@Cathal Dunne wrote:

Au contraire, when you have someone who jumps on the mentioning of one possible use of the line at one station of it as the justification of the whole line they are the truly dim individual. On top of that, if you actually look at the area in which the Northwood stop will be built it is already quite built up and will be increasingly so as the Metro is completed and serves the area. With the M50, Airport and Metro all in close proximity, this area can only grow and grow.

Warehousing does not provide passengers.

@Cathal Dunne wrote:

Well whatever about that, Maynooth has a rail connection, Trinity has a connection and DIT at Grangegorman will have a Luas connection. As a Trinity student, I know of many people who use the DART to get to college and benefit greatly from it. This illustrates how valuable a direct rail link to a university is. If anything you’ve merely emphasised how urgent it is to get every college in Ireland connected to the rail network in some shape or form.

Grangegorman will not be built for a long time; like MN its funding model is busted due to the construction collapse; I did leave out Maynooth which does have a rail connection but what of all the other consituents of NUI plus Limerick, Belfast & UU? DCU has not only survived without a rail line it has thrived.

@Cathal Dunne wrote:

On a related point, you have also failed to respond adequately to my point that if a residential area of similar density to Whitehall/Glasnevin in Maynooth housing a smaller university than DCU can support a heavy-rail line and station then DCU/Whitehall/Glasnevin can support a light-rail line.

In any case, your points about individual stations are nit-picking. The overall catchment area of Metro North is 400,000. Add in the tourists from the airport, those using Metro to connect to something else and all the rest and you have a large and plentiful market for a metro line to serve. Cities with smaller populations and lower densities than Dublin already have metro, we should too.

With a city population of 506,211 and Swords which has village population of 2,514 and which actually fell between 2006 and 2002. You would ask the question of the following populations how many are within 1kms of a proposed stop

Swords Forrest 12,443
Swords Glasmore 7,799
Swords Lissenhall 9,072
Swords Seatown 5,934
Swords Village 2,514

All of these areas excluding Seatown and the Village are sprawling rural wards some of which go half way to Ashbourne.

Of your 400,000 catchment how many are within 1kms of the proposed line?

@Cathal Dunne wrote:

Your conflation of the banking crisis and Metro North is egregious. Unlike the casinolike carry on of our banks, Metro North is an investment in our future. Unlike the build and borrow now, bother later attitude of developers, Metro North is a long-term project which will serve Irish people for generations.

Is this project being paid for with cash?

The banks in many ways had more justification in that they at least had past performance to justify the cost benefit analysis underpinning much of the lending; this project has never been proved to be viable.

@Cathal Dunne wrote:

No, I don’t miss the bigger picture as I have regularly referred to other parts of the overall transport plan for the GDA. Once Metros North and West, the DART Underground, Luas BXD, Luas Line F and the Bray extension are built, we will have a public transport network to be proud of. A transport network which reflects Dublin’s stature as a European capital city.

Metro West and Luas F have both already been binned as you well know; the Bray extension is a new project I’ve never heard of and the RPA are not involved in Dart underground.

Provide evidence of the 1kms catchment and where the money is coming from and people may take what you say seriously; fail to do that and you remain a parrott regurgitating tripe belonging to a lost era of borrow and splurge.