Point Village
- This topic has 558 replies, 100 voices, and was last updated 16 years, 5 months ago by
EIA340600.
- AuthorPosts
- September 2, 2007 at 10:20 pm #760822
igy
ParticipantThese works are (on Mayor St Lower, at least) for the relocation of services, IIRC the LUAS itself will be on the southern half of the street, rather than the northern which is being worked on at the moment.
September 3, 2007 at 3:19 am #760823Devin
ParticipantOk thanks. I had an idea it was just preliminary works as there are no contractor / company notices anywhere.
September 3, 2007 at 10:57 am #760824igy
ParticipantWell i’m basing that on a leaflet they dropped into the apartment before they started digging up the street, the works on Mayor St Upper could be more substantial, I’m not sure.
September 4, 2007 at 2:27 pm #760825GregF
ParticipantFair play to Harry Crosby all the same. At least he’s got his finger out and got on with the job.
September 4, 2007 at 8:10 pm #760826ake
Participanttis a pity that fashionable street will be a messy building site for the next few years.
September 5, 2007 at 3:55 pm #760827Pepsi
Participanti took a drive down here today. the concrete piles don’t seem to be getting any taller.
September 10, 2007 at 5:41 pm #760828darkman
ParticipantOne of the lift shafts went up another floor this afternoon. Having driven past the site the gap between the point and the district center is quite small now. Had me thinking surely one of those lift shafts is the tower!? Anyway the one that went up today actually makes that shaft look a little tall for a shopping center but maybe thats just the nature of the build ing – i dont know……..
September 10, 2007 at 5:55 pm #760829Pepsi
Participanti noticed that too. it’s all a bit of a mystery to be honest.
September 17, 2007 at 6:09 pm #760830Pepsi
Participantthe concrete piles don’t seem to be getting any taller here. i imagine if one were the watchtower it would be going up a lot faster.
October 3, 2007 at 1:41 pm #760831mcdanish
Participant@Pepsi wrote:
the concrete piles don’t seem to be getting any taller here. i imagine if one were the watchtower it would be going up a lot faster.
A second crane on site and the point is coming down brick by brick.Things gathering pace on this site i m sure the watch tower will start to rise in the next couple of months.
October 3, 2007 at 3:52 pm #760832tomk
Participant@Pepsi wrote:
the concrete piles don’t seem to be getting any taller here. i imagine if one were the watchtower it would be going up a lot faster.
According to an interesting articule in the current edition of Business and Finance magazine which focuses on all proposed highrises for Dublin, it said the Point Tower was waiting on a fire certificate before it could actually commence construction. So any existing construction or concrete shafts must relate to other buildings being built in the complex.
October 3, 2007 at 5:42 pm #760833Morlan
ParticipantThe property developers informd me today that construction on the tower has already started. 🙂
October 3, 2007 at 5:43 pm #760834darkman
ParticipantI agree it cant be long now before it starts going up. The site is a hive of activity now:
October 3, 2007 at 6:33 pm #760835Pepsi
Participant@Morlan wrote:
The property developers informd me today that construction on the tower has already started. 🙂
i hope it has started. we’ve all been waiting a long time for them to build it.
October 3, 2007 at 6:55 pm #760836Pepsi
Participant@darkman wrote:
I agree it cant be long now before it starts going up. The site is a hive of activity now:

i can just about make out another (small) concrete pile to the right of the site going up. i wonder what that is?:)
October 4, 2007 at 8:25 am #760837GregF
ParticipantFair play to Harry Crosbie!
October 4, 2007 at 11:51 pm #760838darkman
Participanthttp://www.pointvillage.ie/images/GERRYRYAN2007.jpg
:rolleyes: Sure has a quirky advertising campaign.
October 5, 2007 at 8:24 am #760839Morlan
ParticipantHere are the excavation works for the tower. You can see the Point Depot to the left.

The excavation works at the back of the truck must be for the escalators in Point Square.

And the District Centre

October 5, 2007 at 10:45 am #760840darkman
ParticipantMorlan wrote:Here are the excavation works for the tower. You can see the Point Depot to the left.
Thanks for the pictures! I wonder how advanced the works are for the tower? Does anyone know if they can excavate without a fire certificate for the tower (assuming they dont have one yet)? Or does the excavation mean everythings in order with the first lift shaft going up soon?
Morlan it may be difficult to gauge from where you took the picture but can ou say how advanced the excavation for the tower might be?:)
October 5, 2007 at 11:23 am #760841draiochta
ParticipantWhy are you assuming they don’t have a fire safety cert darkman??