Luas Central – Which Route?
- This topic has 319 replies, 62 voices, and was last updated 15 years, 10 months ago by
Smithfield Resi.
- AuthorPosts
- November 25, 2005 at 7:50 pm #763475
GrahamH
ParticipantAgreed 100% – Plan B
On balance, having another bridge across the Liffey is less visually damaging than having lower Grafton Street and College Green poled and cabled, and Lower O’Connell Street and Bridge destroyed with poles, cables, platforms and attendant features.
Or why not go Plan D and have the best of both worlds? :rolleyes:
B is perfect for serving Pearse Station which is also set to become a hub of sorts under Transport 21. A bit of a roundabout route all right having to double round the Trinity site, but something has to give. A pity it couldn’t join the red line further west – suppose the RPA want it as close to O’Connell Street as possible…
November 25, 2005 at 9:00 pm #763476niall murphy
ParticipantLine D is my preference. It would minimise disruption to O’Connell Street and provide a good connection with the Dart closeby at Tara Street. 2 new platforms could be constructed in front of the existing Abbey Theatre and by walking just around the corner to the red line platforms a good connection is possible here too. Then in time the line can be extended on up Marlborough Street or wherever it is to be taken.
I also think maybe after the trams reach here they could travel on to the Point Depot, thus removing the future problem of the red line going in and reversing out of Connolly. This would be achieved by running 2 routes: Sandyford – Point (bypassing Connolly) and Tallaght – Connolly
November 26, 2005 at 4:41 am #763477Morlan
ParticipantI was surprised by your choice, Graham, you having such an affinity for O’Connell Bridge.
As it stands, the bridge has an equal, balanced amount of river space either side of it, as it deserves. Ripping up College Green would only be temporary. A bridge would be permanent, a bridge that would be designed and built under a very tight budget. We could end up with an awful concrete heap of shite, further spoiling the view down the river – the loop line is bad enough.
The proposed LUAS bridge will also be a tram stop, cluttered with ticket machines, shelters and other paraphernalia, and would further obstruct the view of the Custom House.
Route A would be constructed in the least amount of time. It would provide the fastest connection for people travelling between Line A and B. Makes sense to me…
@Graham Hickey wrote:
Agreed 100% – Plan B
On balance, having another bridge across the Liffey is less visually damaging than having lower Grafton Street and College Green poled and cabled, and Lower O’Connell Street and Bridge destroyed with poles, cables, platforms and attendant features.
Or why not go Plan D and have the best of both worlds? :rolleyes:
B is perfect for serving Pearse Station which is also set to become a hub of sorts under Transport 21. A bit of a roundabout route all right having to double round the Trinity site, but something has to give. A pity it couldn’t join the red line further west – suppose the RPA want it as close to O’Connell Street as possible…
November 26, 2005 at 4:50 am #763478Morlan
Participant@ctesiphon wrote:
A for me too.
But why isn’t Grafton Street even under consideration? Its omission is even more glaring looking at those maps. The shortest, straightest route is the only one not illustrated.Luas down Grafton is NEVER going to happen. It’s the most important retail street/public space in Ireland. The affect on businesses there would be disastrous.
I’m sure anyone living in Dublin would agree.
November 26, 2005 at 3:35 pm #763479Anonymous
InactiveIt also duplicates the route of de proposed metro which makes the route selections outlined in this process farcical.
Routes A; D & E follow almost the exact route of de metro
Route B after taking an unnecessary jaunt to O’Donaghues then almost replicates the existing Loopline alignment
Only route C offers any additional coverage but then returns to the metro alignment
None of the above should be built
November 26, 2005 at 5:34 pm #763480LOB
ParticipantRoute B for me.
I like the link with Pearse Stn (DART/maybe Interconnector) & being able to go between Museum & the national Gallery/merrion square.
Traffic Chaos on Pearse Street during construction though.
Existing Railway bridge over Westland row would be a problem as wellNovember 26, 2005 at 5:39 pm #763481SeamusOG
Participant@Morlan wrote:
Luas down Grafton is NEVER going to happen. It’s the most important retail street/public space in Ireland. The affect on businesses there would be disastrous.
I’m sure anyone living in Dublin would agree.
I agree that it simply couldn’t be allowed to happen if it were an on-street arrangement.
Though I’ve never understood why it could not be built down Grafton Street under the street.
i.e.
Step 1: Dig up 50-100 metres of the street, moving the utilities to the side.
Step 2: Cover over this section so that work on track preparation can continue along this section under the street.
Step 3: repeat step 1 on the next 50-100 metre section of the street;
Step 4: repeat step 2.Repeat these steps as long as is necessary.
