My architect won’t listen to me.

Home › Forums › Ireland › My architect won’t listen to me.

Viewing 20 posts - 1 through 20 (of 53 total)
  • Author
    Posts
  • #709568
    Meccano
    Participant

    My architect won’t listen to me.

    I engaged him to design a house, which I had very clear ideas about. I gave him detailed instructions, but he largely ignored them.
    He spent months going down a design path which I suspected the Planners would not approve – and that is exactly what happened at the planning meeting last week. They told him it would be rejected.
    Now we’re back to square one and he is asking for more money.

    What should I do?

    #792375
    Paul Clerkin
    Keymaster

    I would talk to the RIAI – they have an arbitration service I believe

    #792376
    Anonymous
    Inactive

    why is he asking fo rmore money if his first design was unnacceptable???? is he familiar with the requirements of your local authority?

    i would concur with pauls advice, assuming he is riai approved….

    #792377
    Anonymous
    Inactive

    My advise to the poster is to firstly check if he is RIAI registered or not, and perhaps ask the RIAI for advise. You need to raise the issue with the architect if budget and time are important, which they usually are!

    #792378
    Anonymous
    Inactive

    I’m afraid that if I involve the RIAI (he’s a member) I’ll be setback again by several more months.
    What would they do exactly?

    He is asking for more money because (I presume) the payment I made him to draft initial plans was months ago, and now that he has to re-do things he wants another payment.

    He is on a fixed-price contract to get Planning Permission. I paid him 25% of that fee so far, but we have gotten nowhere and he wants more to continue.

    I appreciate your advice.
    Is payment normally made in advance of work, or after it is completed?
    I don’t get paid in my job until my work is done.

    #792379
    Anonymous
    Inactive

    architects working under an RIAI contract are usually paid in stages, which amount to stages 1, 2 and 3 up to planning which can be invoiced at various times in design development and the planning process.

    if you can document where the errors on the part of the architect have taken place and where your concerns as a client have been raised, you may get some satisfaction from the institute in the form of an informal arbitration on what is fair in this case.

    #792380
    Anonymous
    Inactive

    @Meccano wrote:

    He is on a fixed-price contract to get Planning Permission. I paid him 25% of that fee so far, but we have gotten nowhere and he wants more to continue.

    So if the project doesn’t getting Planning Permission you don’t pay?

    #792381
    Anonymous
    Inactive

    architects working under an RIAI contract are usually paid in stages, which amount to stages 1, 2 and 3 up to planning which can be invoiced at various times in design development and the planning process.

    Right. But is the payment normally demanded before the stage is done, during the stage, or after it is done?

    if you can document where the errors on the part of the architect have taken place and where your concerns as a client have been raised, you may get some satisfaction from the institute in the form of an informal arbitration on what is fair in this case.

    I’ve kept every email and piece of correspondence.

    So if the project doesn’t getting Planning Permission you don’t pay?

    No thats incorrect, as I already explained.

    I don’t want to give him any more money until he starts listening to my requests, and actually produces something I want. Last time I paid him he proceeded down his own path and ignored or laughed off my complaints about what he was doing. Obviously he was secure in the knowledge that he had my money and I couldn’t do a thing about it. I don’t want that to happen again.
    This has taken 4 months already, and I have nothing to show for it.
    Nothing.

    #792382
    Anonymous
    Inactive

    @Meccano wrote:

    Right. But is the payment normally demanded before the stage is done, during the stage, or after it is done?

    after it is done. inception fee after inception. sketch design fee afer sketch design. agreed design fee after agreed design. planning application fee after lodgement of application. the fee would not usually be dependent on a grant of planning, as the work has already been completed.

    #792383
    Anonymous
    Inactive

    give up him! it is not the only way use Architect to get planning, there are some Interior Architects, Architecture Tech, they also can work for you.:) 🙂 🙂
    to be a good architect must be a good person at first!
    I think!!!!!

    Chao Chen:) 🙂 🙂

    #792384
    Anonymous
    Inactive

    @Meccano wrote:

    So if the project doesn’t getting Planning Permission you don’t pay?

    No thats incorrect, as I already explained.

    .

    what you said was “He is on a fixed-price contract to get Planning Permission”

    that, to me, means exactly what munsterman thought. Perhaps the problem is that you’re not explaining yourself in general?

    #792385
    Anonymous
    Inactive

    I wouldnt be too focused on the posters semantics… most clients would use the same phrasing.

    The percieved problem here, in my opinion, is that you seem to want to design the dwelling…
    @Meccano wrote:

    I engaged him to design a house, which I had very clear ideas about. I gave him detailed instructions….

    some architects have issues regarding the input the client has into the conceptual design, after all they are the trained professional. Maybe im wrong about this???

    Has his total concept been shot down, or certain aspects of it (ie height? fenestration? etc)… is the design modern whereas you want traditional ??

    To be honest, if his initial design has been shot done in a pre-planning meeting then it shows a lack of understanding, by him, with the councils requirements…. if this is case, and the concept was driven by him and not you, then he should not be requesting extra fee to redesign what was considered unacceptable.

    without knowing any of the particulars of this, it may actually be the case where the architect is trying to pursue a forward and innovative design, which would be commendable,….. and is hitting the usually obstructions of a cenophobic council and inelastic client.

