Look at de state of Cork, like!

Home › Forums › Ireland › Look at de state of Cork, like!

  • This topic has 1,897 replies, 111 voices, and was last updated 17 years ago by bosco.
Viewing 20 posts - 1,601 through 1,620 (of 1,898 total)
  • Author
    Posts
  • #733862
    -Donnacha-
    Participant

    By the way…

    A big welcome to the OMP boys who just opened thier Cork office on South Mall, the office is to be headed by Conor Kinsella

    #733863
    kite
    Participant

    @lexington wrote:

    😀 Following incalcuable trials and tribulations, 2 designs later, Mark Kelleher (of the Kelleher family, former owners of the Bishopstown Bar [which recently was sold to Mr. Horgan for 8m euros!] among other properties), has been given the greenlight by CCC planner Evelyn Mitchell for 53 of the 73 residential units planned for a collective of adjoining sites off Curraheen Road at Westend near Bishopstown. The project, pleasantly designed by Frank Ennis & Associates, received over 124 seperate objections for residents, groups (like CAHRA) and local councillors – and will be granted subject to the removal of an entire section, the 20-units of Block C.

    I’m very glad that CCC saw through the substantial cock-and-bull in the logic of many of these objections (too often over-lapping – and many more referring to the details of the previous incarnation of the development!) – which objection often on the grounds of the developments ‘high-rise’ nature (of 3/4-storeys – depending on how you see the mansard roof). :rolleyes: This is a positive move. Unfortunately, Jerry Buttimer and posse have informed me that an appeal will be sought, one individual stated that ”high-rise is suitable in other cities, but not Cork”. I take it we should tear down every house and building 4-storeys and over then, right?

    A constructive move by CCC.

    Images sought, and hoping to have some soon.

    Thanks to “himself” up in Dublin and the northern sir for info in light of my absence. You’re help is kindly appreciated.

    P.S. What a ridiculous headline in the IE article today stating ‘High-rise Development Granted’ then continuing to discuss the 3-storey development! :rolleyes:



    Just on a side-note, I find it rich to see councillor Jerry Buttimer object and publicly defame Mr. Kelleher’s project on grounds such as traffic increases and height among other things given that a project, recently lodged by his GAA Club, which he also chairs, represents a far greater threat to the community than that at Westend.

    Bishopstown GAA’s plans for CUH usage of its car-park will cause increased volumes of traffic in an area of dense family housing, throughout which many children – who play in the park’s green areas – may be at risk (God forbid!) to incidents consequent of the increased movements. I’m all for sports clubs trying to rail in the revenue when able to do so – sport is an integral and important part of our society and culture – but this project, given its location, poses a far greater threat to the community than Mr. Kelleher’s proposal ever could. Anyone who knows this area well, will be aware of how one must constantly keep their eyes peeled for children speeding across the road in their tricycles without warning or chasing a ball onto the road from a green. Of course this is the case anywhere, but especially here given that this is essentially a large, maze-like housing estate with strong population of young families. Feel free to object. :rolleyes:

    I agree, Cllr.Buttimers backing of a few local cranks and the CSD (CAHRA) lobby group is doing the city no favour. Pity Cllr. Buttimer did not have the same vigour when Mr.Montgomery was planning his Mills development.
    Maybe the GAA connection proved too strong?

    #733864
    lexington
    Participant

    🙂 Blackpool Developments (The Shipton Group) have withdrawn their appeal regarding the conditions imposed by CCC on their plans to make changes to their original office and retail building at Blackpool Park, permitted under 03/27555.



    😎 Meanwhile Frinailla have withdrawn their appeal applications on to commence subsurface investigations on their Ladyswell sites – this follows the lodgement made pursuant of a CCC refusal. The Ladyswell development applications are still in appeal.



    Too many forms – indeed a welcome to OMP, it would seem they could have their hands full over the coming years from some of the rumours persistent!



    @ CITY BOY wrote:

    Word on the street today that the deal with Tom Scriven a.k.a rebel bars and redzs
    is in deep trouble.Contracts where sighned but no funds transfered for over 3 months.
    Has Mr Scrivens buying spree come to a dramatic end?

