Dublin Airport Metro to have unconnected terminus?
- This topic has 259 replies, 61 voices, and was last updated 17 years, 8 months ago by
hutton.
- AuthorPosts
- January 17, 2005 at 2:33 am #707593
hutton
ParticipantAll change for Metro terminus – From the Sunday Independent
NICK WEBB
THE Railway Procurement Authority is now looking at starting the proposed Metro transport system from near O’Connell Street on Dublin’s north side rather than St Stephen’s Green as it seeks to reduce the cost of the proposed system.
RPA chairman Padraic White said the initial “hardcore cost” of the Metro would be up to €1.9bn.
It had been suggested that the construction would cost up to €4.8bn but White said that this figure referred to 20-year costs for the system.
ENDS
😮 !!!
So there you go – “Integrated transport/ planning”, my ar$e! I just love the Irish concept of non-connected/ non-compatible mass transit systems. What gauge will it be this time? I hear 3’6″ is making a comeback.
Looking forward to another fine white elephant :rolleyes:
January 17, 2005 at 1:19 pm #749476Anonymous
InactiveThis is a last very desperate move by the RPA to get an Airport ‘metro’ line built.
Note how the figure is below €1.9billion to make it more appealing. This figure doesn’t even include the cost of the train, ticket machines and even escalators. That figure is just for the boring of the tunnel.
This is also a move to make people think that the RPA actually do something useful other than wasting taxpayers money and they can continue getting paid easy money. The RPA should be scrapped. They really haven’t got a clue.
Irish Rail should be handling anything to do with rail. IE originally designed the Luas (B4 the RPA got their hands on it and messed up the plans) and the DART and have many years experience with rail. There is nothing the RPA can do that IE can’t.
This would firstly reduce the cost of any project. IE actually have a excellent record of keeping costs of a project either very close to or below budget. IE have their very own in-house engineers, so when it come to designing issues like the route, they design the route to go where it is needed and makes sure that it is integrated with other lines.
All this ‘metro’ line is for is to get from O’Connell St to Dublin airport. And all for wonderful value of €1.9b + the rest + inflation. If we are desperate to like the airport to rail then IE have a plan to create a spur line from the existing DART line in Baldoyle to the airport. The cost, €400million. This line would also serve the 12500 new houses that are expected to appear in this area of north Dublin over the next few years, saving 12500 extra cars from driving down the Drumcondra and the Malahide roads which are jammed up at the moment.
There is simply far too many cars commuting. This seriously effects our quality of life. As for business, they are loosing over a billion Euro and year because of it. The airport ‘metro’ will do very little to improve this.
Please, stop talking about a ‘metro’ line or building new roads and talk about IE simple and cost effective plan uniquely called the GREATER DUBLIN INTERGRATED RAIL PLAN or GDRP. Click Here
The GDRP actually deals in reducing car numbers by giving people a real alternative to commuting.January 17, 2005 at 1:59 pm #749477hutton
ParticipantSpot on weehamster. RPA should be disbanded. How many heads rolled after 30 Million was wasted at Connolly. Oh I forgot, none. They’re almost as good as the NRA in terms of non-accountability. REAL pressure needs to be applied to the current govt if they are ever going to move away from the current sham approach. I notice – with disgust – how the current FF candidate for Meath by-election believes that “a railway from Navan to Dublin could be up and running in 10 years”. Funny that, they’ve only been in power for 3/4 of the last 25 years. All the time a line is in existence between Navan & Dublin, albeit via Drogheda – just waiting to be used.
Congratulations to FF for being the best opposition while their in govt.
Shame on them, and shame on us for putting them in. 😡
January 17, 2005 at 2:48 pm #749478Anonymous
InactiveThe RPA are simply involved in a price war with CIE at this stage. It is not even about integrated public transport anymore. They just want the money to build any kind of metro, no matter how unintegrated or pointless it is.
Just give CIE the money to build the Interconnector/Dublin Rail Plan and enough of this codology.
@hutton wrote:
All change for Metro terminus – From the Sunday Independent
NICK WEBB
THE Railway Procurement Authority is now looking at starting the proposed Metro transport system from near O’Connell Street on Dublin’s north side rather than St Stephen’s Green as it seeks to reduce the cost of the proposed system.
RPA chairman Padraic White said the initial “hardcore cost” of the Metro would be up to €1.9bn.
It had been suggested that the construction would cost up to €4.8bn but White said that this figure referred to 20-year costs for the system.
ENDS
😮 !!!
So there you go – “Integrated transport/ planning”, my ar$e! I just love the Irish concept of non-connected/ non-compatible mass transit systems. What gauge will it be this time? I hear 3’6″ is making a comeback.