    #792386
    Anonymous
    Inactive

    I wouldnt be too focused on the posters semantics… most clients would use the same phrasing.

    Yes, thanks for understanding – and I’m reluctant to be too specific, he could be reading this!

    The percieved problem here, in my opinion, is that you seem to want to design the dwelling…

    I certainly want a large input. I’m going to live in it.

    some architects have issues regarding the input the client has into the conceptual design, after all they are the trained professional. Maybe im wrong about this???

    When I hired him he seemed agreeable enough – but he changed as soon as he was engaged. His first drawings were so different from what I had in mind that I was actually shocked – and shock turned to despair when he refused to revise them and actually told me that ‘no-one ever criticised my work before’.

    Has his total concept been shot down, or certain aspects of it (ie height? fenestration? etc)… is the design modern whereas you want traditional ??

    The site is awkward – and what he attempted to do (besides being not what I wanted) was also obviously going to overshadow adjacent properties. I had met the planner myself before hiring an architect. I already knew what they would accept on the site, and even I could tell that this guys idea was not suitable. I was proved right – but only after he ignored my protests and went right ahead with his own preference.

    To be honest, if his initial design has been shot done in a pre-planning meeting then it shows a lack of understanding, by him, with the councils requirements…. if this is case, and the concept was driven by him and not you, then he should not be requesting extra fee to redesign what was considered unacceptable.

    Thanks to sw101’s concise answer I now know that I won’t pay another penny until he gets it right – for me.

    without knowing any of the particulars of this, it may actually be the case where the architect is trying to pursue a forward and innovative design, which would be commendable,….. and is hitting the usually obstructions of a cenophobic council and inelastic client.

    It is a contemporary design. That is what I wanted, and the planners had already seen my own idea and approved it.
    The architect ignored the obvious solution and pursued one which (IMHO) was ugly, a poor use of space, and doomed to failure due to its impact on the local buildings.

    I sit here now not knowing whats going on in the guys head. I’m not paying him until he produces – and I have no idea if he’s even working on the project any more.
    What a bloody nightmare!

    #792387
    Anonymous
    Inactive

    ‘no-one ever criticised my work before’.

    seems artistic ego has got in the way. Had a similar experience recently myself. Total nonsense.

    #792388
    Anonymous
    Inactive

    What did you do Alonso?

    #792389
    Anonymous
    Inactive

    it was a very different scenario and a very different, waaay more minor issue, which was far more easily resolvable. It was just the ego element of your problem that reminded me, not the actual nuts and bolts of the problem you have.

    #792390
    Anonymous
    Inactive

    @Meccano wrote:

    The architect ignored the obvious solution and pursued one which (IMHO) was ugly, a poor use of space, and doomed to failure due to its impact on the local buildings….I sit here now not knowing whats going on in the guys head…I have no idea if he’s even working on the project any more.
    What a bloody nightmare!

    If your relationship/ lines of communication are that poor, I think ciai’s advice might be best –
    @ciai wrote:

    give up him!

    Might be worth the while just to let him go – you dont owe him cash, and it seems that for whatever reason your + his ideas are all at odds witheach other. If it were me, I’d let part on good terms, take a few weeks off + then look at it all agian. Best of luck either way. The only thing that I’m a bit confused by though is that you said “the planners had already seen my own idea and approved it.” :confused:

    #792391
    Anonymous
    Inactive

    Have you all sat down and discussed the situation through calmly and clearly? It would be far better to sort it out among yourselves. Two issues have to be sorted out, money and design.
    No more monies should be handed over before both are dealth with. Ive seen this before and a nice long chat normally sorts it out. He had his reasons for the proposed design let him explain them. Im sure he was acting for your best interests.
    I would be fairly sure that he will take on board your ideas and listen to what you have to say from here, however if not, change architect.
    It is not uncommon to pay for architectural services in advance by the way. There are practices however who do not require cash up front.

    #792392
    Anonymous
    Inactive

    Hutton, I presume they approved it in principle, and didn’t “rule it out” from the outset at pre-planning. As you probably already know, a pre-planning understanding doesn’t in any way mean a grant will be forthcoming.

    I’m a tad flabbergasted at this fella’s total lack of professionalism. At the end of the day, he should know what pays the bills. It’s fine to suggest and prod clients but to completely depart from their wishes smacks of negligence, and downright idiocy. I can only presume he’s self employed and has no masters above him waiting for the fees?

    I agree with Hutton and ciai. Perhaps give him one more chance, if he’ll do so without charge. If not, it may be time to have the ‘it’s not me, it’s you’ conversation.

    #792393
    Anonymous
    Inactive

    Alonso I think your right for the most part but I wouldnt bother even giving the architect another chance – he’s departing too much from the clients brief. TBH neither would I bother having a “its not me,its you” conversation as theres nothing to gain, and at this stage the architect is likely to only take offence. I am still puzzled though by a client rolling out the design ideas at the pre-plans; the architects job I would have thought?

Viewing 20 posts - 1 through 20 (of 53 total)