O’ Connell Street, Dublin

Home Forums Ireland O’ Connell Street, Dublin

Viewing 20 posts - 361 through 380 (of 3,790 total)
  • Author
    Posts
  • #728187
    Anonymous
    Inactive

    The EBS was once an Art Deco building?

    #728188
    GregF
    Participant

    Yep, hence the preservation order on the central remnant.

    #728189
    Paul Clerkin
    Keymaster

    GregF, you make it sound like the rest of the site containing building of equal interest to the central piece. AFAIK that wasn’t the case.

    #728190
    Anonymous
    Inactive

    I’ve always wondered what the building looked like with its original wings – any pictures around?

    #728191
    GrahamH
    Participant

    Yikes that EBS is woeful, image that next to the straight-laced brickwork of ajoining buildings.
    What a nasty, tacky distraction.

    Give me the black glass anyday, it is starkly modern but discreet in its simplicity.

    The RDH is um, interesting – the devil’s in the detail so we’ll have to wait.
    I really hope that extra floor that’s set back is invisible from down the street.
    The Gresham terrace opposite have mansard roofs, the RDH terrace doesn’t.

    #728192
    GrahamH
    Participant

    And the outdoor cafe terrace will be a major bonus to this area of the street, really major.

    Thanks Peter for scanning.

    #728193
    Anonymous
    Inactive

    Its either a joke at this stage or has long since passed that but are they ever going to pave O’Connell St?!

    Progress is slow to say the least – it certainly comes in peaks and troughs and although the peaks provide for identifiable progress, the troughs are too frequent and too long.

    I cant understand why they haven’t copncentrated their efforts firstly on the Henry St. junction. I’ve spent months in crowds funnelled into a narrow pedestrial crossing by large concrete barriers. Surely the contractors know that this is by far the busiest stretch of the street and would make an effort to finish it first and with the greatest of haste?

    Am I being too logical?

    #728194
    GrahamH
    Participant

    A lot of the paving has been put down very quicky, esp outside Clerys, Easons and the GPO, but certainly the Henry St juntion is taking an eternity, coupled with the farce that was the completion of that street’s paving in the middle of the Christmas rush, after lying idle for two years.

    But from a contractors, or indeed the CCs point of view, why bother going to the extra effort to finish here first (not sure if I’m being critical here or not) No one’s going to complain,people just put up with being diverted and funneled. To awkwardly plan the laying of services, paving and other works, just to accomodate pedestrians may seem pointless to them.

    But the central median is definitely taking way too long to open.

    #728195
    GrahamH
    Participant

    Oh and the work on the RDH is due to start at the end of the month, probably says it in that Indo article.
    And ok, I didn’t quite tell the RDH to ‘shove it’, indeed the e-mail I sent was the very picture of politeness (and pedantry).
    Alas – no reply.

    #728196
    loismac
    Participant

    I think to correct the problems with Dublin’s city centre, the cc need to take one project at a time and complete them first before subjecting the city to twenty at once and not completeing any on time or to a majorities opinions it would appear effectively. May be Im niave in my opinion

    #728197
    Anonymous
    Inactive

    Originally posted by Graham Hickey
    But the central median is definitely taking way too long to open.

    The question is will DCC O’connell St committee member Royston be old enough to run for president by the time its finished? It is scheduled for completion prior to the Euro elections in June, will this muppet be able to point to a job done on time as promised?

    #728198
    GrahamH
    Participant

    I’m hating him more by the day, I’ve gone through 3 television sets already from putting my foot through him. He’ll be expecting a bronze statue of his smug self on the median next.

    So to the street of which he speaks – it’s loads of pics time.
    They were taken last Friday, so if you were wondering about that weirdo walking around O’ Cll St with a camera padlocked, chained and bolted to their arm, taking pictures of the ground, you know who it was.

    Firstly the major roadworks outside Princes Street.

    Followed by the new paving outside the GPO.

    #728199
    GrahamH
    Participant

    The GPO

    #728200
    GrahamH
    Participant

    The new lime trees:

    #728201
    GrahamH
    Participant

    Outside Easons:

    #728202
    GrahamH
    Participant

    One of the new pedestrian crossings, with steel grip studs – proof that those crude red tiles at crossings all over the city are and never were required in that colour.

    Also some detail at the GPO

    #728203
    GrahamH
    Participant

    Some of the paving detail:

    #728204
    GrahamH
    Participant

    The central median, work here is pretty much finished now:

    #728205
    GrahamH
    Participant

    Also – the work underway on the Dublin Bus building:

    #728206
    GrahamH
    Participant

    On that GPO pic, it should say the stone turns black in the rain!

    The Luas wires crossing the street went up on Monday and Tuesday, feels very European now!
    Unfortunately the wires passing by Mansfield Chambers/Clarks and the way they’re attached to its corner is less than sympathetic.