Re: Re: Metro North
Home › Forums › Ireland › Metro North › Re: Re: Metro North
@cgcsb wrote:
Come now PVC, that’s not exactly true is it. The redevlopment of Ballymun represents a major densification of the area, the opening of Ikea, Swords Pavillions phase 3, the development of a new IT and Hospital in Swords and various other proposals for the area are definite possibilities.
Personally I think there’s no need for Metro to be underground between Swords and St Mobhi road. I’m not sure if the Phibsbobough Library is protected structure or not. But If not I would prefer the route to be above ground from Swords to a tunnel entrance in the park beside Mobhi rd, a new underground stn at Phibsborough allowing passangers to change onto the Maynooth line, emerge from the tunnel in the green space to the east of mountjoy prison continue through the site of the library, under the North Circular rd.(cut and cover), through the linear park, through the playground at canal bank and deep bore tunnel starting at the grounds of Kings Inn law library, continuing south with a stop at christchurch to change for DARTu and red line luas at Four Courts and a final stop at Stephen’s Green. The Densities between Stephen’s Green and Kings Inn could justify a deep bore tunnel.
The issue on MN is the relationship between cost and benefit; you will note that in analysing the route I left out Ballymun and commecial acitivity in Swords as the rebuilding of Ballymun is encouraging and even without MN phase 3 Pavillions will be an outstanding success; it has a great catchment of urban villages from Gormanstown to Ashbourne to Malahide and a horrendous amount of semi-rural sprawl with no adequate comparison retail provision, once retail sales bottom out the usual suspects will take space.
I agree that the area from Dominic St in has reasonable density but would also say that whether it routes via the 4 Courts/Christchurch or O’Connell St/College Green both areas will be adequately aleady be served by the Luas link up and Interconnector.
I can however see a project coming in at €750m – €950m being affordable; I agree that building a surface route in to just north of Phibsborough containing an interchange delivers the entire northern route; to cut costs further I’d CPO land and tender 25 year leases for multi-storey carparks North of Swords to people like NCP & Vincipark to keep capital costs down.
Where I disagree with you is from South of the Royal Canal; I would leave Luas on the former canal bed (the locals can trade off transport for park or sell their now more valuable homes and move to a garden suburb) from Consitution Hill I would split Luas in three routings
1. Connecting with the now extended Luas Green line
2. Connecting with Luas Red – shortest route to Capel St or Smithfield
3. Connecting with Dart at Newcommen Curve Spencer Dock via Mountjoy Sq & if capacity on the Swords routing proved inadequate via O’Connell Street.
The above covers more areas and keeps many journey’s away from An Lar and from a cashflow perspective routings 2 & 3 can be added as capacity runs out on the O’Connell St routing.
The future is about getting a lot more from less……

