InactiveBit of a height diference it seems! from the indo ..
By Jerome Reilly
Sunday July 26 2009
IT looks, to the casual observer, like a bridge too high. Now elegantly draped across the Liffey, the Samuel Beckett Bridge appears to tower over the quayside roadway on the southside of the river.
The vertiginous drop of more than a metre from bridge to tarmac on Sir John Rogerson’s Quay has some of the few remaining high- flyers in the IFSC wondering if their low-slung sports saloons will survive the trip from docklands to Dalkey.
But the loftiness of the new bridge, due to be opened next year, is part of a cunning plan and not a monumental blunder, Dublin City Council insists.
“The constructed level of the bridge’s south abutment is in accordance with its design levels, which specifically allows for sufficient headroom under the bridge to accommodate marine craft on the river,” project manager John Flanagan explained.
He added that the current construction works will introduce a carefully designed gradual incline between the bridge deck level and existing ground levels. That may sound suspiciously like a ramp, but the council are convinced that drivers will not notice the drop when they leave the bridge.
The 120m bridge, which is 48m high, will link Guild Street on the northside with Sir John Rogerson’s Quay on the southside — west of Cardiff Lane/Macken Street.
Dr Santiago Calatrava Valls, considered one of the world’s great architects, designed the Beckett Bridge. The bridge will have four traffic lanes, cycle tracks and footpaths, and can facilitate bus and light rail in the future.
– Jerome Reilly
July 26, 2009 at 10:38 am #744568missarchi
Participant@Peter Fitz wrote:
Dr Santiago Calatrava Valls, considered one of the world’s great architects, designed the Beckett Bridge. The bridge will have four traffic lanes, cycle tracks and footpaths, and can facilitate bus and light rail in the future. – Jerome Reilly
Since when have the RPA planned no cables? I’m struggling to see how it will work?
July 27, 2009 at 3:23 pm #744569Anonymous
InactiveThere won’t be any trams going over this bridge.
The design goes back to the ‘Platform for Change’ proposal for a line starting near the docklands station and heading to Lucan via a route that’s was parallel to the grand canal.
Since the RPA have now chosen a different route for a line to Lucan, this line heading over the bridge is dead.September 29, 2009 at 10:40 pm #744570Blacktop
ParticipantMy apologies if none of this is new.
A few things I know about the bridge….
1 So far at least three swans have come to grief on the cables.
2 The Luas rails are not going in though there is provision for them if they change their minds!
3 The surfacing was finished last Sunday! Hooray!
4 There will be two lanes for traffic each side at about 3.25 metres wide and “footpaths” on
both sides.
5 The ends are currently about 2 feet higher than the surrounding road levels.
6 Will try to post pics of surfacing if they come out OKSeptember 30, 2009 at 8:24 am #744571alonso
Participanti think one of the lanes on each side is a bus lane?
September 30, 2009 at 5:07 pm #744572Blacktop
ParticipantMy understanding is that, due to load restrictions, the outer lanes cannot take the strain of a bus lane.
The main spans of the bridge have been surfaced with heavy duty mastic asphalt to accept heavy traffic but the outside lanes have not for this very reason.
So…..pedestrians and cycles on the outside buses and others in the main centre spans.
September 30, 2009 at 5:35 pm #744573Blacktop
Participant1 The new surfacing going in showing the missing Luas rail on the seaward side of the bridge looking to the South Bank…..
and
2 this is how it was done.September 30, 2009 at 8:22 pm #744574gunter
Participant@Blacktop wrote:
My understanding is that, due to load restrictions, the outer lanes cannot take the strain of a bus lane.
You’re joking, right?
September 30, 2009 at 8:41 pm #744575alonso
Participantyeh jaysus, you have to be joking. I mean, come on…. does that mean buses can’t overtake on the bridge? No you have to be joking. Are heavy trucks banned?
September 30, 2009 at 9:00 pm #744576GrahamH
ParticipantSure trams are heavier anyway…?
October 1, 2009 at 9:14 am #744577poukai
ParticipantHang on, I thought there was no plan to take the Luas across this bridge anyway? The pavement work on the south side is making good progress although the road layout is still looking a bit strange with the big slope and the sharp corner off/onto the bridge from SJRQ, but I guess we’ll get used to it.
Can’t wait for the bridge to be finished, finally M&S will be a viable lunch option 😀
October 1, 2009 at 9:20 am #744578Anonymous
Inactivethe point being poukai that the bridge was constructed with integrated tram tracks, whether trams go across it in the future or not – so surely it can manage the weight of a bus on its outer lanes.
October 1, 2009 at 11:36 am #744579Blacktop
ParticipantSee picture showing (not showing?) the missing Luas rail. (viewed from north end looking south, leaning tower of Guinness behind camera)
The two lanes on each side of the bridge spine (the luas rail lane and the one adjoining it to the left) are for motor traffic. 4 lanes in total
To the outside of these lanes, pedestrian and cycle lanes (footpaths?) on the extreme outside edges of the bridge behind barriers to protect from traffic. (2 in total.)
Hope this helps to clear it up a little.October 1, 2009 at 12:10 pm #744580poukai
Participant@Peter Fitz wrote:
the point being poukai that the bridge was constructed with integrated tram tracks, whether trams go across it in the future or not
Oh, right, missed that point…
October 1, 2009 at 2:47 pm #744581Blacktop
ParticipantAhem.
October 6, 2009 at 9:58 am #744582Blacktop
ParticipantThe southbound carriageway looking north.
The northbound carriageway showing the footpath / cycleway and crash rails going in.
October 6, 2009 at 12:27 pm #744583Rusty Cogs
ParticipantHas this thing got a completion/opening date ?
October 6, 2009 at 12:59 pm #744584kefu
ParticipantAccording to RTE, an early opening of some time around December 3-10 is predicted.
October 7, 2009 at 9:22 am #744585Blacktop
ParticipantThe timber handrail on the edge rail.
and a worm’s eye view!
(Just send the photography prize to the bridge and I’ll collect it later!)October 7, 2009 at 9:59 am #744586urbanisto
ParticipantLots of feature lighting I see…shame it will last about 2 years before the maintenance dries up.