ParticipantAugust is the expected time for a decision.
Meanwhile, as mentioned, the Royal Dublin Hotel has been demolished (with the exception of its southernmost bay to help support No. 42) in anticipation of the construction of a new office block to rehouse Dublin Bus’s head office. This part of the project, which slipped neatly under the radar, looks set to go ahead as it was part of a site swap with Dublin Bus. I’ve yet to see plans for this building, though I think it already has approval (?).
There are doubts that the Bord will approve the Carlton remounting, while the new opening into O’Connell Street may morph into an actual street rather than the proposed ‘public space’.
July 12, 2009 at 6:23 pm #712069Anonymous
InactiveLets hope they can find a solution acceptable to all parties, I think we are all weary of the main street in the state appearing gap-toothed. That sign for Dr Quirky’s is absolutely objectionable they should be prosecuted.
Fingers crossed Dublin Central can receive a decision that the planners, developers and funders are agreed upon. Tourist revenue in retail is going to be key to that sector in the next decade as domestic consumption levels off; a shopping centre at this location is better placed than anywhere to capitalise on that demand. I just hope that the decision revisions are enough to satisfy conservation observers. Issuing a clear refusal to this scheme permission would not be good and would leave the city back at square 1 sometime back in the 1990’s
July 12, 2009 at 6:59 pm #712070OisinT
ParticipantI totally agree that Dublin Central must happen for the economy and OCS’s future. I think it should be something looking towards the future and very grand and cool… but I just do not agree with the ski-slope design I’ve seen around. Oh well, I guess it would be better than what is there now.
Also, as regards to the dublin bus swap, does this mean that we might finally get rid of Dublin bus current building and maybe (fingers crossed) the Fingal Co.Co. building!?
July 12, 2009 at 10:50 pm #712071GrahamH
ParticipantFingal will be gone in its entirety and Dublin Bus re-faced as it is a Protected Structure with a near-fully fledged townhouse surviving behind its deceptive curtain wall. Just a correction from earlier, the RDH has vanished in its entirety, with only the gable walls left standing for the benefit of No. 42 and the AIB.
Looking at the replacement building online, permission was granted exactly a year ago. It’s a standard, uncontroversial, anodyne affair, divided into two blocks to give the appearance of two buildings, one wider and taller than the other. Minimally dressed upper floors with expansive double-height retail at street level, the reinterpreted Georgian language works well with the compact No. 41 (left) but is repetitive, bland and wholly uninspired on such a large scale at No. 40 (right).

© Dublin Central ArchitectsNo. 40 was originally to be faced entirely in red brick, but this was changed by condition upon the intervention of the case planner. The use of brick on such a scale facing a visually independent major commercial building would be unprecedented on the thoroughfare. Brick dressed with stone in a contemporary manner could have been successful, but the lack of faith in modern architects to pull this off without descending into pastiche tends to draw one over to the planner’s favoured comfort zone of stone only.
Both buildings are now going to be faced in granite, detailed in a manner similar to the Ussher Library in Trinity, which is quite elegant. The window opes feature an opaque light box to one side which illuminates after dark.
July 12, 2009 at 11:53 pm #712072OisinT
ParticipantA bit over-simple, but as long as it’s elegant then I’m ok with it. Granite buildings are usually very nicely finished. Will dublin bus building be redone with it’s original townhouse front? What will be replacing Fingal Co.Co.? This is where Dublin Central was supposed to be moving the Carlton facade right? But with the (permanent?) delay on this are there any other options?
August 12, 2009 at 7:01 pm #712073Anonymous
Inactive@OisinT wrote:
I totally agree that Dublin Central must happen for the economy and OCS’s future. I think it should be something looking towards the future and very grand and cool… but I just do not agree with the ski-slope design I’ve seen around. Oh well, I guess it would be better than what is there now.
Agreed, it seems to have shifted a few times though:

and now

I preferred the former in shape but the latter is facing the right direction (towards the Liffey). I’d like to see a tilted circular design though, would be nicer for a park.
Either way, so long as it’s big enough, it’ll be spectacular and a draw.
Any news on progress? Any ETA? I happen to like O’Connell Street a lot now, but with these developments in place there’s no doubt that it’s going to be pretty damn excellent in a few years.
