Luas Central – Which Route?
- This topic has 319 replies, 62 voices, and was last updated 15 years, 10 months ago by
Smithfield Resi.
- AuthorPosts
- March 21, 2006 at 11:22 pm #763595
ctesiphon
Participant@adhoc wrote:
Take your handbags outside gentlemen/ladies
Posts regarding CIE/RPA/Luas/Metro bashing/supporting have become excruciatingly boring/repetitive/mind-numbing of late. [delete options as appropriate]
Heh. Agreed. Or at the very least use one of the Luas threads on here. When I open this thread I want to read about O’Connell Street- if the Luas debate is part of that debate, then fine.
March 30, 2006 at 3:33 pm #763596Anonymous
Inactivewoops
March 30, 2006 at 3:33 pm #763597Anonymous
Inactive@a boyle wrote:
Do you reject that building the green line to metro standard would easily have cost an extra 400 mill , given that the rough estimate for the northern metro is 3/4/5 billion. ? Again what specific things did the rpa do that are so bad.
Yes,
the green line had the new Taney bridge re-specified and little else on the route as they inherited a Victorian track bed built to accomodate two braod gauge lines.
I like your use of 3/4/5bn it aptly describes just how clear it is that figures are just being plucked from the air; far from business like.
March 30, 2006 at 4:38 pm #763598a boyle
ParticipantThomond Park wrote:Yes,the green line had the new Taney bridge re-specified and little else on the route as they inherited a Victorian track bed built to accomodate two braod gauge lines.
I like your use of 3/4/5bn it aptly describes just how clear it is that figures are just being plucked from the air]
Yes but no. The foundations had to be fully dug up so to allow for diversion of telephone,gas,electricity pipes. Following that the foundation had to be redone.The foundations are just a start with reinforced track to lay down.Third the electric system is very expensive. The new electric system put in for the DART cost 170 million, and the dart doesn’t come near to the level of electricity required for a fully fledged metro. So it is easy to see how 400 could be spent on the green line. To say that only the taney bridge required redoing is plain wrong, everything on the route had to be upgraded. Trams fully loaded weigh 30/40 tonnes. Metros can weigh hundreds of tonnes. The RPA’s forward thinking is something that we will be very very grateful for when we can progressively move to a metro on the green line with a minimum of fuss.
As per plucking figures out of the sky , I have to agree with you ! Experienve has shown that all large engineering projects like tunnels and metros and the like always over run. The reality is that it’s not possible to cost say the port tunnel until it has been done, as every tunnel is completely different and has to be designed from scratch. That is not to say that great waste doesn’t occur but with respect to the luas the money has been well spent. Mr park if you don’t accept this fine let’s stop this and agree to disagree.
March 30, 2006 at 5:24 pm #763599Anonymous
InactiveI think that any agency charged with procuring anything need to be experts in securing value for money; the RPA do not run railways all they do is procure the infrastructure and tender the operation of same. If one of my clients sent me out to acquire a building and I had a budget for
March 30, 2006 at 8:49 pm #763600a boyle
Participant@Thomond Park wrote:
… If one of my clients sent me out to acquire a building and I had a budget for £40m and I came back having spent £83m I would rightly be replaced by someone who could do the job. …
In relation to the costs above the costs for excavation, relaying utilities and electricity had to be done anyway bearing in mind that phase 1 Luas was not intended to be horse drawn.
Again you have missed my point , so one final time. All the original costings were for tram grade. The final product is a combination of tram and metro grade.Your example should read: if one of my clients gave me a budet for 40 million and i came back and suggested that in the long run it might be better to spend 83 million.
