to have executed this project under such testing circumstances.

    Most of the cement render appears to have been removed and renewed in lime to the interior of the new atrium. The rabbit warren of the former The Irish Times offices is clearly apparent.

    The demolished 20th century houses and retained red brick façade to the centre.

    The site of the former 1950s printing works, looking west to the rear of the former EBS offices on Westmoreland Street.

    Back to the front and the finishing touches that make every development, the developers saw fit to apply for planning permission for the erection of LED lighting strips the entire way along the terrace’s street façade, at both shopfront and attic storey level. Naturally, any design professional with an eye in their head would never propose such a brutal concept on a spartan, classically ordered Wide Streets Commission terrace, nor would an informed planner even consider it, or an active conservation office approve it under any circumstances. But this is Dublin.

    One could not conceive a greater slap in the face to this elegant terrace if one tried.

    Again, the very concept of applying floodlighting to a group of buildings such as this demonstrates a risible lack of understanding amongst design and planning professionals of what this terrace even is. This is streetscape. It is not a signature building – it is not even a building. It is a collective, an amalgam – ordinary street grain designed to complement wider urban set pieces. To increase its status in such a manner is to distort the very hierarchical design philosophy of the Wide Streets Commission that brought the terrace into being in the first place. The lighting’s addition so late in the day was merely the icing on the cake of a thoroughly misguided project.

    John Spain Planning Associates spuriously claimed: “The classic lighting design will enhance and highlight the façade of this historic landmark in keeping with the area’s Architectural Conservation Area status and will bring life to the existing relief decorations of the façade.” “The proposed small lighting units’ size will result in an unobtrusive addition to the building”. “It is submitted that the proposed lighting scheme will provide visual interest, an increased feeling of public safety and accentuate the site’s local and national importance as a landmark structure.”

    What?!!

    What is more frightening is that the case planner backed it up, in the process erroneously stating that “the units shall be mounted on and concealed by the existing corbels at 1st and 4th floor levels.” Corbels? Concealed?

    In some fairness, one cannot expect a planner to know all the ins and outs of historic building stock, so again we must turn to the Conservation Office for advice, only to find that no report was submitted on this case. Thus, there was no conservation input at DCC’s end into this critical planning decision. Yet again. The sole consolation is that that the lighting has a permission of only four years, after which time its impact shall be reviewed. I couldn’t be bothered going to the effort of taking a night time photograph of the lighting, as it is so gobsmackingly awful – even worse than the daytime impact of the units – that it would be unfair to disturb people any more than is necessary.

    The shop units have great potential. The dual aspect corner shop would make a lovely café, with a charming shape and aspect, and bathed with sun until midday.

    Running mould cornicing seems to survive in many of the units, and was well repaired/reproduced.

    #749340
    GrahamH
    Participant

    A beautiful curved staircase survives inside the former public office unit of The Irish Times, where its mezzanine with reproduction balustrade as per the Georgian layout of the shops has been retained.

    It is going to be a challenge finding tenants for these units, but there are plenty of quality service-style uses that would suit them well, in addition to a staple café or retail store.

    Related to this project, underscoring the lack of clout the conservation sector has in Ireland, there is little question that compulsory works should have been initiated by Dublin City Council – remember, at the very height of the boom years – to have the final pair of WSC houses, complete with largely intact original shopfronts, restored as part of the composition. In any other developed western society, this would not be given a second thought. Indeed it would be deemed imperative. Here, it’s not even on the radar.

    Unquestionably, these should have been considered for restoration as part of a cut price contract with the adjacent development. Again, no joined-up thinking and no will.

    Outside, and the reinstated public realm, as expected, is thus.

    Complete with poured concrete scored to imitate paving. Truly, a world class public realm as aspired to in the upcoming Development Plan.

    Meanwhile, a new pedestrian crossing has been clunkily dumped outside the iconic rounded corner of one of the city’s most important terraces. Paving aside, why are two traffic signal poles being used, when one suffices to hold both signals?

    Never mind the aesthetic damage, why is our money being wasted like this? The same across the road.

    Around the corner on Fleet Street, this is the new, er, public realm. Leaving aside the general absence of, well, anything, why is there a hump in the pavement?

    So the newly created risk of pedestrians falling off can be used as an excuse to put another railing in?

