Participant@bosco wrote:
PTB – echoing my thoughts (pardon the pun!)
As for trams, guided busses, light rail etc… I’ve had a particular gripe I’ve wanted to get off my chest for ages. A few years ago when the first docklands plan became available for download on the city council’s website, I was delighted to see included in it an ambitious but realisable vision for either a light rail or guided bus line. The route shown was running from Mahon, along the old rail line, through the docklands, the city centre, down Western Road, via Victoria cross to Bishopstown and CIT. There were route maps and even a few pictures of trams and a guided bus for good measure.
Now, it seems to me the only major problem in constructing these tram lines or guided bus tracks would be the lack of space available in the city centre and at certain junctions. One of the major junctions along the route is at Victoria Cross, where one would expect a stop to be provided given the number of student apartments in the area. The existing 4 lane road is barely wide enough, in fact it is too narrow to comfortably fit 4 adjacent lanes of traffic when there is a bus or large truck involved. The footpaths are inadequate for the volume of pedestrians (mostly students). Add into the mix a few cars and vans parked on the footpath or side of the road, thanks to that new Centra (awful planning decision in the first place).
Now, where do they propose to squeeze in the light rail lines? Or a guided bus track? Or even a miserly painted bus lane separated from traffic? Meanwhile, a strip of land running alongside this road from the Clinic on Western Road to the Wylam Chinese has come up for redevelopment in some form or another in the past 3 years. While UCC’s IT building is still under construction on the Western Rd, the rest of the land has been blanketed in student apartment developments, all built right out to the edge of the site boundary, leaving no room for widening footpaths or allowing for future needs.
If you live on a boreen in the middle of the country and you wish to alter the entrance to your house or the boundary in any way, there are rules that oblige you to bring the new boundary back a certain distance from the road. Why on earth does the same not apply in the city? Especially at one of the busiest junctions where traffic can be disastrous at rush hour. Where they supposedly plan to provide a public transport corridor in the future? Where the footpaths are completely inadequate for the volumes of pedestrians using them every day?
I just can’t believe there was no way to force the developers to allow even a 5 meter gap between any development and the existing boundary, so that the land could be utilised in the future to widen the road or provide a separated rail/bus track.
Anybody have a clue what I’m talking about? 🙂
Don’t start me bosco,
City Development Plan 4.10 states that;
“A network of Green Routes will be developed for Cork City and environs. Green Routes are high quality public transport and cycling corridors providing high quality bus services in DEDICATED ROAD SPACE WHERE FEASIBLEâ€
Most Green Routes in Cork are nothing more than imaginary lines in city planners heads.:eek:😉 Victoria Cross student apartments!, the Spanish Government are demolishing apartments in many areas where dubious planning was granted, maybe our Government could make a similar decision on these “thingsâ€?
February 22, 2007 at 12:33 am #779674bosco
ParticipantAh kite, sure haven’t we x number of kilometres of green routes that our representatives can rattle off at any public occasion where facts on public transport are required? Shame these include utter follies such as the lovely cycle lane painted onto the hard shoulder on the airport road and in other places. Probably cost a 5 figure sum and took a few weeks labour, but now the hundreds of air travellers biking their way up the airport hill will know to stick to the left hand side and not cycle in the overtaking lane! Insanity.
February 22, 2007 at 12:37 am #779675bosco
ParticipantJust to illustrate…

And more madness: http://www.headrambles.com/2006/11/13/get-on-yer-bike-bertie/
February 22, 2007 at 12:27 pm #779676Pug
Participantbosco wrote:in the past 2 or three years Aer Lingus have doubled their capacity out of Cork and have started a load of new routes to new destinations — where they use airports acually located where you want to go ]So one airline like aerlingus is opening up more routes – so what – isnt that what they are supposed to do? and why not have more? dont recall many of my friends flying direct from cork to ski resorts this winter. And why are other airlines dropping off? the highest profile new route recently was announced today. To Cornwall. Knock gets America.
Despite the rant I see your point. I think the new terminal is average, could have been a whole lot better.
As for the trams, I completely and utterly agree with all your points. It looked like a long bus to me. Why not have double deckers then? Cork needs a transport authority, But you have M Cullen in charge of transport and on the same day as saying he will pay 600m for the westlink toll bridge he says its reasonable to stick 100m on the bill for the airport. For fear of the moderator I cant express what I think of him. He is quoted in the Examiner as saying Cork getting stuck with €100m debt is “the sale of the century”. And then turned around and gave his home aiport in waterford €22m to develop it.
