Point Village

Home › Forums › Ireland › Point Village

Viewing 20 posts - 301 through 320 (of 559 total)
  • Author
    Posts
  • #760882
    paul h
    Participant

    Yea, great big glass dome would be sweet, but the high cost would be a factor im sure

    Great pictures Overworked thanks, any shots of the planned interior??

    #760883
    tommyt
    Participant

    @paul h wrote:

    Yea, great big glass dome would be sweet, but the high cost would be a factor im sure

    Great pictures Overworked thanks, any shots of the planned interior??

    I would imagine and hope the acoustic engineering necessities dictated the form, wouldn’t a dome be a nightmare sound wise?. Dublin’s never had a purpose built arena sized venue for concerts so hopefully it’s a marked improvement soundwise…

    #760884
    urbanisto
    Participant

    Surely the perfect spot for Fosters skycatcher!

    #760885
    jdivision
    Participant

    @Overworked wrote:

    I think this is interesting !!

    I think the tower looks worse than I expected. Ballymun architecture for the 21st century. I predict it will be hated by people within five years of completion.

    #760886
    -Donnacha-
    Participant

    @Overworked wrote:

    I have to admit, i like the new Point !!!

    Where did you find the images? I can’t find anything about it on the architects or engineers’ websites.

    #760887
    paul h
    Participant

    @tommyt wrote:

    I would imagine and hope the acoustic engineering necessities dictated the form, wouldn’t a dome be a nightmare sound wise?. Dublin’s never had a purpose built arena sized venue for concerts so hopefully it’s a marked improvement soundwise…

    if i’ve learned anything (and i probably haven’t), its that there is no limit to what can be achieved – engineering wise…

    Yes hopefully (dear god) it will be a marked improvement.
    It certainly does not look too hot from the outside but as your Grandmother would say – it matters what your like on the inside

    #760888
    alonso
    Participant

    I have to admit though, the last few gigs I went to in the Point, the sound was bloody excellent. They got a new rig about 3 or 4 years ago and it blew me away the first time. Back in the day it was absolute arse but in recent times it was great. I really can’t wait for this to take shape.

    #760889
    Morlan
    Participant

    I’ve been told that the foundations for the tower have been laid, and they are now driving girders into the perimeter. Bag of shite? I can’t tell. I’m here in Valencia smoking hot Spanish women.

    “Ye’d be up dere in de Point Teartre in Dublin, and you’d be singin a song, like, and you’d be wonderin if anyone could hear a fuckin’ word yer sayin'” – Christy Moore.

    C’mon, An Pointe Nua! Hurry the fuck.

    #760890
    -Donnacha-
    Participant

    Those renders don’t inspire really. Makes the Point look like a B&Q outlet. But I’ve seen the new frame going up in the flesh and its got nice dimensions, so hopefully the real thing will look better. Incidentally, what’s with dropping the “Depot”? Always thought Point Depot was a great name. But I digress..

    #760891
    Pepsi
    Participant

    why exactly is there such a long delay in bulding this skyscraper? it should be well under construction! it’s very annoying.

    #760892
    Rusty Cogs
    Participant

    Living close to the site I can tell you that the skyscraper represents about 10% of the development. That development is still for the most part a massive hole in the ground. The whole thing is due to be finished by 2010 but don’t expect to see anything scraping any skies this year.

    #760893
    Morlan
    Participant

    Anyone care to take a gander through the east gate on East Wall Road? The tower foundations are right there, like. I was there 4 months ago. An update would be great.

    #760894
    Rory W
    Participant

    Passed there the other day, no real movement on the tower as yet – the retail element is flying up though (probably as they have signed up tenants already) and the residential nature of the tower means there is no point in building until the market correction (ahem) is complete.

    Huge banner of Gay Byrne “the first mayor of point village” – whatever they are on this week I don’t know?!?!

    #760895
    Morlan
    Participant

    Thanks.

    #760896
    Overworked
    Participant

    There is a 12 mtr deep hole for the 3 story basement of the tower. Currently, at the bottom of this, they are driving (Drilling) 1 mtr wide & 25 mtr deep piles into the ground to support the weight of the tower

    #760897
    cubix
    Participant

    If piling has started then this is officially under construction.

    #760898
    rob mc
    Participant

    about bloody time!!!!!:D

    #760899
    paul h
    Participant

    well hallelullah !!
    Ive wondered why in ireland they seem to build the lift shaft first, then the rest of the building?
    over here they build each entire floor plate upwards , floor by floor

    #760900
    Pepsi
    Participant

    i’m not holding my breath. that’s too good to be true…

    #760901
    Starch
    Participant

    Reckon the point will be ready for when Dustin brings the Eurovision back next year? 😀

Viewing 20 posts - 301 through 320 (of 559 total)
  • You must be logged in to reply to this topic.