ParticipantOpinions please. I think it’s an awful plan, at least one third of Route 2 is through greenfield, the other one is not much better. I feel sorry for anybody living in Lucan given they’re being missed out. What’s strange to me is I thought one of the things they found out from the study is that people in Tallaght won’t work in Lucan because of the transport difficulties between them. (I’m not a Lucan resident by the way)
http://www.rpa.ie/upload/documents/November%202006%20-%20Dublin%20Metro%20West.pdfNovember 23, 2006 at 5:49 pm #786355Anonymous
InactiveAn even more pointless project than I originally thought.
It will be excellent, however, should you want to visit three suburban shopping centres in one day – Liffey Valley, Blanch and the Square.
Who is going to use this?
I’m originally from Blanch and can’t even begin to imagine how this could be of any use to anybody out there.November 23, 2006 at 5:59 pm #786356Anonymous
InactiveI agree, its a bit of a nonsense. Why not just install a high quality bus service between these areas and at least see if there is a demand! T21 should be a plan that prioritises the transport projects needed to keep the city functioning (and its desperately needed as anyone involved in yesterdays farce on the M50 and N11 will testify – reports of 7 hour round journeys to and from workplaces!!). This is certainly not a priority. The Interconnector which along with Metro North are the essentail elements in the system should be in place within 4 years and not the 6 planned for Metro North and 9 planned for Interconnector.
November 23, 2006 at 6:03 pm #786357admin
Keymaster@StephenC wrote:
The Interconnector which along with Metro North are the essentail elements in the system should be in place within 4 years and not the 6 planned for Metro North and 9 planned for Interconnector.
I totaly agree a lot of T21 is very suspect such as the Citywest extension and this whilst more and more pressure is placed on the loopline.
November 23, 2006 at 6:03 pm #786358Anonymous
InactiveHaven’t we been here before…
Paddy O’Pundit’s Guide to Urban Rail Transport.
“the Tallaght Luas is feckin useless, no better than the bus…”
“the Sandyford Luas, was of money, runs on the street in town…”
“that Luas yoke is the biggest waste of money. No better than a bus!…not even connected! will be a total flop!”
Paddy O’Pundit Saint Paul-Type Revelation After his First Trip on Luas.
“Sure Jaysus this is briliant!” (and Paddy joins the 60 million users of Luas which have made it one of the most successful light rail project on the planet)
No offense lads, but we can complain about the Metro West till we are blue in the face, but we all know it’s going to be a huge success and if the level of density increase along the two Luas lines since they opened is anything to go by, then I can only imagine what Metro West will do for the edges of the city. I suspect it’ll put a lot of past wrongs to right.
November 23, 2006 at 6:15 pm #786359Anonymous
InactiveThe luas lines go into town where you can do without a car. Metro west brings you between places where you need a car. it can’t work. Not even a candidate for a QBC.
November 23, 2006 at 6:17 pm #786360admin
KeymasterI disagree it is gauranteed to be a success; take the red line beyond James’ Hospital and it is patchy a best whilst Tara Street is a serious health & safety blackspot at peak times.
T21 is significantly flawed in that it does not prioritise on the basis of capacity deficits it prioritises on constituency concerns
November 23, 2006 at 6:25 pm #786361Anonymous
Inactive@jdivision wrote:
Opinions please. I think it’s an awful plan, at least one third of Route 2 is through greenfield, the other one is not much better. I feel sorry for anybody living in Lucan given they’re being missed out.[/url]
Route two passes through Lucan village
Route one leaves it too far away, But every bus from the northside of Liffey Valley goes through lucan. But I wouldn’t fancy a metro then a bus from LV.A combination of the two would work much better
November 23, 2006 at 6:40 pm #786362Anonymous
InactiveA Western Rail Corridor for Dublin.@WB Yeats wrote:
What can I but enumerate old themes
@StephenC wrote:
This is certainly not a priority.
@PVC King wrote:
a lot of T21 is very suspect such as the Citywest extension and this whilst more and more pressure is placed on the loopline.
