university of limerick

Home › Forums › Ireland › university of limerick

Viewing 20 posts - 21 through 40 (of 172 total)
  • Author
    Posts
  • #788430
    Paul Clerkin
    Keymaster

    is the portait museum still on the first floor of Plassey House?

    http://ireland.archiseek.com/buildings_ireland/limerick/castletroy/plassey.html

    #788431
    Anonymous
    Inactive

    @Paul Clerkin wrote:

    is the portait museum still on the first floor of Plassey House?

    National Self-Portrait Collection of Ireland

    The National Self-Portrait Collection was housed between two locations – Plassey House and the Art Gallery on the second floor of the Foundation Building. I must check it out next month when strolling up the riverbank to Plassey.

    #788432
    Anonymous
    Inactive

    Irish World Academy of Music and Dance Building

    The result of an international competition, the new Irish World Academy of Music and Dance building will take its place in County Clare along the banks of the River Shannon. Lying at the foot of the new Pedestrian Living Bridge which will link both sides of the campus, this 4100sqm building will become the new heart of this young and vibrant University. Its architectural design is an inspired response to the ecological surroundings at the University of Limerick; this includes the many monastic influences along the River Shannon exemplified by Clonmacnoise, as well as those located in Limerick and Clare, such as Glenstal Abbey and Quin Abbey.

    “This new building will provide a riverside space where musicians, dancers, composers, singers, conductors and choreographers will explore together. Musicologists and choreologists will research alongside live performance.
    The history and anthropology of music and dance will provide the research surround for the rediscovery of older sounds and gestures, as well as for the discovery of new voices, and the reinvention of received traditions”.

    Key Features Link

    ■ Tower Theatre
    Situated at the very heart of the new building, the Tower Theatre resembles the monastic towers of Clonmacnoise. Scaling from the bottom floor to the top and finishing with a circular window to the sky, this atrium style facility can hold 80 people and will be a space out of which a powerful sound will resonate. The Tower will contain an awe-inspiring Pipe Organ making it an ideal venue for chant and voice performance. The music and song which will emanate from the Tower will recreate the ancient sounds which filled the air along the River Shannon’s banks 1000 years ago.

    ■ Sionna Theatre
    Holding 200 people, this Theatre has been described as a musical laboratory. The highly versatile seating arrangements allow for maximum flexibility and versatility for teaching, learning and performance. The theatre floors will contain sprung timber parquet dance floors to optimise dance performance. This facility scales from the ground floor to the top floor and will be topped with the Rooftop ‘Cloister’ Theatre.

    ■ Rooftop ‘Cloister’ Theatre
    The Rooftop Theatre will be used for outdoor performances. It holds approximately 200 people and has a retractable cover that can be used to protect the rooftop area should the Irish weather prove unfavourable. This area will be spectacular for performance as it will fill the riverside with music and song and draw student, faculty and visitor to the heart of the campus.

    ■ Shannonside Plaza and Café
    The design of the new Irish World Academy building includes a “performance entrance forecourt” on the open area immediately adjacent to the Academy’s front entrance. This Plaza will embrace the Living Bridge’s arrival into County Clare and will be punctuated by a 100 seat Café. The space may also serve as an informal performance location, an exhibition or display space as well as a gathering space for people attending Academy performances.

    ■ Other facilities will include:
    Specially designed large dance studios
    Studios for the teaching of music and dance
    Music and Dance Research Area
    Green Room
    Zen Garden
    Tutorial rooms
    Academic offices

    I think we will be giving Miltown Malbay and Doolin a miss with all this craic on the Clare side of UL. Refreshments facility provided by the ‘Lame Duck’ 😉

    #788433
    Anonymous
    Inactive

    Ah the lame duck, a great spot!, the fun part is trying to find your way back over to the other side in the early hours!;)

    #788434
    Anonymous
    Inactive

    Irish World Academy of Music and Dance

    Interesting video material (3D computer animation of proposed building). Take a tour see link. 😎

    #788435
    Anonymous
    Inactive

    Another video , this time the Living Bridge

    #788436
    Anonymous
    Inactive

    Nice bridge, although given its length, I would have thought they would have provided enough space for a cycle lane while they were at it.

    #788437
    Anonymous
    Inactive

    i think cyclists are pretty well taken care of in that regards all around the campus. A cycle lane along this bridge would ruin it imo

    #788438
    Anonymous
    Inactive

    Indeed, the vehicular bridge as its called has cycle lanes while the new bridge is solely for pedestrian use!

