Developments in Cork

Home › Forums › Ireland › Developments in Cork

Viewing 20 posts - 1,101 through 1,120 (of 2,109 total)
  • Author
    Posts
  • #781818
    who_me
    Participant

    Was passing by Beasley St. yesterday evening and there were 6 concrete mixer trucks in a row churning away – it looks like work there has started in earnest. Does anyone have any pictures of the design again?

    Also, a new restaurant has gone into the City Quarter building on Lapp’s Quay. While it’s great to see the ground floor finally starting to be occupied, it is still a bit isolated in that location; not sure how well it can do.

    #781819
    Spinal Tap
    Participant

    @Pug wrote:

    have been in germany looking at property and all the building thats currently going on , bringing the old east germany type buildings to former west germany standards, there is usually a huge poster/banner type thing, sometimes the size of the building, showing what its going to be like when finished – some developments do have posters up around Cork to be fair – its just they might say something like “Development until 2007” and the building hasnt even started

    The Cornmarket St.S.C. has a banner which states that they will be open Autumn 2007 – not a hope I’d say on one of the slowest building sites I have ever come across.

    #781820
    Pug
    Participant

    might be the definition of irony but the Corbett Bros have applied to change the use of their long vacant office development on Copley St to educational use on 3 floors to become UCC’s new School of Architecture

    #781821
    Radioactiveman
    Participant

    From today’s Evening Echo: (regarding Howard Holdings/Tedcastles site adjacent to Pair Ui Chaoimh)

    The site is marked in green. The site marked in purple is owned by a spin-off of IAWS. Expect an announcement on both sites before the end of the summer. Should be two good ‘bookends’ to the South docks as a whole.

    #781822
    Pug
    Participant

    at last!! – venue and conference centre much needed – i’m curious to see what it will be like now – i am assuming of course that if there is seats for 4200, there is stnading room for another 4,000. I dont know of many concerts such as those that were held in the Marquee that people would sit down for – cant see people politely clapping along to Slayer in their seats

    I still am not sure why a concert venue cant be worked in with a complete revamp of Pairc Ui Chaoimh – i’d rather sink the 8.25 million into that

    #781823
    Spinal Tap
    Participant

    @Pug wrote:

    at last!! – venue and conference centre much needed – i’m curious to see what it will be like now – i am assuming of course that if there is seats for 4200, there is stnading room for another 4,000. I dont know of many concerts such as those that were held in the Marquee that people would sit down for – cant see people politely clapping along to Slayer in their seats

    I still am not sure why a concert venue cant be worked in with a complete revamp of Pairc Ui Chaoimh – i’d rather sink the 8.25 million into that

    In todays Irish Examiner it is stated that the adaptable venue will cater for :-

    6,000 plus live venue which includes 1,150 seated.

    Seated concert venue fro 4,200.

    Conference venue for 2,000.

    + suitable for smaller events,banqueting hall for 1,000 and parking for 1,000 spaces.

    Of course the City Council will meet 25% of its cost.

    #781824
    THE_Chris
    Participant

    6,000 live venue with 1,000 carparking spaces???

    Hmmm. If they have shuttle buses from the P&Rs then it might be ok, but that would require too much effort I reckon.

    #781825
    who_me
    Participant

    Well, it’s not too far to walk from the city centre, close to both the bus and train stations, and wouldn’t be too far from any likely light-rail/tram link through the docklands to Mahon. It might be a bit wasteful to provide much more parking capacity.

    #781826
    murfee
    Participant

    Great location! most people chose to walk to the Marquee from town so no reason to expect them to do anything diffrently in the future

    #781827
    malec
    Participant

    Massive demolition opposite the crawford, walked past today. The size of the demolished area is seriously impressive considering it’s in the city centre, looks like the aftermath of a bomb explosion at the moment

    #781828
    Spinal Tap
    Participant

    @malec wrote:

    Massive demolition opposite the crawford, walked past today. The size of the demolished area is seriously impressive considering it’s in the city centre, looks like the aftermath of a bomb explosion at the moment

    Its a massive city centre site which was underused when you think about it.It should be a mess of concrete lorries and construction traffic for the next 18+ months though.

    #781829
    Ebeck
    Participant

    @Spinal Tap wrote:

    Its a massive city centre site which was underused when you think about it.It should be a mess of concrete lorries and construction traffic for the next 18+ months though.

    There are two separae sites there at the moment. The OCP site and Dunnes Stores site. There is another large site over on Parnell Place being developed by Brian McCarthy.