The advantage of this would be that it would give the most direct route – no need for awkward corners at the top and bottom of Dawson Street or conflicts with buses and other traffic in this area. No more than 50-100 metres of Grafton Street need be affected at any one time. However, it would be more expensive.
November 26, 2005 at 5:43 pm #763482LOB
Participantwhere would you start the cutting? Harcourt street?
I think it would be a disaster for St Stephens Green & I’m not sure where it would link up with the other line as it is so close to the Liffey.November 26, 2005 at 6:02 pm #763483SeamusOG
Participant@LOB wrote:
where would you start the cutting? Harcourt street?
I think it would be a disaster for St Stephens Green & I’m not sure where it would link up with the other line as it is so close to the Liffey.I don’t think it would be necessary to start cutting as early as Harcourt Street, and if you did have to then the whole idea would be a non-starter (Harcourt Street itself and the Cuffe Street-St. Stephen’s Green South corridor would be finished as a route for private traffic).
So parallel to the current LUAS tracks on the Green is the only option. The road space there is practically unused now that traffic does not/cannot go around the Green along that side. That side of the Green is somewhere between 250 and 300 metres long – plenty long enough to lower the track by 4-5 metres.
There would also be plenty of distance to surface the line before crossing O’Connell Bridge (or even a new bridge across the river).
But I’d agree with you, it would be pretty unsightly in an area as nice as St. Stephen’s Green.
November 26, 2005 at 6:03 pm #763484Alek Smart
ParticipantWhat worries me most about the prefered option is how it copperfastens the much criticised Bus Atha Cliath principle of An Lar`ism or,for the OAP`s ,Pillarism…..
My own pref was for C or the Great George Line.
I look to this in the spirit of trying to offer commuters a tantalising view of another Dublin which presently lies only metre`s from their Bus/Tram and which is crying out for people to come along and repopulate it.
With the present Transport Ministers appearing to be pre-occupied with losing such important things as Road Safety advisers and personal secretary`s (7 in two years.?? Shurely shome mishtake ??) I am reluctant to commit any great confidence to seeing ANY elements of T21 constructed in my lifetime.
I am also concerned at the ease with which all the great and the good are now galloping off to commence new Billion Euro projects whilst leaving the existing ones half finished……
Glass half-full..?………Nah…….It`s half-empty still.November 28, 2005 at 8:32 pm #763485GrahamH
ParticipantThe more you look at the bigger picture on the likes of P11, the more you realise the extent to which all of the above, as has been said, replicate other planned infrastructures – to the degree that unless you are fully in the know about the intricacies of Dublin transport, the city’s needs, the capacities of various modes, and interconnectivity, you really cannot make an informed call on the proposed routes (me included), save what your general preference would be.
Hence it merely seems to me :), that all of these proposals, some of them quite different, and some if not all in one way or another replicating other planned or existing routes, reinforce the notion that this link is only being built for the sake of building a link. It doesn’t seem to matter where it ends up, what route it takes or what it serves along the way – just ‘as along as a link is built’, at an astronimical cost, then all will be well with Luas at last.
Especially regarding Plan B which I voted for on architectural/urban design grounds. If this route is taken it will probably take longer as jimg says than to walk to the Northside. Even with the most direct Plan A, it will probably save you about two/three minutes. So unless the linking of the lines offers real advantages in interconnectivity, the transference of rolling stock, and the opening up of the Northside for Luas extension, there really is not point in doing this.
Morlan I voted for B as it avoids College Green, i.e. saves College Green from wires and poles, as it does with O’Connell Bridge and Street.
Even if the cables have ‘minimal’ impact on College Green as will be spouted, personally I couldn’t care less – cables are cables: wires that will clutter the views of our finest buildings. Admittedly it’s more than a bit ironic objecting to such features on O’Connell Brdge considering it was for these very reasons it was built in the first place, but I firmly believe that had Dublin trams survived 1949, efforts would have been made long ago to rid the city centre of unsightly cables especially College Green.Likweise having a major platform and all the ancillary crap that goes along with it will destroy Lower O’Connell Street; the very introductory stretch of the thoroughfare that requires the most coherence to establish the nature of the street. And as for the possible cable junction at Abbey Street 😮 – it doesn’t bear thinking about.
Route B avoids these issues, and although cables running by Government Buildings is a price that has to be paid, as is an undesirable additional bridge on the Liffey (even if well-designed), they are not as serious as the clutter that would be generated on our principal city streets – at the very time efforts are being made to declutter Dublin’s streetscapes.