@ PVC King wrote:
T21 is significantly flawed in that it does not prioritise on the basis of capacity deficits it prioritises on constituency concerns
November 23, 2006 at 7:46 pm #786363Anonymous
InactiveHi guys, first post here.
I’m a regular reader of the board and have to say I’m pretty suprised at some the responses here. Orbital (public) transport is an important element of any city and whether or not it has existed in Dublin in the past is neither here not there. It is a common sight in other cities.
The route passes through green fields, but aren’t we always saying that infrastrucutre should be in place before development? This project will help with regeneration and increased density in west dublin, surely this is a viable alternative to more sprawl, while providing a public transport alternative to further M50 congestion.
Also why do people assume that this is some pie in the sky idea? The DTO have done the numbers on journey demand in the city and proposed an orbital metro in A Platform for Change back in 2001.
Criticism of the route is a little premature because as the RPA have shown with the swords metro, they are quite open minded about mixing and matching routes.
While serving new areas, the line will also integrate with the radial luas, suburban and metro lines going into the city center. So with 1 change more people will have city center rail access. Not to mention any current/future QBC’s that cross the line.
To me it just seems to make a lot of sense.
November 23, 2006 at 8:19 pm #786364Anonymous
InactiveThe Irish are by their nature a nation of instinctual Luddites (“Creeping Jesus types” as Bertie correctly pointed out ) when it comes to anything away from the familiar. Normal engineering transport design and approaches which are standard/proven methodology in every other country on earth inspire fear, loathing and doomsday scenarios among the hysterical and timid Irish.
Here are my reason why the MetroWest is going to be a major success:
A) Them Shopping Centres are busy as hell and transport to them is almost 100% private car orientated. Metro West will free-up a huge amount of capcity on the M50 and create a more sustainable retail transport culture in West Dublin and beyond. This is worth its weight in gold.
B) The integration between the Maynooth and Kildare railway lines is really sweet in itself. You want to get to Lucan from Tallaght it’s a one change – no biggie. You live in Maynooth and work in Kildare, MetroWest liberates you from the car. When the Interconnector comes on stream the frequency, capacity and integration on the combined MetroWest, MetroNorth and DART/Suburban Rail will be superb. You want to go to the Airport or City Centre from MetroWest – then change with MetroNorth at Ballymun. People all over the world do this, the lazy Paddies have to learn to do this as well.
I am really amazed how people view MetroWest as a stand-alone project as if is has no integrational relationship to any other Metro line, Heavy Rail or Luas. Look at the T21 maps – it’s an integration dream.
We also have to get away from the endless spit and polish of the CIE victorian rail infrastructure approach which is alright for a quick fix, but it is extremely limited over the long term.
We are a nation of slow learners who like old CIE Victorian railways lines to get a bit of an upgrade now and again or throw CIE a few extra buses with “An Lar” on the destination board so the BAC Supreme Soviets can be saluted as the new buses pass the reviewing stand on Upper O’Connell Street. Then the same Irish who are happy and safe with such traditional approaches to public transport investmenr can constantly wonder why our public transport is among the worst, if not the very worst in the Western World.
Anyways, it is going to be built and that’s that so you might as well start to learn to accept it as you have already done so with the fantastic and gloriously successful Luas, which also went through the same Chicken Little response upon announcement and which delayed it for years and led to the gap when the Chicken Little’s got their way (before the same muppets demanded the lines be joined ASAP as soon as they scratched their baldy shopkeeper heads watching the packed trams stop at the Green).
November 23, 2006 at 9:24 pm #786365admin
Keymaster@Cute Panda wrote:
We are a nation of slow learners who like old CIE Victorian railways lines to get a bit of an upgrade now and again or throw CIE a few extra buses with “An Lar” on the destination board so the BAC Supreme Soviets can be saluted as the new buses pass the reviewing stand on Upper O’Connell Street.
CP it would be appreciated if you kept perspective and moved away from dated 1980’s neo-liberal concepts of all provate ventures being good and all public services being a disaster.
