Re: Re: Is it really now time to consider restriction of service

Home › Forums › Ireland › Is it really now time to consider restriction of service?? › Re: Re: Is it really now time to consider restriction of service

#816485
Anonymous
Inactive

@onq wrote:

Houses are often set out by builders based on the planning drawings, because that’s what they have permission for.
I trust your CPD courses are keeping you up to speed on these “new-fangled” ideas…

Thus, last time I checked, the design of the building was supposed to be completed at planning stage.

If you’re willing to oversee builders building off your planning application drawings well good luck to you, because you’ll need it.
Undoubtedly you’ve informed your P.I. insurer.

@onq wrote:

..While you could claim certain things are allowed under the exempted development schedule, widening the house by circa 300-400mm is not one of them, nor is relocating nuderground services [although the “sure who’ll know?” brigade do this all the time] and installing a second set of foundations to one side was beyond my clients means.

The point being that this genius hadn’t ALLOWED for an adequately wide living room [3.3M min to 3.6M pref] for a small house, hadn’t ALLOWED for 80-100mm insulation, still had LEFT OVER in excess of 2.5m of site and had designed the wrong size WC.

Excusing his incomptence at planning stage is not acceptable and you have just destroyed your own credibility by doing so.

You’re waffling and scrambling here and you know it.
In a planning application the size of the jacks, as indicated in the plan, will not inform the decision.
A non-compliant internal layout is bad design but insisting that the internal layout in the planning drawing is the complete and finished design is absolutely wrong. The internal layout, such as an alteration in the toilet size, can be done post-planning.
Where have I excused incompetence? RTFP, old stock.