http://www.irishtimes.com/newspaper/ireland/2009/0302/1224242083966.html
Tenders for Metro North to be lower due to falling costs
FRANK McDONALD, Environment Editor
FOUR TENDERS for Metro North received by the Railway Procurement Agency (RPA) last Friday are likely to be substantially lower than anticipated because of an estimated 20 per cent fall in construction costs.
Why isn’t this information in the public domain; estimated is simply not good enough the costs are either estimated or a formal offer. Basing 2004 costs of €4.58 billion with inflation of 4% p.a. for 4 years a figure of €5.36bn would result that is assuming RPI and not SCS construction costs which were much higher are adopted; discount 20% from 2008 figures and the costs would be €4.469bn.
A sum of money the country simply doesn’t have to throw at a single unintegrated rail line nor does it have the €3.81bn that a 20% decline from 2004 costs would suggest.
The issuance of bland generalities has to stop and the actual consequences financially of a departing government potentially signing this off on their last day in office need to be clarified .