Taking London as a model the tube works whilst in public ownership can compare favourably to any transit network in the World; its success is built is based on ease of connection with a number of lines disecting the most densley used areas of the centre city and in this light the central, Bakerloo and Victoria lines are the nub of thb success behind the tube and all of these lines run on frequencies between 2 and 4 minutes these lines move millions of people and lines such as the Jubilee line have successfully expanded into up and coming areas such as Canary Wharf and Stratford; whilst the orbital route from Clapham to Willesden to Hackney run every 15 minutes are more often than not 90% empty.
No-one is saying that this route is not a valid aspiration but in the light of other deificit areas constructing this route before the Interconnector and electrification of the Maynooth, Sallins and Balbriggan stretches is daft.
We do not require governemnts to decide where lines look good on maps we appoint them to make hard choices as to the division of scarce resourses and this line being built at this time is totally premature.
November 23, 2006 at 10:07 pm #786366Anonymous
Inactivei’m amazed that people still believe urban rail can become a failure. Look at what the very first railway did to the SE of Dublin, look what the DART did for the entire coast, LUAS for Milltown, Dundrum and sandyford. This is the Frank McDonald approach to transport planning (remember he said we’d have to demolish most of west dublin to justify this? lunacy. and people believed him). Anyway a few names that will become very important development areas in the next 20 years – Balgaddy, Ballycoolin, Abbotstown, Fonthill, Metropark, Cappoge and Sillogue, and some old ones that will see massive metro related boosts – west tallaght, Liffey Valley, Clondalkin Village and Carpenterstown. These will be to MetroWest what Cherrywood and Dundrum were to LUAS
In relation to other projects, the northern line is a disaster because housing was built along where it should have been doubled so it’;ll always be this way. The sallins line is part of the Kildare route project, which is underway, but the order has yet to be signed. They’ve started groundwork on the interconnector also. However it’s Metro West and the Interconnector that are the most essential, along with the city centre resignalling, which is not as obvious, but essential nonetheless, to allow more trains through the pearse-connolly bottleneck. The only question on Metrowest is why was the M50 upgrade commenced before it?
As for Lucan, T21 has a LUAS going from the south docks to Lucan. Add in the Navan Rail, the Spencer Dock station, and all the other elements of the strategy and if it’s built, the network will be there…
if it’s built…
November 23, 2006 at 10:07 pm #786367Anonymous
Inactivedammit can you not delete double posts? mod can you delete this please, and you! stop reading. there’s nothing to see here
November 23, 2006 at 10:21 pm #786368admin
Keymaster@alonso wrote:
As for Lucan, T21 has a LUAS going from the south docks to Lucan. Add in the Navan Rail, the Spencer Dock station, and all the other elements of the strategy and if it’s built, the network will be there…
if it’s built…
Ask anyone in Lucan what they would prefer i.e. a Luas to Dublin 2 or at least the nearest National Rail line or a line to Tallaght, Liffey Valley , Blanchardstowen and the Airport and I am sure that most would opt for connectivity to the City Centre where the jobs, shops and restaurants are.
If you examine Luas it is rammed anywhere the population Density is High i.e. Ballaly to Town and James’s Street to town but beyond on both lines it slows to a trickle as the lack of bus integrations kicks in and the car becomes the more efficient mode of transport.
Developing existing landbanks on the existing rail lines is a far more balanced approach to take given the concentration of employment in the centre and established heavy rail lines. The trick with this is to support Admastown, Pelletstown, Grange Road etc and not provide an orbital before communities of 10,000 plus are supported, a real solution for Lucan would be a Luas from Lucan to the Red Cow to be built with a stop at the new Station to be built at Park West creating a multi-modal interchange.
