Re: Re: Exempted development concurrently with planning permissi
Home › Forums › Ireland › Exempted development concurrently with planning permission › Re: Re: Exempted development concurrently with planning permissi
March 28, 2011 at 6:25 pm
#816741
Inactive
At the start of last year there was a consensus on Archiseek and elsewhere based on decisions received.
I have since seen an engineer drive a coach and four through the planning laws.
- Lodging a permission, seeing it appealed
- Getting a section 5, starting under that
- Lodging a second smaller permission
- Exceeding the section 5, apparently building the smaller permission
- Opening windows without permission on 1st floor elevations
- Getting permission for the first larger scheme
- Seeing to “agree ” the works
- LA holding the line.
- Rear extension roof design changed.
- Seeking retention for the revised works and getting it.
Un-believeable, but that’s how it goes sometimes.
ONQ.