2010 – Grand Canal Theatre, Dublin
This brand new 2,111 capacity purpose built theatre was designed by architect Daniel Libeskind and is due to open in March 2010.
This brand new 2,111 capacity purpose built theatre was designed by architect Daniel Libeskind and is due to open in March 2010.
The building has been designed to accommodate a team working on the digitisation of the treasures of Trinity’s Old Library: a vital component of the plan to open the significant Manuscript and Early Printed Books collections of the Library to the world.
The landside bar and cafe in the new terminal at Dublin airport is a 84mm oak veneered plywood deformed grid shell as a baldacchino over bar and server.
The house is on a terrace whose split-section is native to Georgian Dublin;
The 40 metre span bridge with its fluid lines and undulating concrete surface will take trams,
The scheme is designed around a major new civic space,
Two Danish studios, 3XN and Henning Larsen Architects,
Two Danish studios, 3XN and Henning Larsen Architects,
The brief describes a complex arrangement of specialist interior spaces with an intricate set of inter-relationships and the design challenge is to order these spaces in a commodious,
A modernist pavilion sitting on a limestone plinth atop four broad terraces,