1966 – Church of Our Lady of the Assumption, Newcastle, Co. Down
Architect: McLean & Forte
Our Lady of the Assumption Church was first opened on 12th June 1966 replacing an earlier church on Main Street.
Our Lady of the Assumption Church was first opened on 12th June 1966 replacing an earlier church on Main Street.
Holiday house designed to take in the scenic views of the Mourne Mountains though continuous strip windows and a walkout terrace on the upper floor.
A strong geometric design,
Parker Green International, a developer submitted design proposals as part of a tender bid for the Albert Basin site in Newry.
In April 2013, the Department of the Environment Northern Ireland approved plans for the Maze Long Kesh Peace building and Conflict Resolution Centre (PbCRC),