Metro ideas

Home Forums Ireland Metro ideas

  • This topic has 12 replies, 8 voices, and was last updated 18 years ago by Anonymous.
Viewing 12 reply threads
  • Author
    Posts
    • #709655
      shamrockmetro
      Participant

      I’m sure someone has thought of these ideas but I would like to have peoples comments…

      would you pull down the rail bridge blocking Custom house from O’Connell st bridge?

      this would also give you a better view from gardiner st?

      Has any one seen heneghan peng’s winning scheme for custom house?

    • #793971
      Anonymous
      Inactive

      What would you put in place of the bridge, a tunnel? and where would it begin. I think everybody would like to see the bridge remodelled or even demolished but the solution must be a practical one. Ideal world yes demolish, real world no hope.

      Where is that south bound broken green line going once it leaves Stephens green?

    • #793972
      Anonymous
      Inactive

      I know the problem is diesel trains in tunnels
      but just say they did do the tunnels they could pull it down and use the metal to build this?

    • #793973
      Anonymous
      Inactive

      @CC105 wrote:

      Where is that south bound broken green line going once it leaves Stephens green?

      Heuston Station, one potential route for interconnector

    • #793974
      Anonymous
      Inactive

      I think he meant the line going south east from Stephen’s Green, it seems to meet up with the existing DART line somewhere between Pearse and the next few stations

    • #793975
      Anonymous
      Inactive

      It’s been pointed out in a previous thread that the line is elevated from sandymount to Killester pretty much so it’s not really feasible to just pull it down when you examine all the prioirities re: rail.

    • #793976
      Anonymous
      Inactive

      @igy wrote:

      I think he meant the line going south east from Stephen’s Green, it seems to meet up with the existing DART line somewhere between Pearse and the next few stations

      Spot on IGY, looks like somewhere after Grand Canal Dock – only curious as have not heard anything about that route and use the Dart along there each day.

    • #793977
      Anonymous
      Inactive

      CC it’s because it doesn’t exist, and is not in any plan or strategy. It also makes no sense whatsoever, but none of these threads ever do.

    • #793978
      Anonymous
      Inactive

      You can ignore the dashed line above heuston station as well.

    • #793979
      Anonymous
      Inactive

      @PTB wrote:

      You can ignore the dashed line above heuston station as well.

      Isn’t that the (rarely used, but existing) Phoenix Park tunnel?

    • #793980
      Anonymous
      Inactive

      @igy wrote:

      Isn’t that the (rarely used, but existing) Phoenix Park tunnel?

      You see Shamrockmetro didn’t realise that such a line existed, and proposed a line that would have run parallel to the original. I was just saying that the proposed line should be ignored.

    • #793981
      Anonymous
      Inactive

      hehehee

    • #793982
      Anonymous
      Inactive

      …right…then..

Viewing 12 reply threads
  • You must be logged in to reply to this topic.