    #781830
    Radioactiveman
    Participant

    Does anybody know what’s going on at the junction of Castle Street, North Main Street, South Main Street and Liberty Street? i.e. the CYMA building. There’s some very oddly positioned hoarding there at the moment.

    #781831
    who_me
    Participant

    Did a fair old walk around the city, wish I’d brough my camera with me to take a few snapshots of what’s going up around the city centre.

    – Jury’s Hotel is progressing nicely. The hotel itself, the apartment building (I presume) to the East, and the wedge shaped building in between (apartments again) are all up, with another building (at first I thought it was an escalator!) going up behind the apartment building. The Weir Bar on the river (obviously) is a nice spot for a lazy Sunday afternoon.

    – The scaffolding has come down on half of the Jacob’s Mill building. Pity.

    – The breast check clinic on Anglesea St. flew up without me noticing; does anyone have any images of what it’ll be like? Looks fairly ordinary so far. That area is certainly being built up between this, the Copley St. developments, the civic offices, and of course the Elysian isn’t too far away.

    – There’s a new development in progress on McCurtain St., just across from St. Patrick’s church. It seems they’re retaining the facade – does anyone know anything about the plans?

    – Another one that snuck up on me – the development on Western Rd. on the site of the old greyhound track. I presume it’s part of UCC, does anyone know? Again, speaking of areas that became built-up all of a sudden.

    – Aoife Landers pub is being reopened as Market Lane restaurant. No major external changes, but worth noting as another notch in the rejuvenation of that end of Oliver Plunkett St.

    – The former paint shop on the corner of Parnell Place and Lower Oliver Plunkett St. seems to be undergoing major renovation too. Hopefully they’ll retain the windows on that one, I always thought it would make a very nice cafe/restaurant/pub.

    #781832
    Radioactiveman
    Participant

    The rear (?) of the new UCC IT building at the greyhound track. I believe they have permission to bring it up to a total of five storeys so this image is out of date.

    #781833
    Leesider
    Participant

    the one on the Western Rd is the new computer science building for UCC, going to include a boardwalk along the river.

    #781834
    jungle
    Participant

    I know it’s not finished yet, but ordinary is the most positive description I can come up with for the breastcheck building.

    As regards the area, there’s still plenty of development to come here. The mechanics yard is surely too big a site for it to continue to be used as such given the location. There are also a number of city council yards off Old Station Road where the land value cannot justify the use (but when has that been a consideration with state institutions…). Finally, I seem to rememeber a plan, mentioned on here a long time ago, to build on what is currently the card park of Anglesey St Garda Station. Not sure what became of that, but again surface parking in such a central location is not really justifiable.

    As the buildings are put in place, upgrades to the pedestrian environment for the are will become vital (it’s already one of the worst in the city). I assume we’ll see it 10 years after the buildings are in place though…

    #781835
    who_me
    Participant

    Cheers Radioactiveman (why does that sound like a line from a super-hero comic?)

    It looks alright there, though I wouldn’t be too keen on the peach(?)* colour. I hope there’s a bit of artistic license there though – given the Lee’s tendency to flood I hope the banks are higher than that! 🙂

    Looks ok at 3 floors, hope it looks ok if 5.

    (* I’m a guy. I don’t do colours).;)

    #781836
    PTB
    Participant
    who_me wrote:
    It looks alright there, though I wouldn’t be too keen on the peach(?)* colour.

    (* I’m a guy. I don’t do colours).]

    Wife: How about this one?
    Husband: I wouldn’t be too keen on the peach
    Wife: We’re going with the peach.
    Husband: Um..
    Wife: We’re going with the peach

    #781837
    lawyer
    Participant
    who_me wrote:
    Did a fair old walk around the city, wish I’d brough my camera with me to take a few snapshots of what’s going up around the city centre.

    – Jury’s Hotel is progressing nicely. The hotel itself, the apartment building (I presume) to the East, and the wedge shaped building in between (apartments again) are all up, with another building (at first I thought it was an escalator!) going up behind the apartment building. The Weir Bar on the river (obviously) is a nice spot for a lazy Sunday afternoon.

    – The scaffolding has come down on half of the Jacob’s Mill building. Pity.

    – The breast check clinic on Anglesea St. flew up without me noticing]

    The development at St. Patrick’s House is for Finbarr Gannon.
    The addition of 2 extra floors and a total of 13 apartments [what else?]

Viewing 20 posts - 1,101 through 1,120 (of 2,109 total)
  • You must be logged in to reply to this topic.