I visit Berlin a lot and Cork is 3rd world transport. Lack of buses, no nightlinks, lack of frequency, no dedicated lanes (REAL ones anyway, the Grange Green route is always rolled out until you point out that the bus gets full in Frankfield and then zips down the green route on the hill only to drive into the highly congested Douglas traffic).
Manor Park homes application for 200 apartments is due for a decision this friday so I vote it should be ruled premature pending redevelopment of Kent station and integration of the bus office.
February 22, 2007 at 3:31 pm #779677browser
Participant@Pug wrote:
prediction: CAA to get dumped with the debt (i.e. FF to break its promise) , Ryanair to let them all run around in circles, then come in with cut price offer for old terminal, in one swoop CAA can reduce their 100m debt and ryanair open up europe
Just to say I’m not sure having Ryanair flying out of your airport is necessarily good for it or the customers (long term anyway). Depends on what terms you have Ryanair there on. For example I don’t know but suspect the Shannon deal isn’t working out well for that airport. Ryanair’s deal with them is outrageous – a €1 landing charge or something. It doesn’t surprise me then to hear Shannon made an operating loss last month and would have made a yearly loss in 2006 except for our state sponsorship of US terrorism in the middle east. In fairness to the CAA i think they’ve actually rejected Ryanair to date as Ryanair have offered them a similarly lousy deal. That said, I am envious of all the shannon routes….but I do wonder if they’ll disappear when the current deal is up.
I’d actually be interested to know if anyone can shed light on whether Shannon is happy with how the deal is panning out……..
February 22, 2007 at 3:53 pm #779678Anonymous
InactiveAll airports survive on a matrix of charges most of them landside so even if a particular amount of airside income is foregone revenues will be increased.
For example if a couple fly from SNN to STN on a two day break they will probably deposit their car for two days in the carpark then buy a coffee thus underpinning the rental income from the rented units at the airport.
The real problem for SNN are the staffing levels which have no doubt swollen on political considerations over the past decades. SNN possess one major asset which is its runway and good road transport links; its future is freight and whatever other business they can bring in.
Its current deficet is doing serious damage to the prospects of the other former Aer Rianta airports and it must stand on its own two feet.
With Cork I think that its future is similar to Dublin’s as it serves two distinct markets i.e. business / leisure and budget therefore the medium end should be serviced out of the new terminal and if sufficient landside capacity exists and only if the capacity exists then Ryanair and any other budget airline that looks viable should be encouraged by way of incentives to increase passenger numbers so that landside income increases.
February 22, 2007 at 4:51 pm #779679Pug
Participantbrowser wrote:Depends on what terms you have Ryanair there on. For example I don’t know but suspect the Shannon deal isn’t working out well for that airport. Ryanair’s deal with them is outrageous – a €]Begs the question then why Shannon agreed to the deal and what did they do to encourage other airlines? I think the high staffing is an issue certianly.
My point isnt that Ryanair is the be all and end all, give the old terminal to another airline, I dont care, but if Knock can go transatlantic, what are Cork doing to encourage and bring in more routes. Its been close a few times to go to the US.
February 22, 2007 at 10:35 pm #779680Micko
ParticipantWith the N4 and N7 junctions with the M50 getting free flow junctions isn’t it about time that the Dunkettle Interchage also gets upgraded to having free flowing junctions. It took me 25 minutes to get from the Rochestown round about to the lee tunnel this evening. Putting traffic lights on the roundabout has brought a lot of improvement but surely this should be the way forward. I can imagine this will only get worse and worse, even more so when the Sarsfield Road and Bandon Road roundabout flyovers are completed.
Is there enough space for a free flowing junction at north side of the lee tunnel and would it still be possible to keep the slip roads for Glounthaune.
February 22, 2007 at 11:32 pm #779681THE_Chris
ParticipantYes. I put together on paper a reasonably easy but probobly expensive pic of what a grade separated Dunkettle could look like.
Dunkettle was done like this because apparently it only cost about €2m to put lights in and add a lane here and there. Grade separating this fully would cost €60,70,80m easily (Kinsale Road was €40m I think off the top of my head). So its not a priority right now and nor should it be, when you think of the awful roads between cities at the moment, 🙂
Sarsfield/Bandon are badly badly needed I agree, but with the priority being the interurbans, dont expect construction to begin before 2010. Advance funding for site investigation and the plans for the junction have been given, but no construction till the interurbans are done, as far as I’ve heard.