Looking forward to another fine white elephant :rolleyes:
January 17, 2005 at 2:56 pm #749479Anonymous
InactiveDublin Airport is 3.5 Kms away from the DART (already fully integrated with with Regional and National Rail, Luas and Bus service) and there is nothing in between but empty countryside.
January 17, 2005 at 3:32 pm #749480Rory W
Participant@P11 Comms wrote:
Dublin Airport is 3.5 Kms away from the DART (already fully integrated with with Regional and National Rail, Luas and Bus service) and there is nothing in between but empty countryside.
This line is already at capacity – the last thing it needs is more trains on it. It doesnt matter that there is nothing between the airport and the line if there is not capacity on the busiest train line in the country to run it. Unless you want to remove some of the northern suburban, Malahide and Howth services
January 18, 2005 at 2:04 am #749481Anonymous
Inactive@Rory W wrote:
This line is already at capacity – the last thing it needs is more trains on it. It doesnt matter that there is nothing between the airport and the line if there is not capacity on the busiest train line in the country to run it. Unless you want to remove some of the northern suburban, Malahide and Howth services
You are correct, but IE’s DASH project should start to change that.
After the platforms are upgraded so they can handle the 8 carriage DART trains, the signal system will be upgraded between Connolly and Pearse. This will increase the capacity so the existing DART service can absorb the Airport service if required.
However it is IE’s Greater Dublin Rail Plan (click here) which will then take service to a ‘metro’ standard, taking most of the suburban diesel train services out and replacing with DART, the capacity will increases further.
January 18, 2005 at 2:12 am #749482Anonymous
Inactive@Rory W wrote:
This line is already at capacity – the last thing it needs is more trains on it. It doesnt matter that there is nothing between the airport and the line if there is not capacity on the busiest train line in the country to run it. Unless you want to remove some of the northern suburban, Malahide and Howth services
Sure, that’s how things are right now at this present time. But Post-DASH and with the arrival of Spencer Dock, the situation will change and extra capacity will be released on the Northern Line
If the Dublin Rail Plan is fully implemented, then you are talking 6 double decker trains per hour from the airport to Hueston under the city centre in each direction.
Couple this with the already integrated nature of the present IE rail network and the RPA’s ‘bit of an oul metro’ is just a farce and offers appalling value for money.
The plan has been updated on the P11 website: http://www.platform11.org/inter_faq.html
January 18, 2005 at 10:47 am #749483urbanisto
ParticipantTo me this sounds like a thoroughly thought out plan. Whereas a single-line Metro from Airport to…somewhere is just pie in the sky. What is Cullens agenda here? Why the rush to put this Metro in place.
January 18, 2005 at 12:06 pm #749484kefu
ParticipantIf there is no Metro, then the only projects left for the RPA are integrated ticketing and the extension of the Luas lines.
With the integrated ticketing project almost finished, tortuously late but not as noticeably, they will have little or nothing to do. The plans for the IFSC, Cherrywood Extensions are well advanced and by no means justify the existence of a separate Agency at this point. If the Metro plan dies, the RPA’s raison d’etre (apart from connecting the two lines they built separately) disappears.January 18, 2005 at 2:20 pm #749485GrahamH
ParticipantIt may be a naive question – but if the P11 plan is feasible and so cost-effective and fundamentally logical – as it appears to be by all accounts – then why isn’t it being readily adopted? (this being asked by someone who would benefit directly from the planned diversion of much of the existing traffic from Connolly)
Interesting points re the RPA there…
January 18, 2005 at 2:58 pm #749486Frank Taylor
ParticipantThey need to get sign off on a 3.4 billion euro plan (to be spent over a number of years). That’s always going to be hard to do. It’s not clear that the minister for transport or the taoiseach think it’s worth spending so much money on rail transport. Bertie publicly stated that the airport metro was too expensive even though it was to go through his own constituency. Improving life for people living along the Kildare and Maynooth lines must be somewhat further down his priorities.
I’d guess the government sees more votes in a short term spending of the same money on current expenditure in health and education. I doubt they will ever reject the plan but rather do nothing and keep saying that a decision is imminent.
If they haven’t approved the plan by the next election, you know what to do.
January 18, 2005 at 2:59 pm #749487Anonymous
Inactive@Graham Hickey wrote:
It may be a naive question – but if the P11 plan is feasible and so cost-effective and fundamentally logical – as it appears to be by all accounts – then why isn’t it being readily adopted? (this being asked by someone who would benefit directly from the planned diversion of much of the existing traffic from Connolly)
Interesting points re the RPA there…
It’s simple, Irish Politics.
This plan is Irish Rails plan and has appeared in front of the Minister for Transport desk in 1992, 1998 and 2004.
It was considered in 1992 but was dropped for a cheaper light rail project, which we all now know as the Luas (which at the time had a plan for a LUAS line from Dundrum to Ballymun).