August 12, 2009 at 11:37 pm #712074GrahamH
ParticipantEverything that was required of this scheme has been achieved. The Bord delivers yet again.
PLANS FOR a 13-storey building topped by a “park in the sky” at the heart of the proposed Carlton Cinema development on O’Connell Street have been rejected by An Bord Pleanála.
OLIVIA KELLY
The board has directed developers Chartered Land to significantly scale back the overall plans for the development of the 5.5-acre site in the centre of Dublin city, and omit the 13-storey building, before it makes a final decision on permission.
The scheme pays “insufficient respect” to the classical form of O’Connell Street, involves too much demolition, and conflicts with several statutory plans for the area, the board has said.
Chartered Land, which is controlled by shopping centre developer Joe O’Reilly, was granted permission for the commercial and residential development, centred on the site of the former Carlton Cinema, by Dublin City Council last December.
This was subject to a large number of appeals to An Bord Pleanála, including several from groups seeking to protect the National Monument at number 16 Moore Street which was used by the leaders of the 1916 Rising. A public hearing on the development was held last April.
The board has this week written to Chartered Land seeking 16 significant modifications, which must be submitted before November 2nd. Chief among these is the omission of the “iconic building” – a 35-metre structure topped by a sloping public park, which was to be the focal point of the scheme. This element should be removed from the plans and the redesigned buildings should not exceed the height of the Arnott’s scheme – a neighbouring development for which the board has approved a seven-storey scale.
Despite having been granted permission from Dublin City Council, the board notes that the development is in conflict with several of the council’s statutory plans including the Architectural Conservation Area designation. The proposed scheme would disrupt the historic street pattern and was “over-scaled” in relation to the historic buildings around it.
The revised development should retain the original street pattern of the area, the extent of demolition should be reduced, and the existing buildings on Henry Street and Moore Street should be substantially retained.
The board also wants a redesign of the entrance to the development from O’Connell Street. The current proposals are for a 35-metre wide entrance partially fronted by a screen of thin, paired columns topped by a flat canopy, with the entrance buildings cut on a diagonal representing a funnel shape.
This entrance should be reduced to the width of Henry Street and set at right angles to O’Connell Street following “a traditional format” the board said. The entrance buildings should also use more traditional materials it said. Parking for the development should be reduced from 1,100 spaces to not more than 500.
While the letter imposes huge changes, it does state that the site is “general suitable for the type of development proposed”, suggesting that permission would be granted if the necessary modifications are made.
© The Irish Times
August 13, 2009 at 1:00 am #712075OisinT
ParticipantI don’t really know of anything they planned on demolishing that isn’t already total rubbish… at least not from what the plans described?!
August 13, 2009 at 7:05 am #712076ac1976
ParticipantDoes anyone have a link to ABP’s letter?
I assume they rejected the park in the sky because it looked silly and was inaccesable being in the sky, Parks are usually at ground level.
I think there were also objections that the restaurants were at the top levles of the development aswell and hopefully ABP have rejected on these grounds.It would be great to see this go ahead with some rivisions addressing these and the other issues brought up in the process.
August 13, 2009 at 7:45 am #712077rumpelstiltskin
Participant@ac1976 wrote:
Does anyone have a link to ABP’s letter?
I assume they rejected the park in the sky because it looked silly and was inaccesable being in the sky, Parks are usually at ground level.
I think there were also objections that the restaurants were at the top levles of the development aswell and hopefully ABP have rejected on these grounds.It would be great to see this go ahead with some rivisions addressing these and the other issues brought up in the process.
Oh well god forbid we should do anything different – a park in the sky, just imagine! In Calgary, Canada, there’s a park indoors on the fourth level of the skyscraper, and it’s marketed as a tourist attraction and is very popular. A city park combined with a magnificent view over the whole city – how is this not a good idea?
August 13, 2009 at 8:07 am #712078ac1976
Participanthttp://www.irishtimes.com/newspaper/ireland/2009/0813/1224252500702.html
“Despite having been granted permission from Dublin City Council, the board notes that the development is in conflict with several of the council’s statutory plans including the Architectural Conservation Area designation. The proposed scheme would disrupt the historic street pattern and was “over-scaled” in relation to the historic buildings around it.”It does bring up the question of how the council can grant permission despite it conflicting with the statutary area plans that it is also responsable for.
