Yeah I agree that it should be done, but safety and priorites should dictate that the Fermoy – Mitchelstown, with its new relief road and basicially 2+1 most of the way should be postponed until the worst section of the N20 (single carriageway, no hard shoulder, poor line of sight) is done.

My view FWIW. Although the work should have been done by 2006 and heads should roll for that, a 16km stretch of single carriageway, 2+1 and a relief road should be a lower priority than a road that is nothing but a national disgrace.