Re: Re: TCD’s €100m development plan

Home Forums Ireland TCD’s €100m development plan Re: Re: TCD’s €100m development plan

#748504
notjim
Participant

yeah so further to this, i walked along here again yesterday and i don’t see the problem with providing an entrance way through the bike factory building retaining both it and the nuzum brothers shop next door. the bike factory building has quite a large opening currently bricked up, surely this could be incorporated into to provide a rather stylish entrance, as good, anyway, as the one that will replace it. in the pictures the new enterance way doesn’t look to be much more than one story high either. as for the other end of the street, there is already an enterance here, not very grand and always locked, between the six shops with fancy edwardian shop fronts and the rest of the terrace. it can’t be beyond the wit of man to open up an enterance here while doing less damage to this rather fine, albeit abused, street front.

Latest News