With respect the to the point of having to divert utilities , you have completely shot through your previous suggestions of the “vitorian line” and only the taney bridge requiring a change of spec. By excavating the track , it meant there were no old foundations on which to build. No foundations, no track, no bridges. The only thing that was left was a right of way. You are wrong to complain that because the line previously coped with trains it was an easy job.
another thing to consider is that while other countries might appear to have much cheaper tram systems , the cost of diverting utilities is borne by each company involved , or diversion doesn’t occur. In ireland diversions are payed by the rpa. (economically it makes no difference , but on paper it does). This additional cost is also part of the metro price tag.
While it would be nice to be an expert in costing , it is simply not possible to do it to an accuracy that would satisfy you ! For example , the jubilee undeground ended up costing 425 million euros per kilometre due to tunnelling difficulties. The madrid extension that every paper talks about cost 50. the rpa are hoping that it will come in around 80 million per kilometre.They simply can’t and won’t be able to come up with a more accurate figure.
March 30, 2006 at 9:00 pm #763601Anonymous
InactiveBest handbag out:
Are you really trying to say that a luas line wouldn’t have required.
1> Acquisitions
2> Excavation
3> Utility diversion
4> Trackbed assessment and strengthening work
5> Electrical cable support systemThe only real difference was that the deck of the Taney bridge had to be constructed to a wider specifiaction;
all of the track and rolling stock and power set up is specified to tram standard and unlike metro standard the green route has a number of at grade crossings which could have been eliminated if an extra 100% was available for the budget.
The other costs associated with its future proofing were negligible as all specs were governed to the standards laid down in accordance with rail safety legislation which only considered broad gauge. The money was simply squandered by extremely poor project managment skills or lack thereof.
I would be very worried if the RPA discover large scale utilities at 50-100m below ground.
March 30, 2006 at 9:36 pm #763602a boyle
ParticipantYou just can’t get enough abuse can you ?
1 excavation: the foundations for the tracks , would have to cope with hundreds of tonnes. (Compare foundation for a ten story appartment block to a bungalow and you get the picture).
2.utilities diversion , this requires digging up everything up, leaving you to start from scratch , not with an old rail line, that has just had it’s tracks taken up.
3. In the same way as a winding road in the wicklow hills will occasionally have gravel spread over it’s length as surfacing , while a motorway has purpose designed tarmacadam to a high spec in order to cope with lorries. The same thing applies to the metals tracks and everything below : two grades , one cheaper , one not so cheap.
4.The electric system. : why did they need change the dart electric system using your logic ? (the dart upgrade cost 170 million). I will tell you why. if there are metros comming every 90 seconds at peak time, and each metro weight 10 to 20 times a tram , then you have to be able to deliver a whole lot more electricity safely. So you wouldn’t suggest that the wiring in a home was sufficient for a factory , would you ?.
5. Bridges: deciding you need a bridge that can cope with a lorry instead of pedestrians is NOT simply changing the specs.
6. between sandyford and the canal there are 2 at grade junctions. They will simply be closed. total cost : no euros!
7. a large part of additional expense went into blasting the rock cutting between stillorgan and ballaly stops, so that it could accomodate the much wider metro.as someone with an ego the size of robert maxwell , i know how hard it is to be wrong, but it is ok thomond.honestly
March 31, 2006 at 3:17 am #763603Anonymous
InactiveI just want to point out that the so called metro upgrade on the green line will not be a real metro (ie a heavy rail line) but will be a Light Rail system (ie a tram, based on the Porto system) which has been branded as a metro, probably to fool the people into thinking they’re getting a metro system.
Also this so called metro will run through streets, so you can forget the 90 sec frequency. This also will apply to the current RPA Cherrywood extension proposal. So all the extra effort regarding the green line been able to be upgraded to a (heavy line) metro has gone to waist.
March 31, 2006 at 11:16 am #763604Anonymous
InactiveWH,
on the money as always;
now time to take the handbag, why am I thinking a 1989 film about advertising?:
@a boyle wrote:
You just can’t get enough abuse can you ?
1 excavation: the foundations for the tracks , would have to cope with hundreds of tonnes. (Compare foundation for a ten story appartment block to a bungalow and you get the picture).