Perhaps these area plans need to be amended to allow for better innovation of design as long as it is beneficial to the identity and culture of the city!Anyway the Architectural Conservation Area designation of O’connell street hasn’t rescued it from crappy shops and shitty shop fronts. Only innovative design can do this now.
Even the delapadated grandeur the street had up until 2000 is gone and the original buildings now even look out of place there.August 13, 2009 at 8:44 am #712079gunter
Participant@GrahamH wrote:
Everything that was required of this scheme has been achieved. The Bord delivers yet again.
PLANS FOR a 13-storey building topped by a “park in the sky†at the heart of the proposed Carlton Cinema development on O’Connell Street have been rejected by An Bord Pleanála.
OLIVIA KELLY
The board has directed developers Chartered Land to significantly scale back the overall plans for the development of the 5.5-acre site in the centre of Dublin city, and omit the 13-storey building, before it makes a final decision on permission.
The scheme pays “insufficient respect†to the classical form of O’Connell Street, involves too much demolition, and conflicts with several statutory plans for the area, the board has said.
Chartered Land, which is controlled by shopping centre developer Joe O’Reilly, was granted permission for the commercial and residential development, centred on the site of the former Carlton Cinema, by Dublin City Council last December.
This was subject to a large number of appeals to An Bord Pleanála, including several from groups seeking to protect the National Monument at number 16 Moore Street which was used by the leaders of the 1916 Rising. A public hearing on the development was held last April.
The board has this week written to Chartered Land seeking 16 significant modifications, which must be submitted before November 2nd. Chief among these is the omission of the “iconic building†– a 35-metre structure topped by a sloping public park, which was to be the focal point of the scheme. This element should be removed from the plans and the redesigned buildings should not exceed the height of the Arnott’s scheme – a neighbouring development for which the board has approved a seven-storey scale.
Despite having been granted permission from Dublin City Council, the board notes that the development is in conflict with several of the council’s statutory plans including the Architectural Conservation Area designation. The proposed scheme would disrupt the historic street pattern and was “over-scaled†in relation to the historic buildings around it.
The revised development should retain the original street pattern of the area, the extent of demolition should be reduced, and the existing buildings on Henry Street and Moore Street should be substantially retained.
The board also wants a redesign of the entrance to the development from O’Connell Street. The current proposals are for a 35-metre wide entrance partially fronted by a screen of thin, paired columns topped by a flat canopy, with the entrance buildings cut on a diagonal representing a funnel shape.
This entrance should be reduced to the width of Henry Street and set at right angles to O’Connell Street following “a traditional format†the board said. The entrance buildings should also use more traditional materials it said. Parking for the development should be reduced from 1,100 spaces to not more than 500.
While the letter imposes huge changes, it does state that the site is “general suitable for the type of development proposedâ€, suggesting that permission would be granted if the necessary modifications are made.
© The Irish Times
I don’t think it was ever envisaged that ABP would take on this role of re-designing, or directing the re-design of, major urban schemes, such as here or the ‘Opera Centre’ in Limerick, but fair play to them for not just flipping a coin and cashing their pay-cheques.
August 13, 2009 at 8:50 am #712080Anonymous
InactiveI really don’t see how a “park in the sky” behind OCS would detract from anything on the street proper.
Seems like a great idea just thrown out the window, they could have really made that special.
August 13, 2009 at 9:34 am #712081JoePublic
Participant@Yixian wrote:
Seems like a great idea just thrown out the window, they could have really made that special.
Agreed. What would have been a free amenity to the tax payer. Could they not just have reduced it in height rather than instructing it be ommitted?
Planning process is a bit nuts. Applicant submits plans to Dublin City Council. Dublin City Council gives opinion, applicant redesigns plans, knowing full well that ABP will just demand another complete redesign later. What a waste of time and money. Could there not be some consultation between DCC and ABP at the beginning of the process, or just cut out the middle man.
August 13, 2009 at 10:48 am #712082GrahamH
ParticipantListen, this is symptomatic of planning the length and breadth of the state, where planning authorities contort and wriggle around their own polices and development plans to suit the majority of applications, especially major ones, that come up for assessment.