    “Architecturally, the bridge cross section was developed from the concept of a ‘salmon fish tail’ protruding from the surface of the flowing river. The design of this 150m-crossing is achieved in five spans. The bridge has separate vehicular and pedestrian and cycle decks and was constructed at a cost of €13 million.”

    UL Vehicular Bridge

    #788439
    Anonymous
    Inactive

    Pedestrian Living Bridge

    Nice promotional clip, gives one a good insight into it’s overall length. Talking to one of the chaps working on the bridge, they intend to be finished by September.

    In the meantime I found a really cool clip of the recent assembly of the bridge see link 😎

    The first image below is at the Health Science Building (Clare side) and the second is from the Millstream Courtyard (Limerick side).

    #788440
    Anonymous
    Inactive

    Architectural Concept – Pedestrian Living Bridge

    The load-bearing structure of the bridge is located below the level of the bridge deck. The structure does not disrupt the treeline or try to civilise the natural domain. The bridge is carefully integrated into the landscape and does not form a trajectory that is thrust through it. The experience for the bridge user is therefore not about reaching a destination on the other side of the river but is an enjoyable social interaction with nature.

    Because of the dense and mature planting on the riverbanks and islands, it is difficult to gain a vantage point whereby the whole of the crossing can be viewed at once. Each of the six spans can be appreciated as a discrete crossing in its own right, forming a composition in the landscape that has human scale and that is more visually balanced than a larger span that can only be viewed in increments. The six spans are visually articulated as a series of individual leaps from pier to pier. This arrangement is expressive of the manner in which the bridge spans from island to island, and is evocative of a stone skimming across the water.

    The curved route and multiple spans serve to fragment the crossing psychologically as well as visually. The bridge is experienced by the pedestrian not as a man-made intervention that has been thrust across the water, but is carefully and sensitively integrated into this unique site.

    As described earlier, the bridge is formed from a string of cable-trusses, with high-tensile steel cables supporting the bridge deck from beneath via a series of steel compression members. These compression elements extend above the bridge deck to provide support to the handrail.

    The geometric combination of the under-slung cables and constant inclination of compression members connecting cables and deck provides for a width of deck and distance between parapets that constantly changes along the length of each span. In this way, the edges of the structure appear to gently undulate. This causes the handrail, truss cables and bridge deck to meander gracefully as they traverse the water, imparting a sense of effortless fluidity to the bridge.

    Between individual spans, the bridge is supported from sculpted steel piers. The bridge deck is widened at these locations so that natural “node” points are created. Seating and shelter is provided at the node points to provide shelter, and to encourage their use as stopping points and to enhance an appreciation of the natural environment of the crossing.

    In summary, the proposed cable truss design is considered to be appropriate to the site for the following reasons:

    • The bridge is at low level, and “tip-toes” across the river to maintain the distinctive environment.
    • The bridge is integrated into the natural environment and is not thrust across it.
    • The use of multiple spans and curving route, break-down the scale of the crossing and enhance its’ visual and physical integration into the site.
    • The cable-truss is utilized as a structural device to minimize visual impact of the bridge itself.
    • The refuges located at the node points will encourage social interaction.

    See link Shannon Images UL Bridge

    #788441
    Anonymous
    Inactive

    Boathouse

    It seems the boathouse is now completed, any up to date images of the finished product about?

    See also previous post

    #788442
    Anonymous
    Inactive

    The Living Bridge is nearing completion. They were testing the lighting the other night so i took a few pics with my camera phone, sorry for the quality.

    1. Looking out on to the bridge from the Milstream Courtyard end of the bridge

    2. A side on view from the green behind the Millstream Courtyard complex

    The view from the front of the white house, looking out across the river was class. But my camera isnt good enough to take pics from that far.

    #788443
    Anonymous
    Inactive

    A better image here..http://www.flickr.com/photos/liveforphotos/2057876046/

    And bock the robber’s blog has some very nice shots of the bridge here

    Very nice bridge for a stroll across the Shannon! Was out there last evening. Very impressive..sways a bit or feels like it does!

    #788444
    Anonymous
    Inactive

    Mary Immaculate College gets another €24m for two new buildings

    Limerick Leader

    The physical transformation of Mary Immaculate College is set to continue into 2008, as funding worth €24m has been awarded to the college for the construction of two new buildings.
    Dr Peadar Cremin, President of Mary Immaculate College, said he was delighted and relieved to hear that Minister for Education Mary Hanafin had finally given the project the go-ahead.

