Developments in Cork
- This topic has 2,108 replies, 192 voices, and was last updated 13 years, 5 months ago by
Anonymous.
- AuthorPosts
- June 4, 2007 at 3:19 pm #781718
-Donnacha-
ParticipantI noticed someone has ripped up some of the new paving on Carey’s Lane or French Church street (can never remember which one’s which). Seems the paving’s been replaced by red cement!
Can’t the city council go after people for this ? It’s vandalism in my books.
Seems it’s a gas connection into one of the buildings along the street.
Surely red-brick paving isn’t THAT hard to replace!June 4, 2007 at 11:58 pm #781719Tuborg
Participant@MrX wrote:
I noticed someone has ripped up some of the new paving on Carey’s Lane or French Church street (can never remember which one’s which). Seems the paving’s been replaced by red cement!
Can’t the city council go after people for this ? It’s vandalism in my books.
Seems it’s a gas connection into one of the buildings along the street.
Surely red-brick paving isn’t THAT hard to replace!Its a bit of an Irish disease really, “yera throw an aul lump of cement into it, twill be grand!” is usually the attitude. Could’ve been worse, tarmac is normally the favoured filling!:mad:
June 5, 2007 at 7:03 am #781720kite
Participant@MrX wrote:
I noticed someone has ripped up some of the new paving on Carey’s Lane or French Church street (can never remember which one’s which). Seems the paving’s been replaced by red cement!
Can’t the city council go after people for this ? It’s vandalism in my books.
Seems it’s a gas connection into one of the buildings along the street.
Surely red-brick paving isn’t THAT hard to replace!That type of shoddy work is a disgrace.
The trouble is that nobody in City Hall gives a damm. The City Manager himself allowed the destruction of the historic paving outside City Hall; this was replaced by cheap Chinese “granite substituteâ€
Local Councillors turn a blind eye to such vandalism as there are only a handful of votes to be got in the city centre.June 5, 2007 at 7:40 am #781721Spinal Tap
Participantkite wrote:That type of shoddy work is a disgrace.
The trouble is that nobody in City Hall gives a damm. The City Manager himself allowed the destruction of the historic paving outside City Hall]You would think that all of the paving used on Patricks St. before the Beth Gali job would have been stored away for repairs etc for other areas of the city ?
June 5, 2007 at 9:36 am #781722-Donnacha-
ParticipantThere are a few issues in Ireland:
1) Pavements should need to be opened so often. Services go in in a totally unplanned way with no provision made for access.
2) If a contractor opens a pavement and doesn’t restore it to its original state, he should be sued for damages. It’s a waste of tax payers money. We end up footing the bill for expensive repaiving jobs paying for damage inflicted upon our roads and pavements by profitable telecommunications companies, ESB, Bord Gais etc..
June 5, 2007 at 11:44 am #781723Torquemada
ParticipantHi All,
Just for those of you travelling on the N25 today, we are back to the one lane each way between Carrigtwohill and Midleton.On this, I thought that an overpasss was to be constructed?I hear now they are constructing a signalised T junction, great news isn’t it on a dual carriageway?! Especially one as busy as this is..:oJune 6, 2007 at 11:08 am #781724Anonymous
InactiveThere is a supplement with today’s Irish Times entitled ‘Cork First’. Within it there are articles about The Docklands, and other general changes to the city.
I couldn’t find an on line version, but maybe it is there somewhere.
http://www.ireland.com/newspaper/frontpage/2007/0606/index.html
June 6, 2007 at 9:25 pm #781725THE_Chris
Participant@Torquemada wrote:
Hi All,
Just for those of you travelling on the N25 today, we are back to the one lane each way between Carrigtwohill and Midleton.On this, I thought that an overpasss was to be constructed?I hear now they are constructing a signalised T junction, great news isn’t it on a dual carriageway?! Especially one as busy as this is..:oHmmmm. I remember this was all supposed to be upgraded to overpasses, but now that Amgen have put the date back I dunno. Traffic lights there would be daft beyond belief. Just put the overpasses in plz.
June 6, 2007 at 9:41 pm #781726samuel j
Participant@THE_Chris wrote:
Hmmmm. I remember this was all supposed to be upgraded to overpasses, but now that Amgen have put the date back I dunno. Traffic lights there would be daft beyond belief. Just put the overpasses in plz.
word on street is that Amgen gone gone…… might explain the traffic light option…
Maybe I’m wrong but word from many in the industry despite pre election propaganda.. amgen alot more than a put back date…. if anyone has better news would love to hear it..
