Re: Re: Metro North

Home › Forums › Ireland › Metro North › Re: Re: Metro North

#795573
Anonymous
Inactive

@PVC King wrote:

The key point in this is that the Luas option was not properly assessed;

How do you know that? You may be right but it is impossible to tell without seeing the studies carried out by the RPA. There is some mention of the street tram alternative in the EIS but it is not discussed in detail.

Street level luas has different characteristics from segregated metro. Segregated increases the max capacity, the train length, the frequency, the speed, the reliability. All of these are key characteristics in attracting passengers. Now you may be right that street tram is a better option but without seeing rthe studies or even knowing if they exist, I can see how you might also be wrong. This is angels on a pinhead stuff.

Externalities both positive and negative are considered in every project; however equally opportunity cost must be considered if MN were sanctioned it will lead to far deeper cost cuts elsewhere i.e. healthcare, education, alternative transport projects.

Yes, you’re right. The opportunity costs have to be considered for every public infrastructure investment. We don’t know how well they have been considered. Maybe they should just pour the money into the health service instead. Maybe not.

I would draw your attention to the link you posted below and the Goodbody report which found the WRC was actually viable. When the clear truth is that it was a politically motivated unviable mess on delivery

The Goodbody report I read stated that the WRC phase 1 (the least crazy bit) was unviable even under optimistic passenger assumptions. Yes the decision was made for political reasons.

The number of editorials against the project including Sunday Business Post are starting to mount;

Journalists that I know regard reading each others’ articles as research. There is also a sort of premature buyers’ remorse expressed nationally before every large purchase. Sunday Business Post was very anti-luas prior to opening. Often it is just expressing the views of business owners who fear some temporary traffic disruption during the construction of a project that will ultimately benefit them.

Greg Ip of the Economistis of the opinion that raising money on the bond markets is a non-runner.

I’ve just listened to that interview and I heard him saying that Ireland is a small country in comparison with the size of the european stability fund and that we should be OK. We easily borrowed what we needed for the year in 2010 even with all the NAMA bonds issued and still due to issue. The ECB is keeping us afloat and will presumably decide with the EIB whether to allow us to proceed with the metro project.

I think PVC that you have said everything that you want to say on the Metro.

  • You think it costs too much
  • You think the passenger projections are overblown
  • You think a cheaper street luas would be better suited
  • You think the finance won’t be there for the project on the markets.

You can’t just keep typing it in again and again without starting to spam the site. What are your insights on some other topic? Any other topic!