What does a fully laden Luas weigh, what does a proposed and promised fully laden 50m Luas weigh? We are not talking about a Nissan Micra here.
@a boyle wrote:
2.utilities diversion , this requires digging up everything up, leaving you to start from scratch , not with an old rail line, that has just had it’s tracks taken up.
Are you trying to say that if this were Luas alone that the utilities could have stayed in-situ?
@a boyle wrote:
3. In the same way as a winding road in the wicklow hills will occasionally have gravel spread over it’s length as surfacing , while a motorway has purpose designed tarmacadam to a high spec in order to cope with lorries. The same thing applies to the metals tracks and everything below : two grades , one cheaper , one not so cheap.
What are you talking about the same width of trackbed had to be accomodated]4.The electric system. : why did they need change the dart electric system using your logic ? (the dart upgrade cost 170 million). I will tell you why. if there are metros comming every 90 seconds at peak time, and each metro weight 10 to 20 times a tram , then you have to be able to deliver a whole lot more electricity safely. So you wouldn’t suggest that the wiring in a home was sufficient for a factory , would you ?. [/QUOTE]
The power units run at Luas spec; the poles are the same regardless of voltage what is your point or more to the point where is the Dart spec equipment on the Luas network, is it on planet RPA?
@a boyle wrote:
5. Bridges: deciding you need a bridge that can cope with a lorry instead of pedestrians is NOT simply changing the specs.
There is little civil engineering spec difference between a Luas and a Dart in terms of load bearing capacity as stated ad naseum the rail safety rules are the same and the number of bridges low.
@a boyle wrote:
6. between sandyford and the canal there are 2 at grade junctions. They will simply be closed. total cost : no euros!
Then why have additional at grade crossing been proposed on the extension? Either the RPA are as stupid as they look or Cullen is telling lies about an upgrade to metro on this route.
@a boyle wrote:
7. a large part of additional expense went into blasting the rock cutting between stillorgan and ballaly stops, so that it could accomodate the much wider metro.
as someone with an ego the size of robert maxwell , i know how hard it is to be wrong, but it is ok thomond.honestly
The expenditure at this point was flagged in the original EIS it was a known cost; your nit picking has led you to forget that your theory relies on a hypothesis that the Red line was delivered on budget i.e. €225m and that the Green line came in at €600m or 3.5 times its original budget.
You certainly have Maxwells capacity for figures and I think that Seamus Breananns admission that the sums over the past 5 years have been done on the back of a cigerette box are equally valid.
Why are you an apologist for this type of group?
August 25, 2006 at 4:26 pm #763605SeamusOG
ParticipantI realise there are other issues dealt with in this article but, in relation to the LUAS, it looks like we might soon get an answer. If they’re using the Archiseek poll to decide, it’ll be a tough call.:p
@Irish Independent, Today wrote:
D-day looms for Metro rail route
THE route of the Metro North rail link from the city centre to Swords is to be announced next month, writes Paul Melia.
The Railway Procurement Agency said yesterday it will also reveal how the existing Luas Red and Green lines will be linked through the city centre and that an announcement would be made following the September board meeting.
Also yesterday the RPA said consultants had been engaged to carry out feasibility studies on the proposed Metro West route that will eventually link Tallaght to Ballymun.
The first phase from Tallaght to Clondalkin is due for completion by 2009.
A spokesman said it was hoped to put a number of routes out for public consultation in October or November, and that a number of different routes were being considered.
Various options
“The real issue is how it will get from Tallaght to the airport, and we’re looking at various route options there,” he said.
“We have a preferred route for Metro North, and the board is expected to endorse this.
“But there are still a number of issues to be resolved, including whether the airport station will be underground or overground, and how the metro will travel through Ballymun.”
The Metro West project is expected to be fully completed by 2014 when Tallaght will be linked to the airport via Clondalkin, Lucan and Blanchardstown.
