Re: Re: Luas Central – Which Route?

Home Forums Ireland Luas Central – Which Route? Re: Re: Luas Central – Which Route?

#763603
Anonymous
Inactive

I just want to point out that the so called metro upgrade on the green line will not be a real metro (ie a heavy rail line) but will be a Light Rail system (ie a tram, based on the Porto system) which has been branded as a metro, probably to fool the people into thinking they’re getting a metro system.

Also this so called metro will run through streets, so you can forget the 90 sec frequency. This also will apply to the current RPA Cherrywood extension proposal. So all the extra effort regarding the green line been able to be upgraded to a (heavy line) metro has gone to waist.

Latest News