Re: Re: The sensitive issue of the title “Architect” and the Building Control Bill

Home › Forums › Ireland › The sensitive issue of the title "Architect" and the Buildin › Re: Re: The sensitive issue of the title “Architect” and the Building Control Bill

#815404
Anonymous
Inactive

@Solo wrote:

Hi ONQ,

My last project in the UK I had to not only show all of this at planning but also write a mobility report, produce a noise report showing how not only our building might impact the existing area but how the area might impact the residents/occupants of our building. I also had to write a waste management report stating how all construction related waste would be dealt with and then how the finished building would continue to deal with waste issues. The final report dealt with energy usage and how using better construction methods, materials and employing new technologies the building’s carbon footprint could be reduced.

.

The LA has requested all of the above in the last 3 medium – large planning applications we’ve done in Ireland. And that’s 2 different LAs. I don’t think that you can adeqautely design a larger building – especially a “green” one without them and, from a cost point of view, I’d say clients are now getting all of the above for less than the architect’s fee 3 years ago