1853 – Railway Station, Killarney, Co. Kerry
Architect: Joshua Hargrave
The railway terminus for the Great Southern and Western Railway,
The railway terminus for the Great Southern and Western Railway,
A long galleried shop, probably reminiscent of similar constructed in London at this time.
The school was built in 1853 at the expense of Richard White,
The massive factory developed over several years for W.
Constructed for the 4th Earl Annesley between 1852 and 1854 in a Scots Baronial style.
Well detailed clocktower and public water fountain,
Later internal works by Richard Mills Close.
Opened in 1842 by the Dublin &
Designed by Anthony Salvin (1799-1881), a distinguished English architect and an expert in fortified architecture.
A large and impressive stone Tudor arched gateway,