A number of Luas Trams could then operate from Tallaght to Park West supporting an established local need; in time terms Tallaght to Park West 10 minutes Park West to Stephens Green 15 minutes via interconnector and Stephens Green to Airport 20 minutes; total journey time 45 minutes
November 23, 2006 at 11:35 pm #786369Anonymous
InactiveHi,
I have my concerns about this. I have recently completed an analysis of population changes at the ED level for 1996 – 2006 (see link below). In the past 10 years we have had substantial low-density sprawl around Dublin in particular but also around other cities and smaller towns. The construction of an orbital route before the arterial routes are in place appears premature to me. I would think it better value for money to build transport systems that result in the greatest benefits being returned from the outset. Furthermore, the development of the arterial system would foster high-density development along these routes and slow the sprawl process, perhaps to the point of not needing the orbital route (unlikely, but you never know). High Density, High Quality, High Rise
Cheers,
D
November 23, 2006 at 11:41 pm #786370Anonymous
InactiveCan someone please clarify the metro west concept for me? It runs at grade, intersects traffic and can clearly not achieve “high speeds” without the risk of ploughing into some bag laden shopper. Isnt it just a fat luas?
November 24, 2006 at 1:37 am #786371Anonymous
Inactive@PVC King wrote:
Ask anyone in Lucan what they would prefer i.e. a Luas to Dublin 2 or at least the nearest National Rail line or a line to Tallaght, Liffey Valley , Blanchardstowen and the Airport and I am sure that most would opt for connectivity to the City Centre where the jobs, shops and restaurants are.
Well, infact, the people of lucan will be happy to know that they will get a direct line to the city center under transport21. As seen in the t21 map:
@ihateawake wrote:
Isnt it just a fat luas?
I don’t really know but it does seem to be like a normal luas line. Metro looks to be a bit of a misnomer.
November 24, 2006 at 3:11 am #786372Anonymous
Inactive@Cute Panda wrote:
The Irish are by their nature a nation of instinctual Luddites (“Creeping Jesus types” as Bertie correctly pointed out ) when it comes to anything away from the familiar. Normal engineering transport design and approaches which are standard/proven methodology in every other country on earth inspire fear, loathing and doomsday scenarios among the hysterical and timid Irish.
You sound like Kevin Myers. Hyperbole city. But I’m enjoying it so keep it coming.
Here are my reason why the MetroWest is going to be a major success:
A) Them Shopping Centres are busy as hell and transport to them is almost 100% private car orientated. Metro West will free-up a huge amount of capcity on the M50 and create a more sustainable retail transport culture in West Dublin and beyond. This is worth its weight in gold.
each area served by metro west has a shopping centre and each has the same shops. What kind of nutcase would visit these stores without a car?
B) The integration between the Maynooth and Kildare railway lines is really sweet in itself. You want to get to Lucan from Tallaght it’s a one change – no biggie. You live in Maynooth and work in Kildare, MetroWest liberates you from the car. When the Interconnector comes on stream the frequency, capacity and integration on the combined MetroWest, MetroNorth and DART/Suburban Rail will be superb. You want to go to the Airport or City Centre from MetroWest – then change with MetroNorth at Ballymun. People all over the world do this, the lazy Paddies have to learn to do this as well.
What about this: you want to get into town: 30 minutes 1 minute frequency. You want to get out of town: 30 minutes: 1 minute frequency. Change in town. I’m sure there is someone somehwere who wants to get from Tallaght to Lucan without a car but not enough to build a railway between them.
I am really amazed how people view MetroWest as a stand-alone project as if is has no integrational relationship to any other Metro line, Heavy Rail or Luas. Look at the T21 maps – it’s an integration dream.
Why not intersect in the city or build an inner city circle line?
Anyways, it is going to be built and that’s that so you might as well start to learn to accept it
As you know, ther is a fair chance that much in T21 will never come to pass given past form and economic cycles.
November 24, 2006 at 10:24 am #786373admin
KeymasterAs you know, ther is a fair chance that much in T21 will never come to pass given past form and economic cycles
So true if all plans were exectuted fully we wouldn’t need trains because we’d never have stopped dancing at the crossroads and if we abandoned that the DRTS plan of 1976 would have had Dart to Tallaght, Blanchardstown and the Airport by 1985 with an interchange at Stephens Green.
What really annoys me about this is that a second outer ring road has been built on largely the same route as route B from Tallaght to Lucan and no QBC was built to test demand for public transport on this route.
Worsrt case scenario is that this route gets built and delivers a passenger load equivelent to Luas beyond St James and if the global economy sneezes the interconnector is deferred along with the Luas line to Lucan which as yet has no firm timescale.