No, but the people who live just down the road do.

This is an industrial area beside a motorway and an airport; very few people live there and in all but the most overheated property markets residential development would not be possible unless it is for social housing; i.e. housing that is incapable of contributing development levies.

@Cathal Dunne wrote:

Grangegorman will be built as it contained in the Government’s revised capital plan. DCU’s growth has been limited by poor transport access. I and many other of my classmates ruled out DCU as a college option because of the requirement to change buses a number of times to get there. With a direct rail link there its growth will be given a great boost. The DCU stop will not only serve the university, but the whole community of Whitehall/Glasnevin.

The governments capital plan is a work of fiction which they are incapable of delivering; Grangegorman although a worthy project cannot be built as the funding model was based on the sale of their existing campus. DCU has grown from no students in the 1970s to c10,000 today; how is that limited? You and your classmates ruled out DCU because you got a better offer; TCD is a World class university, DCU is a decent one but your argument on this is ridiculous. As for the whole population of Glasnevan; a large proportion is walking distance to the Maynooth line and for Whitehall a less than 5 minute bus journey to Drumcoundra.

@Cathal Dunne wrote:

This point is irrelevant as the Metro links with bus routes at virtually every stop. As I said before about your imagined rural idyll that is Swords people who live near the stops can walk and those who live too far away can get the bus to the Metro and then get on. Anyway, I find it interesting that I am being asked to justify Metro on the basis of people who live right beside it by the same man who dismissed getting the Metro from Drumcondra to O’Connell St. because people should walk the distance.

What I said on Drumcoundra is that there is a choice between a Dart/Luas interchange or walking either is comfortable; you would certainly walk on a summer day. On the subject of buses why can’t people in Swords take a bus to Dart at Malahide and people in Ballymun and Whitehall a bus to Drumcoundra?

@Cathal Dunne wrote:

International consultancies were recruited by the RPA to examine passenger numbers and demand sources for the Luas and they were proved right. The RPA repeated this process with the Metro and there’s a good chance they’ll be proven right again.

Luas had a cost of €800m for 2 lines which do not leave Dublin postcodes i.e. built up areas with much denser populations excluding the Naas Rd routing fiasco; to acheive viability for two routes at that cost was never difficult. The Metro forecasting was done much later in the middle of a property bubble which over-estimated development figures by 500% – 1000% and airport passenger number by c50%. Plot in half the City distance; loss of one third of the airport passengers; loss of 80-90% of development potential and you have very useless projections.

@Cathal Dunne wrote:

So you’re telling us that the ridiculous lending to the likes of Liam Carroll, Sean Dunne, Bernard McNamara et al. to build ghost estates is more viable than a rail link running through our capital city which will benefit us form more than a century? That’s mad.

None of these individuals built ghost anything; however like Metro North they were wildly over-optimistic in their demand projections, wildly overoptimistic in their funding models and very bad at controlling cost; given the Luas experience on cost control one does not want to let the RPA anywhere near a new type of project when the country is so close to IMF management.

@Cathal Dunne wrote:

Metro West and Luas F haven’t been binned – work is ongoing on these projects and they will be completed as the situation allows it. While the RPA are not managing DART Underground, they are working closely with Iarnród Éireann on this project since both of them will have stops at Stephen’s Green. Furthermore, the National Transport Agency provides even more linkage between the two projects.

MW and Luas F are dead and anyone working on them should be made redundant; the RPA are incapable of working with anyone; just look at intergrated ticketing; 6 years later there is none and that is under their watch.

@Cathal Dunne wrote:

The private consortium given the tender to build it will pay for it 2010-17. We then start paying for our share out of 2017-47 tax receipts. Given that the economy will have recovered by 2017 and will be substantially larger in 2047, that gives us the fiscal basis to afford the €3-5 billion expended on Metro North.

As you well know there is only one consortium left in the tender process so they can charge what they like; there will be no competitive pricing. There is no gaurantee that the economy will have recovered to any substantial degree by 2017, it will hopefully be a more stable economy but it certainly cannot afford interest payments of €165m – €275m per year on this project and that assumes it were funded on government borrowing and not by a private party who would likely charge a 2% profit margin or €60m – €100m on top.