February 23, 2007 at 1:52 am #779682Micko
ParticipantSo there are plans on the long finger for a full free flowing junction at the site ? Better than nothing I guess.
February 23, 2007 at 11:19 am #779683Praxiteles
ParticipantFrom this morning’s quondam Cork Examiner:
23 February 2007
Airport the victim of policy u-turn
THE news that Cork Airport Authority (CAA) is to be saddled with a €100 million debt in exchange for freedom from control by the Dublin Airport Authority (Irish Examiner, February 20) flies in the face of the Government’s own plans for regional development.
In his statement establishing the three independent airport authorities — Shannon, Dublin and Cork — former Transport Minister Seamus Brennan clearly stated that the debt-free start would lead to the independent airports being able to “compete with each other and vigorously pursue new business free from central controlâ€.
Are we to take it now that the Government does not want this?
Does it not want three competing airports, but one main airport and two smaller versions too crippled with debt to compete on equal terms?
If it is the case that the debt is to be divided in this way, then shouldn’t CAA request its share of revenue from the sale of the Great Southern hotels and other former Aer Rianta assets?
Shouldn’t the assets, as well as the debt, be shared by the new authorities?
Senator John Minihan has been very vocal in his opposition to imposing this debt on Cork, but it has to be remembered there are two senior PD ministers in the cabinet that took this decision.
No doubt the PDs and Fianna Fáil candidates in Cork will feel the backlash come the summer election.
Eoin Lettice
3 Nicholas Court
Travers Street
Cork.
February 23, 2007 at 11:21 am #779684Praxiteles
ParticipantAnd ditto:
23 February 2007
Leave the car at home, but where’s the bus?
RECENTLY I decided to use the bus to get home from work. According to the Bus Éireann timetable, a number-two bus was to leave at 7pm.
I was at the stop in advance of the departure time in case it came early.
But the bus never came and neither did the next due at 7.15. At 7.30, I was so frustrated I gave up and walked home.
It is difficult to see more people being persuaded to leave their cars at home when the alternative is to be left standing on a cold street.
Niall Twamley
24 Hillcrest Rise
Blarney Road
Cork.
February 23, 2007 at 11:22 am #779685Praxiteles
ParticipantAnd ditto:
23 February 2007
Look to Dublin for source of debt crisis
YOUR editorial on the Government’s somersault on Cork Airport funding was very much to the point, but did not go far enough (Irish Examiner, February 21).
It should be noted that the budgeted cost of the airport project was €120 million and that the (mis)management of the project was down to the then Aer Rianta and, now, the Dublin Airport Authority (DAA) — leading to a cost over-run of €100m that the Government now wishes to recover from the Cork travelling public.
Apart from the unequivocal undertakings by Seamus Brennan, supported subsequently in writing by the Taoiseach, responsibility for the total debt of €220m should rest squarely with the responsible agency — the DAA.
The suggestion that the land bank near the airport should be ‘thrown in’ to help fund the €100m being foisted on Cork airport management is cynical in the extreme. This land is an integral part of the airport and should not be used as a political football. Is it any wonder that many people are cynical about our political process and do not vote?
Maybe that is why the Government has the gall to spring this one on us in the run-up to a general election. Perhaps it’s time we give our response in the polling stations.
Patrick Ronayne
‘Drake’s View’
Crosshaven
Co Cork.
February 23, 2007 at 11:58 am #779686Pug
Participantthe other major transport article this morning (aside from M Cullen granting €22m to waterford to develop its airport) was M Cullens announcement that CIE had announced the redevelopment of Galway railway station, and the city quarter around it with a €1bn plan.
The redevelopment of Ceannt Station proposes developing the 5.7 hectare CI
February 23, 2007 at 12:15 pm #779687corcaighboy
ParticipantTo be honest, I don’t take any of these ministerial announcements at face value anymore. Firstly, it is an election year so it seems any government official can trot out any number (the higher the better) to show how great they are. Secondly, how they arrive at these headline numbers amazes me. It would probably confuse a professor of Mathematics.
In the case of the Galway announcement, I wonder how much has actually been allocated to the redevelopment of the train station? Only the monies the department of finance have ok’d would cut it with me. The rest of the finance is most likely the total potential value of the investment, which in all honesty is more related to a figure plucked out of the sky. Grand announcements and grand schemes (preferably with ‘quarter’ in them) are designed to get the public drunk with anticipation…until the election is out of the way. Jaysus, I have become a cynic!!
