- August 3, 2004 at 12:51 pm #732522
anto
ParticipantGod I hope it’s in the city centre. Do Cork corporation want the whole feckin city to move out to Douglas/ Mahon are and be totally car dependent?
August 3, 2004 at 1:51 pm #732523Leesider
Participantsee the thing is anto as far as I know as part of planning getting approved for the Mahon project O’Callaghan had to build a conference centre along with it. Now he won’t invest in a city centre one as he understandably wants to protect his investment in Mahon. Supposedly plans are fairly advanced!
IMO it might be the best option if we want one in the next 2/3 years. CIE seem to be holding up any development for Horgan’s key every chance they get and the GAA want to buy the Showgrounds so they can do up Pairc Ui Chaoimh, which is badly needed as well.
August 3, 2004 at 4:26 pm #732524d_d_dallas
ParticipantThis is the same argument as Abbotstown – Lansdowne or Spencer Dock – Citiwest. It’s vital that if some form of conference centre is built in Cork it’s in the City Centre rather than in Mahon. Understandably Mr O’Callaghan wants to make the most out of his “mini-America” and make his hotel there more lucrative etc… but Horgans Qy or vicinity of Parc Ui C makes much more sense.
Couldn’t CCC just get him to drop his plans in return for some apartments on the land or something (worst kind of planning I know, but…).
August 3, 2004 at 4:26 pm #732525lexington
ParticipantCCC are advocating the Railway Street/Horgan’s Quay site for a new 6000 seat conference/convention centre – a shortlist of developers is currently being considered. I’ll name them as soon as I receive permission from the respective parties involved.
O’Callaghan Properties have a clause in their sale agreement to integrate a convention centre into the Mahon Point development – the agreement knocked IR£4.3m off the sale price – which contested against a higher offer by MacDonald Properties of Scotland of IR£50m for the lands. O’Callaghan and McCarthy Developments paid £41m between them for the Mahon lands. Failure to develop the convention centre requires O’Callaghan Properties to return 6m euros to CCC. O’C Properties are stalling on this one a bit, for internal reasons rather than viability, this is causing some frustration and CCC are anxious to move forward with Railway Street. I’ll be interested to see how involved CIE get in this project – it will be a reflection of their commitment to continuing with Horgan’s Quay.
Sisk Contractors have been chosen to construct the new Cork School of Music – with an initiation date of September. Although, I had reported this start date in a previous post, there had been some confusion in light of the financial problems experienced by PPP partners Jarvis Plc. It was expected at one point not to begin until Summer 2005, however now, it seems, the Dept. of Education and Jarvis are now both confident in proceeding with the project and will break ground this September. Some minor work has already commenced on the existing school (to face demolition), formal contracts are expected to be signed later this week.August 4, 2004 at 10:49 am #732526Leesider
Participantanyone have any information on what the story is with the bank of ireland building that is at the back of the south mall?? saw plans for it ages ago but nothing seems to have happened yet, it has been derelict for years now. The plans looked good though!
August 4, 2004 at 12:10 pm #732527Pana01
ParticipantThat building has been derelict for an incredible 53 years, according to recent press reports. It really is an eyesore. If they can’t renovate it, they should at least paint it.
Another point, Maylor Street is traffic-free between 11am-5pm on Saturdays. However, every Saturday, I can’t believe the number of taxis and cars bullying pedestrians out of the way, between those hours. Does anyone care – where are the traffic wardens/Gardai??
August 4, 2004 at 1:42 pm #732528lexington
ParticipantYes, the former mill to the rear of the Bank of Ireland, on Father Matthew Quay, has been purchased by Tumblegate Ltd. They also own the famour Jacobs On The Mall restaurant along South Mall. Tumblegate were granted permission for a mized retail, restaurant and residential development through renovation and extension of the existing mill but had been waiting on an amendment to the plan from CCC. They have recently received this permission and Joseph Lane Construction containers can been seen outside the premises ready to start construction. Some internal work is being completed first.