June 7, 2007 at 8:03 am #781727Spinal Tap
ParticipantJoe O’Donovans scheme for the Capitol Cinema and Patricks St. Sites is in for planning today as there is a feature on the proposed scheme in todays Examiner.The usual suspects lined up H&M,Zara,Habitat etc.
Its a lot better than his previous scheme for the same site IMO.June 7, 2007 at 8:52 am #781728Radioactiveman
Participant@Spinal Tap wrote:
Joe O’Donovans scheme for the Capitol Cinema and Patricks St. Sites is in for planning today as there is a feature on the proposed scheme in todays Examiner.The usual suspects lined up H&M,Zara,Habitat etc.
Its a lot better than his previous scheme for the same site IMO.Some details:
Five storey over 2 basement fronting onto Grand Parade. Demolition of Central Shoe Store block, Capitol Cinema Block, Post Office and Kebab Restaurant.
On patrick Street, demolition of all but facades. Demolition of the Vineyard public house, but retention of the market tavern (a listed building).Developers seem reluctant to offer details, images of the St. Patrick St. finish, which worried me a little. But Grand Parade looks much superior to the previous effort on the site. I have no doubt it will be a hard to swallow complete demolition of the buildings on either side of the capitol for some people, but the design seems to merit it. By the look of things, 1 floor will be lopped off the top of the Grand Parade side (the top two of five are set back).
June 10, 2007 at 7:13 am #781729KenzoTange
Participant@who_me wrote:
That is a very good point. Considering there are sites waiting for redevelopment in the docklands within 5-10 minutes walking distance from the city centre, it doesn’t seem to make a lot of sense to be throwing buildings like that into very developed, surburban areas an hour walk out of the city (probably an hour drive too some days!)
why would any developer take on the ‘risk’ of docklands in these uncertain times when there are so many ‘safe’ opportunites for infill in the leafy suburbs?
June 10, 2007 at 4:00 pm #781730THE_Chris
Participant@samuel j wrote:
word on street is that Amgen gone gone…… might explain the traffic light option…
Maybe I’m wrong but word from many in the industry despite pre election propaganda.. amgen alot more than a put back date…. if anyone has better news would love to hear it..
I passed there yesterday and they had put up part of a central median and some streetlights in the middle. No where near the layout you’d expect for a flyover 🙁
June 10, 2007 at 8:56 pm #781731samuel j
ParticipantAmgen – heard from more sources at weekend, they gone alright and plan now is to develop to site and infrastructure to try to draw others there…albeit on smaller scale… might explain the latest traffic light plan…
mad have they not learned anything from other countries or indeed dublins Naas road..traffic lights on such a road a receipe for motors accidents…June 11, 2007 at 12:18 pm #781732who_me
Participant@KenzoTange wrote:
why would any developer take on the ‘risk’ of docklands in these uncertain times when there are so many ‘safe’ opportunites for infill in the leafy suburbs?
I agree it’s risky for a developer to take a chance on the docklands, but that’s their problem. I don’t think we should adopt a liberal planning policy simply because developers are getting cold feet about suitable but green (i.e. non-established, not mature) sites.
June 11, 2007 at 12:27 pm #781733Pug
Participanttheres always an element of risk but i dont agree that its as much as you think – this is prime prime property with tax breaks and the key is just once it happens to get everyone agreed to what they want there and getting things built in a reasonable timeframe – apartments down there so near city centre? I’d buy one if I had any money. If the mix of the area is done right and not made sterile, it could be great. Just a shame reports and preparing of plans took so long.
I heard conflicting reports about Amgen, that they didnt realise the whole area around there is apparently caves and holes and if they come in at all, it will be on a much smaller scale.
June 11, 2007 at 12:35 pm #781734-Donnacha-
ParticipantAlso it’s very unlike the docklands in Dublin, Cork’s docks are very much part of the city centre where as Dublins have historically been a bit of a ‘no go area’ and will require a lot of work to ultimately connect them to the mainstream of the city centre.
The quays (and the docks are just an extension of those) in Cork are very much part of the city itself.
It’s no where near as ‘risky’ as docklands projects in Dublin (or possibly in Belfast and Limerick).
Cork’s docks also have a very spectacular setting which will be highly desirable. Dublins are a lot more post-industrial and need to overcome a major image/marketing problem before they really take off.
It’s a totally different scenario to the IFSC / Grand Canal dock in many ways, even though some of the elements of the site are similar.
The Cork docks are also reachable from the city centre on foot, completely safely.
