http://www.irishtimes.com/newspaper/ireland/2009/0302/1224242083966.html

Tenders for Metro North to be lower due to falling costs

FRANK McDONALD, Environment Editor

FOUR TENDERS for Metro North received by the Railway Procurement Agency (RPA) last Friday are likely to be substantially lower than anticipated because of an estimated 20 per cent fall in construction costs.

The project, known to have been costed at €4.58 billion in 2004, would directly create between 5,000 and 7,000 jobs and would represent “the type of economic stimulus that Ireland needs at the moment”, said RPA chief executive Frank Allen.

A preliminary oral hearing on the agency’s draft Railway Order for Metro North, an 18km mainly underground line linking Swords with St Stephen’s Green, opens today in Croke Park before Kevin Moore, senior planning inspector with Bord Pleanála.

More than 300 submissions have been made, mostly in support of the project, after the draft Railway Order was submitted to the appeals board last September, Mr Allen said. “It’s at an advanced stage of the planning process so now is the time to move ahead.”

Procurement of Metro North was also “at a critical stage”, with some 600 boxes of tender submissions from the four “preferred bidders” – Irish and international consortiums with experience of tunnelling projects. These are to be evaluated in the coming months.

“Value for money is far greater now than it was even a year ago,” Mr Allen said, adding that an index compiled by the Society of Chartered Surveyors showed that there had been a 20 per cent drop in construction tender prices.

After the four tenders are evaluated, he said the RPA would invite two of the consortiums to submit “best and final offers” in July, with a view to choosing one of them for submission to the Government by the end of this year.

Mr Allen explained that under the public-private partnership deal being contemplated by the RPA, Metro North would be paid for over a 25-year period.

He said each bidder would have spent €10 million on their tenders. “It would send an important message internationally if the Government decided to proceed without delay on the project. But it would be very damaging if it didn’t.”

There is concern that with the Government facing an €11 billion shortfall in the public finances, Metro North could be a casualty.

This article appears in the print edition of the Irish Times

Bord Pleanála to hire experts to assess Metro North plan

TIM O’BRIEN

Bord Pleanála is to hire its own experts in the areas of noise, traffic, vibration and ground settlement in assessing the Railway Procurement Agency’s plans for Metro north, the preliminary inquiry into the metro was told this morning.

Opening what he said was a “housekeeping” session to decide on the running order for the inquiry in Dublin’s Croke Park today, Bord Pleanála senior planning inspector Kevin Moore said there had been almost 200 formal observations on plans for the 18 kilometre route from St Stephen’s Green to north of Swords, eight kilometres of which is to be underground.

James Connolly SC for the Railway Procurement Agency told the hearing he expected the case in favour of Dublin’s first metro route would take about six days to outline.

Others who are seeking time at the hearing include the Mater Hospital, schools, An Taisce, Iarnród Éireann, Fingal and Dublin City councils, Dublin Airport Authority, traders associations and individual residents associations.

The inquiry will also provide a period for cross-examination of witnesses which is expected to be considerable.

Colm Costello for the CIE group said negotiations between the procurement agency and the CIE group were ongoing and their success would impact on how much time the group would need to make its observations.

Mr Moore told the inquiry that once the running order and likely timescale for the inquiry proper was established, each of the parties would be advised in writing of the probable length and venue of the inquiry.

An environmental impact statement (EIS) on the project last September predicted the effects expected from the construction of the Metro line could include serious impacts on sensitive equipment at the Rotunda and Mater hospitals, and the possibility that the Mater may have to make alternative arrangements for operations.

and

http://www.irishtimes.com/newspaper/frontpage/2009/0227/1224241894653.html

“We will look at which infrastructure projects can be safely deferred or abandoned. That means that some projects, like the metro projects in Dublin, would be put on the back-burner. We would scrap the old National Development Plan and reprioritise smaller, labour-intensive projects that can keep as many tradesmen and builders employed as possible.”