    That compunded with a bad planning run; he seems to have/had a plenty few ideas on some of his existing properties too. Curious. Hmmm. :confused: Is there a possibility of a number of licensed premises coming for sale on the city market soon do you think? Lips must be licking.

    #733865
    Anonymous
    Inactive

    @Radioactiveman wrote:

    [font=Impact:7bai9j19] **Wanted** [/font:7bai9j19]

    The Marlboro Street Echo Boy Statue

    Last seen about 3 or 4 years ago before being removed for urgent surgery (re-installation of a detached cranium).
    Anybody knowing his whereabouts should post it here. Also, tell the Examiner because they’re always very quiet on the subject 😎

    You should stick that post into the Examiner classifieds office as a paid Ad in the Echo and see if they publish it

    #733866
    phatman
    Participant

    Just noticed, why’s this thread only worthy of four stars? It’s a 5-star in my opinion if ever there was one, cmon people use your vote! 😀

    #733867
    Radioactiveman
    Participant

    As I pointed out above, AIB’s Watercourse Road development has been appealled to ABP. By Kathleen Lynch TD.


    #733868
    opus
    Participant

    @phatman wrote:

    Just noticed, why’s this thread only worthy of four stars? It’s a 5-star in my opinion if ever there was one, cmon people use your vote! 😀

    Ok ok, just voted! Has that done the trick?

    #733869
    The Glass eye
    Participant

    ah yes an extra star 😀

    #733870
    phatman
    Participant

    @opus wrote:

    Ok ok, just voted! Has that done the trick?

    Hey-Hey, just goes to prove every vote counts!

    #733871
    Radioactiveman
    Participant

    [font=Impact:2r1k2rmg]**FOUND**[/font:2r1k2rmg]

    Well, either this thread has powers beyond our wildest dreams or its just a sheer coincedence (most likely the latter 😉 ) but, we’ve located the Echo Boy.

    According to Graham Lynch’s report in today’s INSIDE CORK, the statue has been repaired and is due to be re-erected on Tuesday 7th June or Wednesday 8th of June, this time on St. Patrick Street.
    After talks between CCC and Examiner Publications, it has been decided to erect the bronze statue near the historical enterence to the Examiner Office (located near the new CORK 2005 information office).
    The statue had been repaired in Dublin at a cost of € 7,500. This came after unsuccessful and misguided attempts to repair it in situ using concrete.

    Is this the beginning of the end of the new , clutter free St. Patrick Street?
    Is it a good idea to move this statue from it’s original location?

    #733872
    Anonymous
    Inactive

    I’d make an exception for this one it is a unique piece

    #733873
    A-ha
    Participant

    [font=Arial:3b03otd1]I read last week that Cork County Council want 2500 houses built in Midleton over the next few years. They believe Midleton would be more suited as Corks main satellite town over Mallow as the East Cork region is one of the fastest growing area in Ireland. Does anyone know where all of these houses will be put? I cant think of any sites in or around Midleton that would support that number of houses. I also read that Midleton Town Council are trying to get it's bounderies extended so that the town will become the same size as Galway City. Is there any truth in that statement or did someone just get carried away writing??[/font:3b03otd1] :confused:

    #733874
    -Donnacha-
    Participant

    The majority of the new building is to go north of the town, in the area around Broomfield. Not sure about the ‘size of Galway’ line, but the reckoning in the Draft Special Local Area Plan is that the population will be of the order of 23,000 by 2020 – the presence of the rail link being justified by a large, critical mass of housing and services.

    A lot of this is old news, its already set out in the County Development Plan (2003) and the CASP, but the Draft Local Area plan is here;

    http://www.corkcoco.ie/co/pdf/573054653.pdf

    #733875
    rodger
    Participant

    Yes Midleton is going to see huge growth over the next few years.It is going to be interesting to see how the road network is going to cope.

    All this plan has done is drive prices up in the Western and southern suburbs and create traffic chaos on the N-25.

    I think it is most evident on the recent sale of 6acres of land on the Curraheen Rd. at 1,750,000/acre.Although come to think of it Bride View paid 1,000,000 an acre in Midleton last year,I think we may be looking at another jump in house prices.