By the way, Ceannt Station could do with a clean-up…let’s just hope it is a real one and not some ministerial red herring.February 23, 2007 at 12:15 pm #779688browser
Participant@Pug wrote:
the other major transport article this morning (aside from M Cullen granting €22m to waterford to develop its airport) was M Cullens announcement that CIE had announced the redevelopment of Galway railway station, and the city quarter around it with a €1bn plan.
We get €4m for Cork for some canopies.
Ah but they are lovely and white. Martin picked them himself so they’ll be top notch!
February 23, 2007 at 12:25 pm #779689DubinCork
Participant@browser wrote:
Ah but they are lovely and white. Martin picked them himself so they’ll be top notch!
They are actually going a mossy shade of green.
What a farce in Cork.
Really.:mad:
February 23, 2007 at 5:04 pm #779690Pug
Participantwell, M Cullen and CIE are consistent in their ability to irritate the whole of ireland,
THE INDO
A €1bn plan to transform public transport in Galway city was at the centre of a row yesterday.No sooner had Transport Minister Martin Cullen and CIE Chairman, Dr John Lynch spoken in glowing terms about the plan at a function in Galway, than proceedings broke up in disarray. Local heritage group, Cairde na Gaillimhe and Labour Party President Michael D Higgins both slammed the project.
All of those at the top table refused to answer questions or enter into debate about the use of the hugely valuable city centre site at the heart of the transport plan. The 14-acre Ceannt station landbank is the last available development site in the city centre.
February 23, 2007 at 11:56 pm #779691THE_Chris
ParticipantTranslation: Its an election stunt and none of them had a CLUE what the plans actually entailed 😀
February 24, 2007 at 11:06 am #779692Praxiteles
ParticipantFrom this morning’s quondam Cork Examiner:
24 February 2007
Airport needs 500,000 fares to take-off
By Stephen Rogers and Sean O’Riordan
CORK airport will have to attract an additional 500,000 passengers to break even this year, after posting a €5.8 million loss in 2006.That is before it starts to budget for the cost of shouldering its €100m share in the cost of its new terminal building, estimated at between €8m-€10m per year.
According to figures obtained from Dublin Airport Authority, Cork Airport made substantial losses last year due to higher than expected operating costs, particularly staff overtime. The Dublin Airport Authority (DAA) board was told Cork needs a 14% increase on the three million passengers using the airport in 2006.
DAA chairman Gary McGann told the board meeting that operating costs in Cork were higher than expected, especially as overtime costs had risen.
Another factor was the loss of flights from Dublin due to competition with CIÉ’s hourly rail service and the improving road link between Dublin and Cork, he said.
“Finding the extra 500,000 or so passengers they need to break even is not going to be an easy task, especially with passenger charges about 25% higher than in Dublin,†he said, according to a report obtained by Business and Finance magazine.
By contrast, figures expected to be published in the coming weeks by the DAA will show Dublin airport had a good year, posting a €78m profit thanks to increased passenger figures.
Shannon Airport also had a profitable 2006 with a €4.9m profit, but that has been attributed to US troop traffic through the airport, which has now been moved to Leipzig.
Cork Fine Gael TD Bernard Allen said he had been told that Cork Airport was considering shutting the airport at night in order to reduce costs.
Mr Allen claimed that would turn the airport into a “glorified airfieldâ€.
However, a spokeswoman for the airport last night said it was no longer going to comment on its finances.
Meanwhile, the chairman of the Cork Airport Authority (CAA) has said he won’t be stepping down from his post, countering speculation that he was about to resign due to the ongoing controversy over the airport’s €100m debt.
Joe Gantly said that he intended to lead the board into the future and claimed that recent speculation about his position had been damaging to the airport, its staff and management.
The fallout from the Government’s decision to lumber the airport with such a debt, despite promises to the contrary by former Transport Minister Seamus Brennan, continued yesterday as unions said they were planning a major meeting to discuss the situation.
Representatives from Mandate, SIPTU, Impact and the Technical, Engineering and Electrical Union (TEEU) are to meet with workers on Monday.
SIPTU branch secretary John Pearson said that there was huge resistance among staff to news that the airport is beginning its new independent life with a financial millstone around its neck.