November 29, 2005 at 8:35 pm #763486paddyinthehouse
ParticipantIt does not surprise me to see Route A emerging as the favourite from the online poll on grounds of directness, cost, etc. However, as someone who has, from time to time, had the misfortune to traverse the city centre by bus, it strikes me that any alignment involving Dawson St., College Green, etc, will be disastrous for all other modes of transport. Following changes in traffic management over the last number of years, the Nassau St – Suffolk St – College Green route is reserved almost exclusively for buses and taxis, and yet is chronically congested most of the time.
If much of this bottleneck is to be commandeered by a Luas alignment, untold disruption will be caused to every across-town bus service that currently struggles to crawl through. The connection along alignment A represents the best solution for those who are already fortunate enough to live in Ranelagh, Beechwood, Dundrum, etc, and the worst solution for everyone else who does not. The thousands of commuters who travel on 10’s, 11’s and 46’s of various descriptions will indeed be faster walking across town, just so that those lucky enough to zoom in on the Luas can connect with the Red line three or four minutes faster. (I assume no-one will be foolish enough to suggest that all bus commuters can disembark on Stephens Green and squish onto an already crowded tram to complete their journey. To those who suggest the possibility of shared-surface – this simply results in both trams and buses getting stuck in the mother of all traffic jams)
In my own opinion, Route B offers the best all-round solution for Dublin City Centre. It means that the critical stretch of Nassau St & College Green can continue to serve bus-travellers – the interaction occurs on St Stephens Green North, where part of the over-generous footpath could be sacrificed to facilitate all transport modes. Route B acts almost as a mini-inner-orbital, connecting three or four major radial transport routes (Buses 7, 10/46A, Dart, and the Luas itself) and also opens up a part of the city centre currently less accessible by public transport. In the longer run, it may have spin-off benefits of improving the Westland-Row, Pearse St. area, rather than adding another unwanted layer to the congestion around College Green. That this route also meets with aesthetic approval is merely an added bonus.
November 30, 2005 at 3:03 am #763487GrahamH
Participant@paddyinthehouse wrote:
St Stephens Green North, where part of the over-generous footpath.
This is a joke yes? Since when has any pavement in Dublin, let alone on the Green of all places been considered generous?!
If you refer to the paving that encircles the Green, this is the only element left that holds the place together as some form of a square. It cannot be touched.Good points about congestion]That this route also meets with aesthetic approval is merely an added bonus.[/QUOTE]
– the merely. It’s an important consideration 🙂
December 6, 2005 at 5:44 pm #763488fergalr
ParticipantI’ve been trying to think up more sensible routes than the one through College Green on http://www.harpingon.blogspot.com
I’d really appreciate comments and suggestions there.
December 7, 2005 at 2:27 am #763489JJ
ParticipantI have heard that the RPA are holding an open day this Friday at the Fitzwilliam Hotel about the Luas link options. RPA Staff will be there to answer questions and take comments. Its on all day as far as I know.
jjDecember 7, 2005 at 3:47 am #763490Morlan
ParticipantI have heard that the RPA are holding an open day this Friday at the Fitzwilliam Hotel about the Luas link options. RPA Staff will be there to answer questions and take comments. Its on all day as far as I know.
jjHave you a link there?
December 7, 2005 at 12:57 pm #763491jimg
ParticipantI looked briefly, Feargal. First of all your motivating assumption I think is wrong. Westmoreland St. and O’Connell St. are the widest in the city. A two track tram line uses the road width of one and a half traffic lanes. Westmoreland St. has six traffic lanes in parts, so claiming that running a tram line down it would take up all the road space is not even an exageration – at most it would lose 25%. Secondly I don’t agree with your priorities; your objections to the use of various streets seems to be on the basis that the street is required for cars and you propose instead to take entire streets from pedestrians along the Fleet St. axis (these are genuinely narrow streets, you’ll barely have room for a footpath).
December 7, 2005 at 10:05 pm #763492Devin
ParticipantI think Luas should go down Grafton Street on its way to O’Connell Street ( 🙂 ) . Is this route up for consideration?! In Amsterdam, trams go down a busy shopping street, Leidsestraat, with no great problems (below). Would help to clear some people off Grafton Street too!! There are always too many people on it! And it’s the shortest, most direct route … no right turns!
December 7, 2005 at 11:44 pm #763493adhoc
ParticipantAgreed Devin. Its much the same on Zurich’s car-free Bahnhofstrasse, the main shopping street in the city.
Admittedly, its a bit wider than Grafton Street. It would be interesting to get a response to this from the RPA at Friday’s clinic.
December 7, 2005 at 11:54 pm #763494Morlan
ParticipantIt’s just not going to happen, lads.
Have you forgotten about the fuss kicked up over Harcourt St?