Re: Re: Metro North
Home › Forums › Ireland › Metro North › Re: Re: Metro North
@johnglas wrote:
Fergal: PPP is a licence to private-sector wideboys to print money; once the public sector shakes hands on the deal it will be left counting its fingers. Don’t believe a figure of the calculations.
Spot on there is no way anyone would invest €4.5bn for a return of €150m a year or 3.33% they would want 8% or €360m a year which would be at a minimum linked to RPI or close to €400m by the time it became payable. The lesson on this really should have been learnt with the West Link where a private operator contributed £32m for a 3 mile motorway and the state then built the other 15 miles of motorway to build up their revenues.
Unlike Westlink this is very much a stand alone piece of infrastructure which beyond serving a narrow commuter catchment does nothing other than link the airport with the retail / tourist district. It misses the core office district and does nothing to enhance existing rail lines.
When a Japanese consortium made an approach in the 1990’s they were prepared if given government consent to design, aquire land, build, operate and maintain a metro system. All the government of the time had to do was sign it off and the metro with a fare tarrif of c €5 per ticket per journey would have been delivered with no cost to tax payers.
I have no doubt that such a system would have been radically different to that proposed by the RPA in that it would have been the same length but gone virtually in a straight line from the airport to the CC with no stops and then extended to the office districts. We will I guess never know what route it would have taken and how it would have shaped development patterns given the economic growth that was possible in that period.
Unlike the Luas approach of a million stops which limited people use there would have been a real opportunity to build stations carrying 100,000 – 250,000 passengers per day.
No stops other than O’C St, St Green and the Airport will ever carry six figures per day; any underground station that doesn’t carry at least 100,000 per day should be built given the costs; this is where overground has a dramatic advantage.