    It is starting to get expensive out there!

    #733876
    A-ha
    Participant

    [font=Arial:3sq7soxy]Traffic will get worse, but thank god it's all dual carraigeway from Midleton to Cork. I cant even imagine what the main road to Cork would be like for commuters every morning if the dual carraigeway wasn't there. Didn't the old road to Cork go though both Midleton and Carrigtohill??? How dreadful! [/font:3sq7soxy] 😮

    #733877
    A-ha
    Participant

    [font=Arial:prs7ts2z]Ohhh, also, I'm so delighted that Cork Airport Authority is in talks with Ryanair about opening up new routes to mainland Europe and Scandinavia. If theres anything that Cork needs it's cheap flights to the continent, not just London.[/font:prs7ts2z] 😀

    #733878
    Pana01
    Participant

    Living in East Cork (Youghal), and commuting to Ringaskiddy every day can be very stressful.
    I clearly remember driving through Midleton, Carrigtwohill and Glounthuane and even through the city (prior to the tunnel) to get to work.
    The commute isn’t too bad, apart from the nightmare that is the traffic lights at Castlemartyr. It’s a frustrating bottleneck, used to allow a few cars and tractors access from Shanagarry and Mogeely. When the lights are out of action, the traffic flows freely. Every other day, however, traffic is tailed back on both sides of the bridge, because of these hideous lights.
    I read that there is a long term plan to include a dual-carriageway from Midleton to Youghal – anyone else hear of this??

    Back to the architecture – anyone know what will be built in the Beasly Street car park site, backing onto Parnell Place, and when it will commence?

    #733879
    -Donnacha-
    Participant

    If you look in section 5.2.14 (p20) of the original Midleton ED plan, theres an outline of NRA proposals for that section of the N25 – they mention 2010-2015 as a timeframe, which would make sense given the funding time frame – after the major inter urban routes will be completed (not including the Kilcullen to Waterford stretch). The Cork Limerick route and the Northern Ring should also see major developments in that timeframe.

    Theres also plans for two northern roads around Midleton, one is in planning now and will be quite close to the town, the other is mentioned in the Special Local Area plan for Midleton, and will be further out, designed to serve the developments to be constructed in the Broomfield area. The second one is probably 10 years away though, if ever.

    Midleton ED Plan.

    http://www.corkcoco.ie/co/pdf/93560153.pdf

    #733880
    jungle
    Participant

    @Pana01 wrote:

    I read that there is a long term plan to include a dual-carriageway from Midleton to Youghal – anyone else hear of this??

    In terms of the cost of this, would it not be better to look at reopening the Midleton-Youghal railway line? Dual-carriageway is expensive to build and would require large CPOs, whereas the railway line, although in need of significant repair, is already there and the land is in state hands.

    #733881
    -Donnacha-
    Participant

    In terms of the cost of this, would it not be better to look at reopening the Midleton-Youghal railway line?

    Unfortunately, no. The costs of running the Midleton line to Youghal, at least in the medium term, are a lot higher than you’d expect, and the additional traffic generated would be much less that that required to run a service. Prioblem is that Youghal isn’t that big, it doesn’t have the capacity to generate that much extra critical mass. Midleton is being developed at the pace it is precisely because it does have extant critical mass to require such services, and it already has significant transport infrastructure.

    Additionally, a lot of the traffic on that section of the N25 isn’t local, it isn’t really that much of a commuter route, its a major route for heavy transport (read trucks). Upgrading the road is required anyways, the increase in business in the area is putting the network under severe pressure. Putting a sizeable park n’ride in Midleton, with enough trainsets to run a proper service, in addition to improved roads on the Midleton-Youghal section is the chosen solution for a reason. Whether it works out like that is a different matter.

    In any case, the railway alignment will remain in public hands. Who knows, in 20 years, when Midleton is a city in its own right (!), the maybe extending it will be an option. It isn’t now.

Viewing 20 posts - 1,601 through 1,620 (of 1,898 total)
  • You must be logged in to reply to this topic.