    Really and truly. Honestly…

    In conclusion, this project represents all that went wrong during the boom years, where major development interests won out over the common good, and where economic buoyancy was not utilised for planning gain in the broadest sense. Equally, and more pressingly of all, it showcases in very stark terms the underdeveloped and under-resourced state of the conservation sector in Ireland. There was a perception throughout the Celtic Tiger years that with the passing of the 2000 Act, conservation was dealt with once and for all – ‘sorted’. Nothing could be further from the truth. Yes, we have legislation to safeguard built heritage in the courts, but on the ground we have failed abysmally at local authority and government departmental level to ensure the mechanisms, human resources, planning influence, and fundamentally the funding are in place to actively protect architectural heritage. This simply must change.

    #749341
    missarchi
    Participant

    I think its only far it gets a write up in the IT by fstein…
    I was always worried about this when I took photos from a bridge one day

    Irish Aviation Authority… It looks 70’s agent orange theme ave gas? like the cbank?

    #749342
    reddy
    Participant

    Really impressive post once again Graham – a fascinating (and as an architect, thoroughly educational) read. Well done.

    #749343
    corkblow-in
    Participant

    Agreed – fantastic piece of analysis superbly written.

    #749344
    Anonymous
    Inactive

    Thanks – an education.
    K

    #749345
    Morlan
    Participant

    Fastastic piece, Graham.

    Oh dear, oh dear. Who exactly in DCC is responsible for allowing this 7 storey block? Anyone know?

    #749346
    urbanisto
    Participant

    A brutal and cutting analysis of one of the most disappointing and shameful outcomes of the latter period of the boom. Well done Graham. The Times Building is certainly a sad indictment of the lack of vision, imagination and clarity of execution of so many built environment professionals from architects to developers to planners and professional staff at the Council. A real pity.

    #749347
    BTH
    Participant

    Graham, this is a brilliant critique. Thank you for putting into words just about everything that is wrong with this development. It looks to me as if noone gave a damn about how this building would be finished, how it would look from O’Connell Bridge or how the historic building could be brought back to life in a sympathetic and elegant way. An absolute disgrace, HKR and the developers should hang their heads in shame (and be banned from designing or building any more dross…If only).

    By the way, wait until the scheme for the redevelopment of the ESB offices on fleet street eventually gets going, also “designed” by HKR, Im sure another damning critique will be in order not least for the way it will unceremoniously poke its ugly head above the BOI on College Green when viewed from Grafton St. and Church Lane. How do they get away with it?

    #749348
    missarchi
    Participant

    Irishtimes leasing or owner occ?

    #749349
    gunter
    Participant

    Agree completely with other posters – not for the first time Graham has provided a critical analysis of a significant city centre development that expertly reviews the positives and the negatives in the development in a lucid and illuminating way. This service is not being provided by anyone else. The newspapers don’t do architectural analysis, Architecture Ireland [the journal of the RIAI] don’t do architectural analysis, the Irish Architecture Foundation don’t do architectural analysis. The AAI do architectural analysis, but only once a year and with a strong predisposition towards the gushingly positive.

    In the absence of critical analysis there’s nothing to stop the authors of this or any other major development believing everything is fine and they’ve done a fantastic job, a view which in due course will very likely be confirmed by a light-weight, blue-sky, review in one or more of the media listed above.

    The elements of the ‘Irish Times’ building development that appear to be ill-judged, or poorly executed, are not huge. If there had been a culture of architectural criticism and of open debate, there’s every possibility that many of the more obvious flaws might well have been ironed out, just by the sheer weight of informed opinion.

    #749350
    GrahamH
    Participant

    Thanks everyone for your comments – more opinion on the development in hand would be welcome!

    I think you have a point there gunter that’s worth reiterating: that most of the elements which went wrong here are indeed not huge, but the cumulative effect is what is damaging – and what is most frustrating. But ultimately with a project of this kind, with a group of buildings of such significance, the devil is in the detail. It’s everything. Without it there is no soul, no interest, no point. Nearly everything that has been done here lacks even a passing interest in the special character of this terrace, never mind the healthy glow of an all-consuming love affair one expects of a critical group of buildings like this after works of this kind.

    It all stands in stark contrast to the gushing, enthusing, velvety words submitted as part of the planning application, extolling the unique significance of The Irish Times terrace as the last example of a relatively intact Wide Streets Commissioners terrace. What has come of this? How has this recognition manifested itself on the ground? In any way? Painting the windows? Converting old offices into new offices? If maintaining the function of a building is considered the optimum result of restoring an historic structure, then we have a long, long road to walk.