    He said in recent years, the college has come through a period of extraordinary growth and development, with an increase in student numbers from 297 in 1991 to 2744 today.

    “This growth has left the college with significant development challenges such as lack of physical space and sufficient resources as well as posing serious health and safety problems for the college,” said Dr Cremin.

    This new project will involve the construction of two new buildings to accommodate lecture theatres, teaching areas, seminar rooms and various laboratories together with offices and accommodation for Mary Immaculate College Students’ Union and Student Services.

    This development will also comprise of a 500-seat auditorium which will be used as the college’s largest lecture theatre and an auditorium for drama and music.

    The first phase of the three-phase masterplan for campus development came to fruition this February when a multi-purpose sports hall, Tailteann, was opened.

    Dr Cremin said they are also anxious that funding is made available for Phase 2 and Phase 3 of this project. Work on the two new buildings will begin next month and is expected to be completed at the beginning of 2009.

    #788445
    Anonymous
    Inactive

    In the thread about stadiums in ireland justnotbothered mentioned UL are lookin to build a stadium!

    https://archiseek.com/content/showpost.php?p=74944&postcount=15

    Has anybody else heard anything about this. There could be potential for a sub 10000 capacity at the university with UL Bohs (rugby) and the soccer team justnotbothered mentions playing there. Also the many under age tounaments that are played in UL that could use it. not to mention the various University teams.

    Maybe limerick 37 could use it also

    #788446
    Anonymous
    Inactive

    Views of Living Bridge

    Also Gerry Horan has taken a few nice shots of the new “Living Bridge”. see image#1 image#2

    #788447
    Anonymous
    Inactive

    Kemmy Business School (Completed December 2007)

    Anybody seen the finished building yet? How does it fit in with the Schumann building next door?

    #788448
    Anonymous
    Inactive

    2008 UL Project News

    The Languages Building
    The development will have a floor area of 1400sqm, be 3 storeys high and will provide teaching and languages laboratory facilities and offices for languages staff, including a dedicated centre for “Ionad na Gaeilge”. This buildings will complete the development of the Millstream Courtyard as it will shelter the courtyard from the prevailing westerlies. It is due to be completed in May 2008.

    The Western Car Park
    The westerm car park, located just west of the Robert Schuman Building, will provide a much needed 375 additional spaces. Similar to the southern car park, there will be daily charges for users, payment being made at the exit. This project is due for completion in March 2008.

    The extension to the Glucksman Library and Information Services Building
    A major extension to the Library Building is planned under a Public Private Partnership scheme. The project is being co-ordinated by the Department of Education and Science in collaboration with the Department of Finance. Commencement is targeted for September 2008 with completion by the end of 2010.

    Irish Chamber Orchestra Hall
    Located in Cappavilla Village this will be the dedicated home of the Irish Chamber Orchestra. The practice hall will serve as a function venue for the Cappavilla residents and the building will also incorporate a new shop/coffee bar for residents. This project is due for completion in April 2008.

    Expansion to University Arena
    This expansion will incorporate a new 25m x 10m pool with a 3m high diving platform and moveable floor, a small sports hall and a cardiovascular gymnasium and weight training area. Commencement of the expansion is targeted for April 2008, to be completed by July 2009.

    Irish World Academy of Music & Dance
    This development is at the detailed design stage. Commencement is targeted for June 2008, to be completed by November 2009.

    #788449
    Anonymous
    Inactive

    @CologneMike wrote:

    Kemmy Business School (Completed December 2007)

    Anybody seen the finished building yet? How does it fit in with the Schumann building next door?

    This is actually one of the rare occasions where the finished product turns out almost exactly as its shown in the plans, its basically finished now with just the internal fit out left to do. Theres nothing spectacular about it to be honest, they seem to have used the left over materials from the likes of the millstream courtyard and the health sciences building, ie. red brick and wood panelling!

    The full height glass atrium is its most striking feature, theres also a glazed link between the Kemmy business school and the existing Schuman building, which now looks a bit tired next to the new build. Both the brickwork and the windows could do with a good scrubbing, the roof is also starting to look a bit tatty, could do with a bit of attention aswell. Also I wish they’d finally lay a proper surface on the non staff section of the rear carpark, its an absolute shambles at this stage! I also see there is to be a charge for the new “western” car park, probably to pay for the new bridge!:(

    Robert Schuman Building

Viewing 20 posts - 21 through 40 (of 172 total)
  • You must be logged in to reply to this topic.