And I agree, taxis and buses are acting unfairly and aggressively toward pedestrians, who have priority, on both Patrick’s Street and Maylor Street. It is a shame on the authorities for not pursuing the offenders for dangerous driving more vigourously.August 4, 2004 at 2:07 pm #732529mickeydocs
ParticipantLexingon, do you have any further info on Howard Holdings latest proposed development on Alfred Street… this should be a good indication as to what to expect in terms of the regeneration in the area?
I was in the city at the weekend and I must say I am very impressed by the new art gallery in UCC, but very disappointed that this took priority over the greyhound track development. This site is now derelict for over six years. If I recall correctly this site sold for a huge sum. It’s typical of UCC. Their buildings on the Western Road and the Maltings are in very bad shape and at least in need of a lick of paint.
What’s the story with the row of houses across the street from the greyhound track?
Does anyone know what is being built on the Lee Road opposite the Lee Towers?
Number 6 Lapps Quay looks great, and it seems as if it will also revive Clontarf street which is quickly becoming one of the most impressive streets in the city.
On the subject of Taxi drivers in Cork, my impression is that in general (exceptions to every rule of course) they are a disgrace in the city. Their cabs are filthy and they can never seem to queue in any kind of order. They also believe that they can launch into conversations without invitation. CCC should have conditions attached to licensing.
On another topic, Parking should be banned from Pana 24/7 asap.
And I agree, taxis and buses are acting unfairly and aggressively toward pedestrians, who have priority, on both Patrick’s Street and Maylor Street. It is a shame on the authorities for not pursuing the offenders for dangerous driving more vigourously. [/B][/QUOTE]
August 5, 2004 at 11:15 pm #732530lexington
ParticipantHoward Holdings have proposed to develop a 15m – 20m euro IT/Office building, 5-stories over basement on Albert Quay. They’ve no project planned for Alfred Street (by the Railway Station) that I am aware of. The Albert Quay office building is being constructed on a site, directly across the river from their City Quarter development, and will incorporate Albert House (the Parking Fines building).
UCC have hired Cumnor Construction to refurbish their buildings at the Lee Maltings (a process in mid-swing). Work on their new 20m euro School of Pharmacy on College Road has begun, with initial clearing taking place currently. Pierse Construction begin primary work at the end of August, early September.
On the Lee Road, UCC have hired Sisk Construction to build the new Environmental Research Institute. Designed by Bucholz McAvoy Architects. The 3-storey, “environmentally friendly” building is at an advance stage, as anyone passing the extensive construction site and tower crane will tell you. The site was donated by CCC.
Work on a 62m euro UCC IT and Computer Centre at the former Greyhound Track on the Western Road is scheduled to begin at a preparitive stage come late 2005, depending on planning.
The houses across the way from the Greyhound Track on the Western Road are mostly in private ownership, there is no real story with them. However the 6 terraced houses at Carmelite Place, which are currently boardered up, were scheduled to be demolished as part of a 4-storey over basement car-park development for 20 student apartments, however planning for this project was refused on grounds of scale and inappropriate use.
No.6 Lapps Quay, along with No.5, City Quarter, the dismal but nonetheless refurbishment Bus Station, the Albert Quay office development, O’Flynn Construction’s major retail/residential development at Eglinton Street, 32m euro City Hall Extension, 60m Cork School of Music, Corbett Bros. Office Development at Copley Street, Howard Holdings’ Copley Hall, the South Infirmary’s new Breast Check Clinic at South Terrace and a number of other major development and rejuvenation projects are really gonna make this area of the city exceptionally attractive now and in the near future. Especially considering, all the above projects lay at the mouth of the new docklands development.
August 6, 2004 at 9:20 am #732531mickeydocs
ParticipantThanks Lexingotn. So will we finally see the end of those hideous warehouses on Albert Quay?
Any plans yet for the main docklands area next to the Grain Silos?
It’s great that the stench is finally gone from the lee in this area of town. I read somewhere that the docklands area will be suitable for bathers in the next few years. This is hard to believe but fantastic news for this area of Cork.