    Sadly, amongst many professionals, this is indeed the ultimate goal, or as far as the vision extends. To a certain degree it is the purpose of conservation staff to inform and to educate in this respect, but a dismal absence of influence is clearly apparent, and has been for some time. Dublin City Council, as the pre-eminent planning authority in the State, demands a major Conservation Unit, with policy, planning, architectural, advisory, research and administrative staff, all based in the Planning Department, not in the Architectural division as at present. And this is a minimum requirement, never mind a major grant aid budget and wider links within the Council. We are still in the 1990s in terms of infrastructure and this has to change. I think rather than constantly blaming the planning division, as with countless cases throughout the boom years, efforts need to be concentrated on bolstering conservation and its influence within the planning process. This is the key to effecting change.

    #749351
    gunter
    Participant

    That corner with Fleet Street is one of the most elegant in Dublin, even the back, and it has cleaned up quite well, irrespective of whatever was going through their minds with that blocked opening treatment.

    For me, the two biggest reservations I’d have with the project is with the quality of the extra storey that pops up in the distant views from Pearse St. and particularly from O’Connell Bridge, and the treatment of the 1940s infill block on the D’Olier St. elevation.

    Whether it was just decades of grime that had toned down this infill block to nearly match the adjoining structures, or some application over the red brickwork, or whether it was a fading of an original red wash or coloured pointing on the adjoining original sections, surely maintaining and enhancing the uniformity of the D’Olier Street elevation was the primary consideration in this case. Instead, following the redevelopment, the 1940s block now jumps out as a discordant note, as shown in Graham’s pictures.

    Two views of the D’Olier St. elevation during demolition with the elevation of 1940s block [the four bays with plywood sheeting in the window opes] almost indistinguishable from the original WSC structures on either side.

    #749352
    GrahamH
    Participant

    @gunter wrote:

    or whether it was a fading of an original red wash or coloured pointing on the adjoining original sections

    Heh, you’re not starting that one again!

    Fantastic aerial view showing the nature of the fake attic storey there, with all but the three bays of the curved end hosting their roofs behind the windows. In the case of the final house, this was the last to be built, probably c. 1815, when presumably there was more money around to go the whole hog.

    The lack of uniformity amongst the restored chimneystacks is also unfortunate, particularly when seen from O’Connell Street.

    The scale and character of the Westin is mind boggling. If ever there was a development that was patently unsuited to its location, this was it. Shovelled in.

    #749353
    urbanisto
    Participant

    For me, what this development so awfully highlights is the failure of the “one type fits all” planning process we have in Ireland. Arguably a UK-type process requiring Listing Building Consent separate to planning permission would force greater scrutiny of applications involving protected structures. It would require much more engagement than currently exists from Conservation Officers and indeed might even encourage Conservation Planners with a greater eye for the detail and intricacies of these buildings. It is obvious from this shameful case that the Conservation Officer was either disengaged, asleep, dead or on holliers while all the work was being done.

    An excerpt from the Planner Reports states:

    Interdepartmental Reports:
    Conservation – No objection in principle however the appropriateness of the proposed
    walkways running along the rear facades of the protected structures is questioned. These
    should be omitted from the proposed development.

    City Archaeologist – No objections subject to conditions.
    Drainage – No report available as at the date of writing this report.
    Roads – Discussed by phone with Roads and Traffic Planning Division and no objection in
    principle.

    Quite obviously there was no follow up from anyone while the works were taking place (presumably under the direction of a Conservation Architect as per the standard conditions/requirement).

    #749354
    thebig C
    Participant

    Hey

    GrahamH once again, excellent post!

    My observations are as follows, the new addition itself is quite a good building. The architecture is sharp, interesting and yet restrained. As a stand-alone construction, it would be great. Its certainly far superior to much of the dross in the docklands. However, it is grossly out of context. Dare I say it, a high-rise building would have less of an impact then this additional example of looming bulky low-rise structres which try to conform by having stories lopped off, yet still impact horribly on the skyline and historic buildings!

    In a world of fibreoptics and LED lighting, the imposition of those spotlight bars worthy of a suburban shopping centre are an absolute disgrace and in many other Cities would simply not be permitted. Given the lighting its then hardly surprising that the developer chose hanging baskets which were obviously in the end of season bargin bin at B&Q!

    Honestly, the best I can say is that they cleaned up the face a bit.

    Sigh!