Aside from the myriad of other matters which may be deemed subjective with this case, on the simple matter of the Architectural Conservation Area alone, what was allowed through by DCC just defies reason. An ACA is a legally-binding statutory instrument, akin to Protected Structure or National Monument designations. Unlike policies of a development plan to which a planning authority need only have regard, an ACA is enforceable in the courts in terms of what is deemed to materially alter the character of the designated area. It is outrageous in this case that a whole chunk of a handsome terrace in the ACA be swept away (on Henry Street), that an historic, near grid-like street pattern be gouged out, and the readability of that area should be altered in order to cater for a short-term commercial gimmick of a monolith sloping structure with roof garden which displays absolutely no connection with that area. This is not to say that the area must be preserved in amber; it simply means that the existing context must be accounted for in the design, layout and architecture of the new quarter. The ‘feature’ garden building was simply rammed in as a token glitter ball with no relevance to its environs. The new entrance to O’Connell Street was similarly lacking in an appropriate interpretation of the urban street pattern. I fully agree with what has been ordered in respect of this junction, not just because a Henry Street-scaled opening it is a more sensitive solution in this historic environment, but moreover because it affords the opportunity to build something that we have been unable to do over the past two decades – namely a new street. To follow the established street pattern not only better integrates the new scheme, it also helps to avoid Ilac Round II, whereby a new city quarter is created which will end up isolated and detached in terms of character and fashionability in years to come. The proposed wide columnar screen was a complete affront to that concept, never mind its existing environment.
I’d like to see the Bord’s order too, if anyone has it…
August 13, 2009 at 11:38 am #712083alonso
Participantis it an actual order or just a letter to the applicant – in other words will it be made available on their site. It’s not there now and they only publish “decisions” not what is in essence an AI request
August 13, 2009 at 11:43 am #712084dc3
Participant@rumpelstiltskin wrote:
Oh well god forbid we should do anything different – a park in the sky, just imagine! In Calgary, Canada, there’s a park indoors on the fourth level of the skyscraper, and it’s marketed as a tourist attraction and is very popular.
There is indeed, and very nice it is but one key word is indoors.
Now while Calgary has very pronounced climatic variation compared to Dublin, an outdoor high rooftop venue is one that has yet to catch the imagination of Dubliners.The saga continues.
August 13, 2009 at 11:50 am #712085OisinT
Participant@ac1976 wrote:
Does anyone have a link to ABP’s letter?
I assume they rejected the park in the sky because it looked silly and was inaccesable being in the sky, Parks are usually at ground level.
I think there were also objections that the restaurants were at the top levles of the development aswell and hopefully ABP have rejected on these grounds.It would be great to see this go ahead with some rivisions addressing these and the other issues brought up in the process.
wait… what’s wrong with having a restaurant at the top again? I’d eat there.
August 13, 2009 at 11:56 am #712086ac1976
Participant@OisinT wrote:
wait… what’s wrong with having a restaurant at the top again? I’d eat there.
Well there’s nothing wrong with having a restaurant at the top, but it would be good to have some at ground level so they can interact with the street, as opposed to just having display windows at ground level and forcing you to go all the way through the shopping center to get to the restaurant.
They have dona a good job of this at Dundrum by the lake where there are numerous restaurants and terraces.
August 13, 2009 at 12:30 pm #712087ac1976
ParticipantOUCH!!!
Dublin City Council criticised over decisions
Thursday, 13 August 2009 12:40
An Taisce has said there should be resignations in Dublin City Council after An Bord Pleanála again criticised council permission for high-rise development.The board have indicated to Chartered Land that it will reject its plan for the Cartlon site on O’Connell Street involving a 13-storey building topped by a sloping park.
In a Section 132 notice sent to the developers, they note that the plan was given permission by Dublin City Council even though it is in conflict with the council’s own Architectural Conservation Area designation.
Ian Lumley of An Taisce said this follows the board’s overturning of Sean Dunne’s Ballsbridge development scheme, which was given permission by the council even though it too was in conflict with its own development plan.
Welcoming the board’s observations in respect of the Carlton site, Mr Lumley said it was ‘a total slap in the face for Dublin City Council, it should be resigning time for senior management and planning’.
A spokesman for Dublin City Council said they will not be commenting in any way.
A spokesman for Chartered Land said the company will be considering the board’s request for a redesign.
It is understood it will be at least two months before revised plans will be ready for a decision by An Bord Pleanála.