Re: Re: Metro North

Home › Forums › Ireland › Metro North › Re: Re: Metro North

#795582
admin
Keymaster

@Cathal Dunne wrote:

Total rubbish. PPPs are not the reason Ireland’s bond spreads are so high, it’s the banks which are causing that. Market uncertainty at the cost of the Anglo and INBS bailouts are driving up interest rates and if we don’t put together a convincing and viable plan to sort out these two banks, Ireland will be paying 5.5% interest on bonds Metro North or no Metro North. At least with the €416 million spent on the Convention Centre Dublin you will get a billion euro in business tourism for Ireland. €416 million to Anglo just gets you more angry taxpayers. It’s money down the drain.

For a start 5.50% is no longer available its now well north of 6%; secondly the overall tourism business is worth €1bn a year; the conference centre if it were a €1bn euro business wouldn’t need any subvention. This is not about dealing with the governments abject failure to deal with the banking sector when the bubble was inflating it is about ensuring the same attitude of ‘a sure the figures will look after themselves in time’ attitude is banished from power for decades. Something is viable or it isn’t and at a time like this everything must be viable day 1.

@Cathal Dunne wrote:

I don’t need to ask the passengers – I am one of them and I can tell you that a system of underground rail tunnels would be a lot better than Luas. A Luas line to the airport would just hold up the traffic on the northside and negate any benefit it would bring.

A TGV to Cork would be a lot better than the existing but because it isn’t viable it won’t be built. The traffic impact of a conversion from segregated Luas to semi-segregated Luas would be the minimal extension of Luas from the top of OCS to not even Broadstone and St Mobhi Rd.

@Cathal Dunne wrote:

Furthermore, I’ve been on the Red Line as it goes through the Heuston and Conolly stops and the amount of people who get on fills the trams up to full capacity regularly.

But I thought the red line was a failure? Outside peak times when Hueston filters an entire commuter rail hub onto shortened trams Luas is far from capacity.

@Cathal Dunne wrote:

Given that the Airport is a much bigger station than these places you would have to employ Japanese-style crushers at the airport to fit everyone into the trams.

Kings Cross 60m tube journeys a year (rail hub) Heathrow roughly 8m tube journeys were made in 2008 or a mode split of roughly 12% of total air passengers.

@Cathal Dunne wrote:

A 90m-long Metro train is much better in these circumstances. This is because Metro has the capacity to take the surges in passengers which will occur at the Airport. Luas simply does not.

Surges in air passengers occur much later than the morning commuter peak; therefore the passsenger load imposed is a bonus to a network and not a significant supply consideration.