August 25, 2006 at 8:07 pm #763606Frank Taylor
ParticipantThe correct answer to which route, may be ‘none of the above’. The original intention was to connect the airport metro to the southside luas line and this is now mysteriously not even an option. We are to have instead two separate lines running at the same gauge that terminate in the same place in the city centre but are not connected. The capacity of the southside luas line will continue to be crippled by its on-street section. The tunnel boring machine for the northside metro will be abandoned under Stephen’s Green rather than finishing the job by tunneling on to surface at Ranelagh and join the existing line
So there is a consultation process but the public was not consulted about the most important decision of all.
City centre roadspace is precious. A north-south underground link would free up the road section along harcourt street and stephens green and the unbuilt section between Stephen’s Green and O’Connell Street to be used by pedestrians, buses or bikes whichever makes most sense.
Does anyone know why the north-south metro was abandoned in favour of building this nonsensical on-street link?
September 18, 2006 at 4:47 pm #763607SeamusOG
Participant@The RPA wrote:
From St.Stephen’s Green terminus OPTION E runs along St.Stephen’s Green North. At the Dawson St. junction the line splits with one track for trams heading north towards the Red Line running along Dawson St. as far as Nassau St. while the track for trams coming from the Red Line extends further east along St. Stephen’s Green North and runs along Kildare St. and Nassau St. before rejoining the other track in Nassau St. at the Dawson St. junction. From Nassau St. the line would continue into the lower part of Grafton St., College Green and Westmoreland St.. Approaching O’Connell Bridge the two tracks separate to run on each side of the traffic median on the bridge and continue into O’Connell St. running on each side of the median to connect with the Red Line at the junction of O’Connell St. and Abbey St.. Possible stop locations include Dawson St. (for trams heading towards the Red Line), Kildare St. (for trams heading towards the Green Line), Westmoreland St. and O’Connell St.
Perhaps someone could help out here, as I can’t seem to copy the picture illustrating option E.
It’s just that a thought occurred to me over the weekend about this possibility, which is comfortably the least favoured option on this forum.
And it’s this. If the trams were to go South instead of North along Dawson Street, and North instead of South along Kildare Street, it might help to reduce the conflicts between the trams and buses in and around TCD. There could be a tram stop on the East side of Dawson Street (perhaps doubling with a station around the corner on the South side of Nassau Street), the West side of Kildare Street and the East side of Westmoreland Street]also travelling in the same direction[/I] to perhaps a couple of hundred metres (between the bottom of Dawson Street and the stretch around the front of TCD), with the loss only of the stops at the front of TCD, the potential conflicts could be seriously reduced.
The same kind of thing could also be achieved by reversing the bus flows along Dawson Street and Kildare Street. With the current arrangements around St. Stephen’s Green, that might even be more favourable.
Anybody get what I’m on about?
December 11, 2006 at 5:56 pm #763608The Denouncer
ParticipantI read an article in the Irish Mail on Sunday yesterday that says that due to objections raised by Dublin Bus, Route A is now dropped in favour of Route B..anyone else see this?
December 21, 2006 at 1:34 pm #763609jimg
ParticipantSo it looks like we’ll be getting the worst of all worlds: a new bridge and a needlessly complex and confusing route with no extra integration with DART while still not addressing the non-issues (for me) of construction on O’Connell Street and poles on College Green.
@Irish Times wrote:
The proposed route from St Stephen’s Green, to be announced today, would run as a double track to College Green, where it would change to single track and run north via Westmoreland Street, O’Connell Bridge and along the west side of O’Connell Street.
It would turn into Cathal Brugha Street and then run south along Marlborough Street, crossing the Liffey on a new bridge and continuing via Hawkins Street and College Street to rejoin the double track section at College Green.