Has anyone heard anything about a proposed barge commuter service between city hall and Blackrock/Mahon?
I must say that I was very impressed with the rejuvenated Hugeneot district.
I’m also glad to hear that the former Methodist Church facing Waterstones is to get a new lease of life. This is a beautiful period building with immense potential.
Originally posted by lexington
Howard Holdings have proposed to develop a 15m – 20m euro IT/Office building, 5-stories over basement on Albert Quay. They’ve no project planned for Alfred Street (by the Railway Station) that I am aware of. The Albert Quay office building is being constructed on a site, directly across the river from their City Quarter development, and will incorporate Albert House (the Parking Fines building).UCC have hired Cumnor Construction to refurbish their buildings at the Lee Maltings (a process in mid-swing). Work on their new 20m euro School of Pharmacy on College Road has begun, with initial clearing taking place currently. Pierse Construction begin primary work at the end of August, early September.
On the Lee Road, UCC have hired Sisk Construction to build the new Environmental Research Institute. Designed by Bucholz McAvoy Architects. The 3-storey, “environmentally friendly” building is at an advance stage, as anyone passing the extensive construction site and tower crane will tell you. The site was donated by CCC.
Work on a 62m euro UCC IT and Computer Centre at the former Greyhound Track on the Western Road is scheduled to begin at a preparitive stage come late 2005, depending on planning.
The houses across the way from the Greyhound Track on the Western Road are mostly in private ownership, there is no real story with them. However the 6 terraced houses at Carmelite Place, which are currently boardered up, were scheduled to be demolished as part of a 4-storey over basement car-park development for 20 student apartments, however planning for this project was refused on grounds of scale and inappropriate use.
No.6 Lapps Quay, along with No.5, City Quarter, the dismal but nonetheless refurbishment Bus Station, the Albert Quay office development, O’Flynn Construction’s major retail/residential development at Eglinton Street, 32m euro City Hall Extension, 60m Cork School of Music, Corbett Bros. Office Development at Copley Street, Howard Holdings’ Copley Hall, the South Infirmary’s new Breast Check Clinic at South Terrace and a number of other major development and rejuvenation projects are really gonna make this area of the city exceptionally attractive now and in the near future. Especially considering, all the above projects lay at the mouth of the new docklands development.
August 6, 2004 at 10:03 am #732532corkdood
ParticipantDoes anyone know what they have done to the river to make it smell better? I heard rumours months ago that they had done a cleanup on the lake by Park Ui Chaoimh and were doing the same to the river but never heard the details – something about friendly bacteria I think.
August 6, 2004 at 11:24 am #732533prc
ParticipantOriginally posted by corkdood
Does anyone know what they have done to the river to make it smell better? I heard rumours months ago that they had done a cleanup on the lake by Park Ui Chaoimh and were doing the same to the river but never heard the details – something about friendly bacteria I think.in case u you have nt noticed over the last couple of years the whole city has been up in a heap with roads being dug up and services been relaid esb, gas and also sewage drains, these drains would have orginially drained straight into the river, venice styleee, and thus the river lee like so many othere cities looked dirty and smelled quite bad
see below and follow this link
http://www.corkcorp.ie/maps/drainage.html
Cork City’s waterways are one of its defining features. The River Lee separates into two channels to form the Central Island of the City. Since the foundation of the City, Cork’s sewage has discharged untreated into these channels. Each day 13 million gallons of raw sewage and polluted water flow into the River Lee and Lough Mahon, completely untreated. This is unacceptable for a modern City in the new millennium. Approximately £20 million has been spent on the City’s drainage system over a twenty year period prior to 1997, constructing sewers to intercept the numerous outfalls discharging to the river. This investment moved the point of discharge of the sewage downstream of the City centre. The City’s sewage now discharges through two main outfall points at Horgan’s Quay and Kennedy Quay.
August 6, 2004 at 12:29 pm #732534d_d_dallas
ParticipantSorry I have to laugh… hahahaha.
