Anonymous
InactiveThankfully the National Conservation and Heritage Group have taken this to ABP. :clap:
November 29, 2011 at 10:55 am #805297Anonymous
Inactive[attachment=0:1cx6i1mf]1. Beamish factory by crosses green.jpg[/attachment:1cx6i1mf]
The Beamish site contains evidence of brewing traditions going back at least two hundred years. If we flatten the entire place, this will be lost forever. We need smaller-scale, appropriate redevelopment schemes that accentuate the historical and architectural attributes of a place.
I’m very worried about Cork’s indifference to its own architectural heritage. So many endangered sites and so much indifference. It’s very strange.
January 5, 2012 at 12:33 pm #805299Anonymous
Inactive€150m project gets go-ahead at Beamish site
By Stephen Rogers
Thursday, January 05, 2012
AN BORD Pleanála has given the green light for a €150 million development, including a 6,000-seat event centre, on the site of Ireland’s oldest brewery in Cork city.
The planning appeals board backed Cork City Council’s decision to grant permission for the Heineken Ireland/BAM Property joint project at the Beamish and Crawford site. It has imposed 24 conditions.
The National Conservation and Heritage Group, which opposed the development, has said it will appeal the decision to the European Parliament.
As well as the 11,339sq m event centre, the developers applied to build an eight-screen cinema, two pedestrian bridges, a viewing tower, 46 student apartments with 206 bed spaces, a visitor centre, 10 artists’ studios and various restaurants, shops, bars and galleries.
The whole development was to be spread over seven buildings ranging in height from four to seven storeys.
A decision on whether to grant planning permission had not been expected before February 8 but details of the approval have been published on the board’s website.
The conditions it places upon the developers include the removal of floors from several of the proposed buildings to “preserve views and in the interest of protecting the amenity of adjoining property”.
It also orders the developers to facilitate Cork City Council in “archaeological appraisal of the site, and in preserving, recording or otherwise protecting archaeological materials or features which may exist within it”.
It said this was to conserve the site’s archaeological heritage and to secure the preservation of any remains which may exist there.
It also ordered that the medieval laneways around the site should be commemorated by the insertion of name plaques, which should be submitted for the approval of Cork City Council.
Most of the rest of the conditions were standard requirements in most planning applications.
Damien Cassidy of the National Conservation and Heritage Group said his organisation “half expected” the decision because of the pressure at present to create jobs.
“However, this could have been built in four or five other places,” he said.
“Owen O’Callaghan has an application in for the same thing in a different location,” he said.
Mr O’Callaghan wants to build a €50m development in Albert Quay which would include an event and conference centre with capacity for 5,000 people seated, or 7,500 people standing.
Mr Cassidy welcomed the news that part of the Counting House at the Beamish and Crawford site would be saved, with the developers ordered to submit plans for a museum.
However, he said his organisation would appeal the decision to the European Parliament on the basis that it is a heritage site.
Read more: http://www.examiner.ie/ireland/150m-project-gets-go-ahead-at-beamish-site-179094.html#ixzz1iaQhbK8R
January 8, 2012 at 8:11 pm #805298Anonymous
InactiveHad time to read the ABP report on their website.
All I can say is…money talks ! :thumbdown:January 25, 2012 at 3:50 pm #805300Anonymous
InactiveI think some of the renders actually look reasonably good….apart from the blank stark wall facing the river!! However, a conference centre here would ultimately kill off the proposed coinference venue in the docklands….which has the potential to be a much better site!
January 25, 2012 at 8:55 pm #805301Anonymous
InactiveThe planning application for the concert venue in the docklands was withdrawn on the day ABP granted permission for the Dutch duo of Heineken & BAM.
December 5, 2012 at 12:36 pm #805302Anonymous
Inactivewhat’s going on with this development?
I see the one in Albert Quay has now been with ABP for 8 months
8 months.
April 24, 2013 at 1:46 pm #805303Anonymous
Inactive….
April 28, 2013 at 9:29 pm #805304Anonymous
InactiveAn Bord Pleanala is expected to announce a decision shortly on the Owen O’Callaghan concert venue.
It will then be a case of O’Callaghan and Heineken making submissions to the City Council for public funding. Whoever the Council picks will obviously go ahead with the other presumably being cancelled. O’Callaghan has been more vocal and said he could start work on his before the end of the year if he gets investment from the City Council.
I’d say the Howard Holdings site where the Live at the Marquee concerts take place is a non runner.http://www.eveningecho.ie/2013/04/23/event-centre-for-city-would-lead-to-160-new-jobs/
May 20, 2013 at 6:30 pm #805305Anonymous
Inactive@thebig C wrote:
I think some of the renders actually look reasonably good….apart from the blank stark wall facing the river!! However, a conference centre here would ultimately kill off the proposed coinference venue in the docklands….which has the potential to be a much better site!
That’s the thing that galls me. I’ve no problem with an event centre at that location, but a massive, bland wall like that is very poor, particularly in light of the surrounding buildings (the Counting House, the Elizabethan fort, St. Finbarr’s cathedral etc. I assume it’ll also block off the view of St. Finbarr’s from along the South Mall, which would be a real pity. It’s one of the really pretty views in the city centre.
October 16, 2013 at 4:25 pm #805306Anonymous
InactiveInteresting to see the Government set aside €10m of lotto money in the budget yesterday to help fund the Cork events centre. Accordingly one of the 3 proposals with pp (namely BAM’s Beamish proposal, OCP’s Albery Quay proposal and the former Howard Holdings docklands proposal – now owned by NAMA?) will be going ahead soon I’d have thought.
From today’s IE
http://examiner.ie/budget/news/10m-for-development-of-cork-events-centre-246431.html
November 22, 2013 at 2:10 pm #805307Anonymous
InactiveA friend shared the site below through facebook, I thought it was very interesting. I’m still not completely convinced by the interface with the river, but I’m warming to this idea, not least because of the excellent brand identity they’ve generated makes me think it could be a big success;
http://www.supportbreweryquarter.com/
I started googling it, and also found this – again, great brand identity;
http://www.behance.net/gallery/Brewery-Quarter-Beamish-Limited-Edition/7065735
Here’s Scott Tallon Walker’s scheme as published on their site if you’ve not seen it;
http://www.stwarchitects.com/project-information.php?p=09164&t=p