Re: Re: Metro North

Home › Forums › Ireland › Metro North › Re: Re: Metro North

#795560
admin
Keymaster

Board approves with condition that if it is not built to upgraded planning and design standards that no more development will be allowed outside 15km – 200km of the city this includes no more car spaces, roads anything for the next 100 years unless 5 proper metro lines are built! (even if they have permission already)

These lines are being built/have been built

Connolly – Maynooth
Connolly – Greystones
Connolly – Pace
Spencer Dock – Howth
Spencer Dock – Drogheda
Spencer Dock – Hazelhatch
Port Tunnel busway

Throw in

Mallow – Midleton
Cobh Spur
Galway – Oranmore (Twin Track)
Limerick – Ennis (new stations Parkway/Moyross/Cratloe)

And there is more than enough capacity with modest further investments in the regional cities and no radical planning changes are required other than local authorities complying with regional and national policy documents.

The other condition would be that rates/services/water prices are calculated via logarithmic formulas mtr square of land/floor space less living costs. This would herald a new era of planning and development in Ireland and the true affordable house/office ect.

Offices are already highly affordable given the quality of many of the individual buildings and level of professional service support available. Homes relative to incomes are outside some pockets close to trend values. Driving property values down further is not in the national interest given the NAMA exposure to the taxpayer. Getting the public finances back into shape by way of cutting what are exceptionally bloated public sector costs and expanding retraining capacity (bye bye FAS) are the only issues at present