Re: Re: architect complaint

Home Forums Ireland architect complaint Re: Re: architect complaint

#784253
Anonymous
Inactive

Because the development in question was constructed in beach of a planning condition, it was subsequently directed by An BORD Pleanala to move the development back, this meant having to demolish the existing building line blockwork. The drawings that were submitted didn’t comly with the modified condition. The architect left the dimension as it existed protruding from the front facade of the house.