Where as Dublin’s docks seem to take you through a dodgy area of town before you emerge into the IFSC or Grand Canal area. It never feels connected to the city, but rather a new development near by.Also, the cork docklands area does not have the history of social problems, deprivation etc that seems to be a major issue around parts of the old docklands in Dublin
I don’t think it’ll be a risky developement, nor do I think there’ll be much difficulty convincing individuals or businesses that it’s a nice location.
It’s very much prime real estate waiting to happen.
As for developers:
The established suburbs in Cork are not really any less risky than the docklands area. The major attraction for the docks would be more scope for development in terms of planning / zoning, cheaper land, tax breaks and as the area develops as a location, it will be easier to market, particularly for commercial / office space.June 11, 2007 at 1:12 pm #781735who_me
ParticipantThe principal problem is the initial risk.
An apartment in the docklands might be very attractive, but would you want to buy (even a luxury) apartment on Centre Park Rd. as it currently stands? Driving through an industrial area to and from work. Heavy trucks rolling by day in, day out (I assume). No shops or any kind of residential facilities nearby. I’ve no idea what the air quality is like but I can’t imagine it’s the best.
If potential residents are thinking that, you can bet the developer who’s sitting on a site in the Docklands is going to keep sitting on it until they can maximise the return on their investment.
June 11, 2007 at 4:23 pm #781736Pug
Participant@who_me wrote:
The principal problem is the initial risk.
An apartment in the docklands might be very attractive, but would you want to buy (even a luxury) apartment on Centre Park Rd. as it currently stands? Driving through an industrial area to and from work. Heavy trucks rolling by day in, day out (I assume). No shops or any kind of residential facilities nearby. I’ve no idea what the air quality is like but I can’t imagine it’s the best.
If potential residents are thinking that, you can bet the developer who’s sitting on a site in the Docklands is going to keep sitting on it until they can maximise the return on their investment.
i agree with Mr X earlier, the closeness of the docklands to cork mitigates the risk hugely – the risk for the buyer, buy now, endure some trucks and construction going up and down, absolutely true, but if you wait until the place is pristine (and you will be waiting i would say) then the prices will have gone up a good bit I would say.
I dont think the developer will sit on it too long, if one goes the others will
June 11, 2007 at 6:35 pm #781737kite
Participant@who_me wrote:
The principal problem is the initial risk.
An apartment in the docklands might be very attractive, but would you want to buy (even a luxury) apartment on Centre Park Rd. as it currently stands? Driving through an industrial area to and from work. Heavy trucks rolling by day in, day out (I assume). No shops or any kind of residential facilities nearby. I’ve no idea what the air quality is like but I can’t imagine it’s the best.
If potential residents are thinking that, you can bet the developer who’s sitting on a site in the Docklands is going to keep sitting on it until they can maximise the return on their investment.
Given the current discussion on this thread is mentioning the Cork Docklands I decides to copy and paste this from the Cork Docklands thread;
That is the problem jungle, the draft report hints at hiding the contamination instead of dealing with the issue, a shortsighted answer that will as you mention, “come back to bite usâ€
The same problem albeit on a much smaller scale exists on the site of the former landfill site on the Carrigrohane Road. However if litigation were to raise its ugly head there it would not be much of a problem to move a few pitches and our traveler cousins to a safer site.
No easy solution if we turn a blind eye to the dangers in the Billion Euro Docklands redevelopment.Anyway I think it may be a little academic to speak of Docklands redevelopment at this point as after 7 years of junkets, millions spent on report after report, Port of Cork holding the city to ransom, the latest Brady Shipman Martin draft / report states that;
“Some existing land-uses, e.g. the oil storage facilities and the electricity generating station, may be expected to remain in the area for a considerable time to come and this may place a constraint on the scale, form, location and type of future developmentâ€
This statement along with the fact that designation as a Seveso site, means that some restrictions apply to proposed land uses in the surrounding area, as identified by the HSA. While each site will incur differing restrictions, generally, the closer a proposed development is located to a Seveso site, the more land use occupation and density restrictions will apply. New developments will be referred to the HSA within the following distances from a Seveso site:
• Topaz Energy Ltd Site 400m referral boundary
• NORA Slte:300m referral boundary
• Gouldings Fertiliser Site:700m referral boundary and HSA land use zones
High-density residential development is normally not permitted in areas immediately adjoining Seveso sites.As these sites themselves are considerable in size, particularly the Gouldings and ESB sites any development is likely to be piecemeal.
The only way around this problem again entails a long drawn out process of dealing with redevelopment on a “mini site†by “mini site†basis, where very limited amounts of contaminated soil can be removed from site without licence - AuthorPosts
- You must be logged in to reply to this topic.

