The Limerick Tunnel Spring newsletter is now available.

It looks likely that the first 5 km’s of the road (from Rossbrien to the Dock Road) could open this autumn. Laying of the road surface is set to begin in early summer.

The St Nessans Road overbridge should be open to traffic in the next week or 2, this will allow construction to begin on the SRR mainline underneath.

You would think that this partial opening would be a positive move but the traffic chaos at the Dock Road interchange dosent bear thinking about!:eek: