Re: Re: The sensitive issue of the title “Architect” and the Building Control Bill
Home › Forums › Ireland › The sensitive issue of the title "Architect" and the Buildin › Re: Re: The sensitive issue of the title “Architect” and the Building Control Bill
@Solo wrote:
Hi ONQ,
I still work in the UK where building control applications are made similar to our old bye-law applications. These work very well over there. They brought in self certification as an experiment and not long after went back to the L.A. certifying as well as the Architect and other design professionals.
(nods)
I can relate to that
I have carried out remedial works to houses designed and certified by others in Ireland.
We requested the LA to come on board in the person of the Building Control Officer, who was taking a very pro-active stance on the matter.
He ended up writing a building defects sheet to which we responded proposing remedies.
He would then write back confirming acceptance or otherwise.
Usually he accepted, because we would agree it all one site.
My point is that the system works very well and it has been my experience having worked both systems that some of the old Bye Law inspectors were excellent and others a nightmare. I cannot say I have had the same difficulties in the UK. On any job of consequence the builders just up their game as they know the ropes. It is on smaller more domestic scale or self builders where the problems occur.
I agree (sighs) about the variations with the BCO’s and I have to say I was quite lucky with the ones I dealt with.
I presume you made that last comment that in relation to the UK?
Your suggestion is one I have discussed with the Department of the Environment and the Green Party who are presently seeking input from construction professionals on the good and bad points of our present regulation. In particular they are attempting to address the difficulties that are being created by Local Authorities taking guidance documents as cast in stone commandments I refer to the installation of water treatment plants in single dwellings in particular.
Well, the good and bad of it is still the same – Building Control Officers jobs get advertised every three years IIRC and they get appointed – after that, its their call, and at least one MRIAI got a come-uppance when he failed to realise that, despite me telling him AND quoting the relevant part of the BCA 1990 to him.
Your suggestion of a single body to whom we make a single application with Fire, Part M and Ber documents all included is simple, workable and more likely than not efficient so it will never see the light of day sorry. For our present Minister your suggestions would need to have a greener more out there feel and be expensive, impractical and of course half baked. If you can lower you standards to come up with such a suggestion I think I might be able to interest our present Minister to adopt it
Nope, that’s my problem I give excellent advice – I’ve just seen a big job go west because I gave the client contact some very good advice which caused him to think twice, then put it on hold, because of drainage problems it wasn’t in his gift to resolve.
My last project in the UK I had to not only show all of this at planning but also write a mobility report, produce a noise report showing how not only our building might impact the existing area but how the area might impact the residents/occupants of our building. I also had to write a waste management report stating how all construction related waste would be dealt with and then how the finished building would continue to deal with waste issues. The final report dealt with energy usage and how using better construction methods, materials and employing new technologies the building’s carbon footprint could be reduced.
Bejaypers!
I cannot even begin to compete unless its one of those jobs that need an EIS, which is around 20-25 grand’s worth of information you end up co-ordinating but only doing a fraction of yourself.
This made the planning application and building regulation a rather expensive process for my client but it really highlights to all what needs to be done and having done this it make the construction less problematic as everyone has a clear idea of what is to be achieved and how it can be achieved.
I can believe it, but that’s the best way to sell all this additional regulation to a client – as a means of making the building programme safer and hopefully better co-ordinated and quicker.
I know I said in a previous post that I would stop agreeing with you as it makes the thread boring but what can I say sorry.
(taps fingers)
Buggah!
ONQ.