December 27, 2006 at 6:33 am #763610GrahamH
ParticipantFrank Allen made his by now biannual PR appearance on Today with Pat Kenny last week – you can hear it below at 1:44:44:
http://www.rte.ie/rams/radio/latest/Thu/rte-todaywithpatkenny-tpk.smil (12 mins)
So only Route A and this new route ‘Route F’ are on the table at this stage. It’s now a matter of consultation with the ‘stakeholders’ to see which gets the green light according to Allen – traders who shout the loudest from the sound of things.
It is the opinion of the RPA that an adequate DART connection will happen via the Interconnector at St. Stephen’s Green – I wonder could some trams travel direct to Connolly (DART) by switching lines at the Marlborough St-Abbey St junction too?Whatever about the transport implications, I have to say I find this proposed interconnector is getting more and more ludicrous by the second as regards its impact on the urban environment. With this Route F not only is the jewel of College Green affected by cables and poles, as well as O’Connell Bridge, but now we have cables passing by the entire frontage of the GPO – inches in front of the portico! Not to mention cutting across the upper street at Cathal Brugha St, and the new bridge over the Liffey, itself laden with poles and overhead cables, in addition to the same on O’Connell Bridge (also passing O’Connell Monument), and the Loop Line already further down the river. The sole redeeming factor of this new route is that it limits the impact on Westmoreland Street, O’Connell Street, Bridge and Monument by one line – even if it just transposes the other elsewhere.
This just reeks of the very worst kind of impact on the urban environment – intrusive, untidy, cluttered and fundamentally ugly. For the scheme to be suddenly extended on this scale at such a late stage, significantly impacting on newly included heritage areas, when the potential for investigating powering the system in an alternative fashion is redundant, appears almost devious, as it is disrespectful to the built environment of the city.
From day one back in the 1990s there has been a constant underlying current of ‘sure this is only Dublin, a dirty provincial west Brit city – it’s not Venice you know, huh huh huh’. Essentially nobody cares about this issue at all – rather this link is being dealt with purely as a series of lines on a map and the investigation of technicalities of the project. It seems aesthetics don’t even enter the equation. Why aren’t renderings being drawn up, and the impact on the appearance of the city being given equal, or indeed any weight at all, relative to the logistics of getting passengers from A to B? Why were no visual impact boards on display at any of the public ‘consultations’, even just to allay concerns?
This is not just about choosing a convenient route for a tram, it’s also about a hugely important matter of respecting existing environments within the ‘monumental’ city core. What purpose does College Green serve only to provide an architectural heart for the entire city – it is the very essence of this space, as with most western cities in the 21st century with similar public areas. It has little other role – and in the context of removing vehicular traffic and horrendous levels of municipal clutter from the space, including large trees, it’s nothing short of baffling that a relatively minor public transport link is allowed hold such sway in its impact on this area with absolutely NO visual impact statement in public consultations.
Yes lines passed through here before blah blah, yes O’Connell Bridge was rebuilt as is to cater for trams, yes they ran right past the GPO blah blah, but this is irrelevant. As mentioned before, if it was proposed to run telephone cables through the city to the same extent, right past the principal buildings and urban spaces in the capital, there’d be absolute uproar. But because shiny silvery trams are being catered for, suddenly nobody gives a toss. In a modern, technologically advanced capital, it is simply not acceptable for the cityscape to be strung with cables – it’s one thing if a legacy issue, but to start afresh in the 21st century is nothing short of embarrassing. It is this above all that really frustrates me about this interconnector (which otherwise I do see the
full logic of implementing).It is ironic that this link attempts to cater to a large, if minority extent, for tourists travelling from transport hubs to city centre hotels – the very people the city is being marketed at through its streetscapes and set-piece buildings that will be affected by these lines. Views of the Spire from Westmoreland Street would also be intruded on, as with the entire walk along western O’Connell Street and Bridge, and vastly worsened if Route A is chosen. Likewise regarding all the famous views of the BoI, Trinity and the House of Lords portico – all the points rasied before.