It reappeared in 1998 but very quickly disappeared probably due to the Luas again.
It reappeared again last year but the then Minister Seamus Brennan was bent of getting a airport ‘metro’ built even though others including Bertie was against it. Luckily for us Brennan is gone and so to is the ridiculous airport ‘metro’ scheme.So really it is only now that the government recognised the value of the greater Dublin Rail Plan. And we all know how super fast this government is in getting things done. 😀
But I’m hopeful that the government will announce the go ahead of the Interconnector and the DART extensions either this year or next.
January 18, 2005 at 4:02 pm #749488TLM
ParticipantI’d be interested to hear impartially what the disadvantages of the IE plan is compared to the metro though.. there must be some? Even though overall it seems pretty clear that platform11 have by far the superior strategy. Would the IE plan mean a longer journey time form the city to the airport for example? …I realise this would still probably be a minor point compared to the integration the other plan would offer… Just trying to get the facts straight!
January 18, 2005 at 4:11 pm #749489Andrew Duffy
ParticipantSince the two don’t compete for anything except funds and passengers from the airport to the city centre, there’s not much point listing comparisons. However, the proposed metro line serves an area of the North city not served by the Dublin Rail Plan, and it is likely that the journey from O’Connell Street to the airport would be marginally faster than the journey from Connolly on the Dart. The metro really looks bad when you compare journey times from anywhere other than a station on the line – imagine how long it would take to get to the airport from Park West on train, tram and metro compared to a single-change train journey.
January 18, 2005 at 5:31 pm #749490Anonymous
Inactive@weehamster wrote:
IBut I’m hopeful that the government will announce the go ahead of the Interconnector and the DART extensions either this year or next.
I agree. Bertie stated in the Dail that Interconnector/Dublin Rail Plan was impressive. Everybody who comes across it and compares it to the Airport Metro is struck by how more practical and integrated the CIE plan is. I was on the Gerry Ryan show this morning and even he said as I was explaining why we need it with the limited imformation I fed his producer the night before agreed it was the solution to car congestion in Dublin as the majority of the traffic is coming from outside the M50.
Just about everybody with the exception of the RPA is on board at this stage. The best plans are nearly always the most simple and achieved incrementally over time in stages which deliver results at each stage and CIE/IE have been doing just that. The shift towards the announcement of the tunnel and the DART extentions is organic at this stage.
It’s a matter of “when” and not “if”.
January 18, 2005 at 5:59 pm #749491jungle
ParticipantThe IE plan would provide a direct connection from Heuston to the airport and a single change from Connolly to the airport. It would benefit the whole of Ireland. The RPA plan just links the centre of Dublin to the airport.
January 18, 2005 at 7:28 pm #749492kefu
ParticipantThe RPA can never back this plan because they would be effectively voting themselves out of existence (and a job)?
January 18, 2005 at 7:42 pm #749493Devin
ParticipantIf the Metro plan dies, the RPA’s raison d’etre (apart from connecting the two lines they built separately) disappears.
No, there’s also the plan the chief Dublin city planner wants; extending Luas along the Thomas Street/Dame Street/Pearse Street axis to link with existing or upcoming lines at James’ Street and the Point Depot (described as ‘figure of 8’).
January 18, 2005 at 8:44 pm #749494Anonymous
InactiveDevin wrote:No, there’s also the plan the chief Dublin city planner wants]I’m afraid that as aesthetically pleasing as Dick’s figure of 8 may be it will not address fundamental issues of Irish Rail transportation, it is all the population of Ireland that we should be trying to serve here and particularly people like Jungle(who have no access to trans-atlantic flights from their own City) who wish to get on a train in Cork and only have to change once before they reach Dublin Airport, realistically who wants to:
A > Get to Kent Station
B > Get on the Figure of 8 Luas that is already 3/4’s full from stations upstream with your luggage
C > Get off the Luas and walk to the O’Connell St Metro Station
D > Board a metroOr worse get ripped off by Dublin Bus to the tune of 6 euro for the bus that is stuck in gridlock because the QBC network is farfrom finished.
When you can
A > Get to Kent Station,
B > Go Down an Escalator and wait for a direct connection to the Airport.In the future with the IE Dublin Rail plan it may be possible to extend the Airport Spur to Swords and back onto the Airport line somewhere in North Co Dublin facilitating Cork-Dublin-Belfast trains that serve Dublin Airport in one.
I have nothing against the figure of 8 but it doesn’t touch the airport and it will do nothing to relieve the congestion on the loopline, which is going to become gridlocked quite soon (2008 I think) ie no more rail capacity, Which will lead to a situation where all future residential development will have to be exclusively served by road.
- AuthorPosts
- You must be logged in to reply to this topic.

