@PVC King wrote:
A spur to the Northern Line would cost €100m – €150m and be intergrated.
I am so sick of people suggesting this option…Studies by IrishRail have advised the government that the option of a spur off the northern line (near Malahide) although cheaper is completely nonviable. This line (double track) is already used by DART, Commuter, Intercity and Enterprise services. The line capacity at the moment is already at its absolute limit. Bringing a hugely busy spur line to an already constricted bottle neck (Connolly st. to south of loop line bridge) would just be impossible unless massive engineering works were undertaken to 4 track the entire line to say Bray.
It is also annoying that people are still seeing the Metro North as a line that ONLY serves Dublin airport. Its main passenger base will be commuters from north county Dublin who have for years been poorly serviced by public transport. This is the main reason that it is being built and it is a very negative connotation to view the Metro as an airport only connection line.
I do believe though that the Interconnector heavy rail DART line is a much more important infastructure, and is obviously being viewed as such by the EU as it is receiving funding under the TEN-T 2009 programme. http://www.transport21.ie/Projects/Heavy_Rail/DART_Underground.html