    C

    #749355
    urbanisto
    Participant

    The nighttime view o the D’Olier Street facade is awful. The floodlighting is completely pointless. It neither highlights the architecture of the terrace nor does it provide any prominence to the building in the streetscape.

    #749356
    hutton
    Participant

    Insightful and incite-full analysis there Graham.

    A few of my own thoughts, some of which have been touched on already so I’ll avoid repetition:

    The ‘top up’ roof extension is an absolute disaster. Not only are the Irish incapable of creating vista closers, in this instance one of the city’s most important vistas, looking south down O’Connell Street, has been mauled beyond belief. If its possible for the RIAI to award a negative prize, the ‘Wibbiley Wobbley Blunder’ should get it.

    It is all the more remarkable that the roof extension was permitted, while the faux attic storeys were seemingly wastefully left alone and empty. 6 houses would have yielded about 500 square metres in additional space, had the space been harnessed. Was this option even looked at by the City Council? If not, why not?

    It seems the worst outcome was achieved, whereby a ‘lets-pretend-we-don’t-see-it-as-it-camouflages-against-sky-loike-really’ was opted for. It does not. Nor is it a contemporary foil to historic buildings. What it is however, as has already been noted, is a symptom of a failed city council who are seemingly either unwilling or unable to protect the core fulcrum triangle at the heart of the city. What was the primary motivation of this? Was it so that a corporate roof top office with ‘spectacular views’ could be advertised for let at a higher price? If so, particularly in view of the visually blocked photomontages provided, the planners should have smelled a rat – and realised it would inevitably stick up as a visual one finger salute on the skyline, representing perhaps a private gain to one developer at the cost to the wider civic appearance and the greater community.

    It is also all the remarkable given the previous row as to the adjacent Treasury development of Westin Hotel 10 years ago, which Lancefort Ltd tried to block by way of a Supreme Court case – yet this new addition actually achieves making that rooftop scheme look admirable as a scheme that fitted in. And there in lies an interesting downward trajectory:

    1. The 1950’s replica in-fill took advantage of the previously faux attic storey, and gleaned an extra circa 170 sq metres at roof level, without any visual imposition.
    2. The 1990’s Treasury Westin scheme got through amidst much controversy, yet ultimately did not destroy the vista looking south from O’Connell Street.
    3. This ‘Celtic Tiger’ scheme utterly screws the vista closure looking south from O’Connell Street.
    4. If another scheme occurs in another ten years, what are we to expect? 😮

    > DCC Planning Dept / Fail 😡

    Finally regarding the lights, I fully agree the new suburban shopping mall style strip lighting is an absolute failure. I passed the other night, expecting that as the new units were at such an aesthetic cost during daylight, the night time result must be that the lighting would be to great dramatic effect. It is not. Perhaps an attempt at an under statement, the lighting is a failure and achieves sweet F.A. in terms of any effect. Utterly pointless.

    I also note the elegant mid-twentieth century dual globe street lamps unit that used to stand on the street has been removed – with nothing put in its place. Daft – that is unless the council is actively trying to create dark no-go areas in the city at street level, which I am actually beginning to suspect they are trying to do!

    At least the brickwork has washed up well, with of course the most unfortunate exception of returning the replica in-fill to a colour different in appearance to the rest of the street. The hanging baskets don’t bother me at all, though I do find it perhaps unintentionally most appropriate that the icing on the cake is, well, hanging baskets on a basket case block.

    Aside from this scheme itself, there is one key lesson that contributers should learn from all of this: while a postmortem is all very well after the fact, for those that actually care about the city, it would be far better to get involved and take an active interest at planning stage so as to avoid such monstrosities happening. We certainly can’t rely on those authorities that are supposedly charged and paid to do such a task if this is the best they can achieve. “Premortems” folks, would perhaps be to far better effect than postmortems – and also active participation in the planning process, be it as individuals or by way of NGOs such as An Taisce.

    Will we read any criticism regarding this scheme in the media publication previously housed here? Somehow I doubt it… unless that is, someone is writing a book and wants to raise their profile before book launch :rolleyes:

    #749357
    hutton
    Participant

    On a slightly more humorous if waspish note, the new rooftop disaster scheme needs an appropriate name in the well established Dublin tradition, as in ‘Robo-block’ or the ‘Yoke on the Oak’…

    I know I’ve already used the term ‘Wibbiley Wobbley Blunder‘ above, but may I also suggest:

    ‘Prefab Sprout‘

    😀