In a way it’s quite startling the difference between here and Bordeaux, where uproar was raised at the prospect of cables passing the h
December 28, 2006 at 3:30 pm #763611Anonymous
InactiveI heard the Frank Allen interview too …. very dissapointing.
It seems they are set on ramming it through the central artery of the city where it will be forced to travel at a snails pace & negotiate several traffic signals, Both the aesthetics & functionality of this are dreadful.
The RPA seem to be tripping over themselves after this prize, as they’ve presented it, of running straight through the centre of the city … ‘great visibility for luas’ brilliant alright, stationary trams will be on full view to the general public wizzing by on footpaths.
In my opinion, luas could skirt around the back of trinity as quickly – use of secondary street space where luas can be afforded priority is the only way to go. They still contend that both tracks will not ‘fit’ down marlborough street,
Besides all that, the actual necessity for & benefits from this link are questionable in the first instance.
I cannot believe that they will plough up O’Connell Street for this, what a mess. Not a murmur out of Kenny about the aesthetics of it either … not surprising as he actually suggested routing it down Grafton Street 😮
College Green needs an IAP now, even felling the trees would be something for now.
On the up-side, The red line is to be re-routed at the Red Cow, allowing it to pass through without stopping at lights, it also eliminates the tight bends. They’ve recently released the new configuration after much criticism of previous versions. Photomontage below:
December 28, 2006 at 3:31 pm #763612Anonymous
InactiveRed Line Luas passengers up 25%
December 28, 2006 11:33
Luas passenger numbers increased this year from 22 million to 26 million, a jump of around 17%.The Red Line, which runs from Tallaght to Connelly train station, saw passenger numbers rise 25% this year.
Public consultation has commenced on the proposed extension of the Green Line from Cherrywood to the Bray area, and the possible connection of the Green and Red lines is under consideration.
I agree with sentiments above and feel that there are other compelling arguments to take this process back to the drawing board. Firstly the effect of unjoined systems the two routes under consideration will probably have a common halt but from what I have seen will do nothing to further the figure of eight model that would allow interchangeability between routings and could if done right assist the creation of a flexible expandible system.
January 2, 2007 at 9:36 pm #763613jimg
Participant@GrahamH wrote:
Just out of interest jimg, given overhead wires generally don’t concern you (not being smart here), how do you rate them relative to your rather vociferous objection to the proposed advertising hoardings about the city?
Hi Graham, I was exaggerating a bit when I said the overhead wires are a non-issue for me. I can see the attraction in a third rail system for the centre but I know that cost/benefit analysis would not support it at the moment. Everyone will have personal views on the aesthetics of street clutter; for you the wires are a major problem. For me, the fact that the poles are properly vertical (unlike 80% of the traffic signs in the city), polished stainless steel (rather than mottled galvanized) and set in a regular pattern (rather than shoved into a gouged hole with a bucket of cement slopped in for support) means I find Luas clutter much less objectionable than the hundreds of superfluous street signs, badly planted trees, poorly placed telephone boxes, etc along the stretch in question. I find Luas fittings only slightly more intrusive than the new street lighting on O’Connell Street for example.
What worries me is that this new route F doesn’t address any of flaws of route A but it manages to add plenty of new disadvantages. The worst for me will be a new bridge between O’Connell Bridge and Butt Bridge; this will destroy the relatively regular pattern of bridges in the city and will create an ugly cluster of bridges around Butt bridge.
Seing as all the other options have been removed from consideration, would you not agree that A is far preferable to this new mongrel route?
January 2, 2007 at 10:13 pm #763614Seanselon
Participant@Morlan wrote:

Double-decker buses can travel under it… I don’t see why the LUAS can’t. Probably a safety issue for minimum clearance. I would’t like to see Westland Row lowered, I think it would spoil the street somewhat.
Luas and its pantograph, and of course the overheads, would not fit safely underneath this bridge methinks.
- AuthorPosts