Re: Re: Metro North
Home › Forums › Ireland › Metro North › Re: Re: Metro North
@PVC King wrote:
This is exactly how Argentina destroyed a decent fiscal position on the back of the dotcom fallout in 2001. They entered a number of PPP financing deals in the late 1990s which destroyed bond market sentiment as the risks created directly by the scale of the paybacks required were factored into the fiscal position.
If a Japanese design build and operate model were available with very limited exchequer payback it should be done but if the Argentinian model is all that is on offer all I can say is you didn’t want to be Buenos Aires in January 2002 it was ugly.
Less is more; will he take on SR Technics?
I don’t know the exact details off the PPP, but it sounds attractive, and fairly suited to the current economic environment.
The PPP is a build and operate contract, where the bidders will build the Metro, and run it to a specified service level for 30 years. The payments will take the form of a yearly availability payment, where there will be penalties for siginificant downtime, and the first payment is not due until after the metro carries it’s first passengers.
The tenders are estimeted around 4.5billion, from what I’ve heard. This would be a cost of approx 150 million a year, for 30 years, including all operating and maintenance costs.
While it won’t help the budgetary situation, realistically, it won’t require any cash until 2015 at the latest, and a fairly moderate amount per year after that. Assuming a daily ridership of about 60,000 (a good bit less than the Luas, btw), paying roughly 3 euro a day would contribute roughly 50 million a year, and as fares rise over the years, the debt will be paid off progressively more and more by the farebox.