That little Main Drainage thing…
There seems to be a lot of activity in UCC. I remember plans being mentioned for the Boole – anyone got pics or specs? I really like the Boole as is – so imposing. Will the plans interfere, or are they conentrated within the quarry behind?
August 6, 2004 at 12:35 pm #732535corkdood
ParticipantI’m well aware of the main drainage scheme but the river is dirty and smelly well above that sewage outfall point.
I think the lake by Park Ui Chaoimh is called Lough Mahon – they’ve done a great job on that. i suppose its easier with a lake compared to a river.
August 6, 2004 at 3:54 pm #732536prc
Participanttwo words corkdood:
THE TIDE
August 6, 2004 at 4:43 pm #732537Craig Davis
ParticipantI think the lake by Park Ui Chaoimh is called Lough Mahon
It’s called Atlantic pond. That whole area, including the land on which Pairc Ui Chaoimh built, was a mud flat before being reclaimed from the River Lee when a dyke (now called The Marina road) was built sometime in the 19 century. It was a part of route for the old Cork, Blackrock & Passage Railway line.
In the Cork City Council masterplan for the area there’s a proposal of developing the pond into a marina, and of
harnessing opportunity for recreation and water activities through the introduction of a new internal dock and potential marina, and the establishment of an internal waterway corridor extending through the area towards Atlantic Pond
I think this could be great for the area, as its so under-utilised at present.
August 6, 2004 at 5:26 pm #732538lexington
ParticipantThe value of the Cork Main Drainage Scheme is actually in excess of 100m euro. The stench eminated from raw waste being dumped into the Lee, this, as of from the end of this month will now all be treated by the 20m euro Sewerage Treatment Plant on Little Island – as well as certain explusions from harbour region industrial plants. This will bring the Lee to EU bathing standards. Any remaining dirt in the Lee is now ‘simply’ related to inconsiderate and careless individuals, river bed movement, upper stream contamination (which will now be service by a new treatment facility near the Shornaugh River mouth before it enters the city) and shopping trolleys it would seem.
UCC have applied for a 5579m sq Boole Library extension to the southern elevation. The 5-storey extension will utilise the old quarry site at this elevation (currently a student recreation point and theatre entrance). The library will in the majority be designated for Postgraduate use. The main library will undergo an extensive refurbishment and modernisation in-line with the new building. The project, currently in planning, will cost an estimate 33.5m euros. The architects behind the development are Wilson Architecture of Cook Street, Cork.August 6, 2004 at 5:44 pm #732539Craig Davis
ParticipantUCC have applied for a 5902m sq Boole Library extension
Any idea of who the architects are for this lexington?
August 6, 2004 at 5:55 pm #732540lexington
ParticipantYeah Craig, Wilson Architecture. (I just edited that in up above – forgot it earlier.)
*UPDATES*UCC are to apply to construct a new 7m euro National Microtechnology Research Centre.
In addition ->Here’s an image of the new ERI building, currently under construction along the Lee Road. It’s not the best, so I’ll have more up in the future if possible.

Anyone further interested in the Boole Library extension may find this link insightful -> http://www.sconul.ac.uk/pubs_stats/newsletter/30/5.RTF
August 7, 2004 at 2:54 pm #732541lexington
Participant*UPDATES*
🙂 A new Bowen Construction tower crane has been erected today over the No.6 Lapps Quay office development site. Construction has been sub-contracted to Bowen by O’Flynn Construction who will concentrate their construction resources primarily at the Ballincollig Town Centre site. The new crane adds another progressive puncture to Cork’s already dotted skyline and hearlds the beginning of primary construction on the No.6 Lapps Quay project.
🙂 Howard Holdings have erected a large advertising banner on the river-side, southern elevation of their City Quarter office development. The sign reads “60,000sq ft to Let/for Sale”. Though this sign does not mean all that such space is available (and I am informed many deals have already been struck for the development tenancy), even if it did, it still means well over 1/2 of the entire development has been let or sold already. However the addition of a further office floor shows that Howard Holdings are already responding to the demand displayed for the project.