    Here is an interesting question –

    How long did it take for the original Tramways to be constructed in the late nineteenth century? Just thinking that it couldn’t have taken as long back then (don’t forget the luas was proposed to be FINISHED by 1994 initially!)

    So any takers? Not forgetting the old tram network was far more extensive – I think 10 lines or more (an historical note – the current no. 10 bus follows the old No. 10 tram route – Donnybrook to NCR!)

    Please does anyone know????

    🙂

    #742265
    niall murphy
    Participant

    It probably didnt take as long to construct each route but its hardly comparable. The utility diversion that had to take place along the lines was quite amazing. Stuff was just thrown under the streets every which way, so this needed to be sorted out. Also they didnt build the likes of Taney Bridge etc when doing theirs!!

    #742266
    Anonymous
    Inactive

    Originally posted by niall murphy
    It probably didnt take as long to construct each route but its hardly comparable.

    It was probably more complex as vast amounts of land had to be acquired compulsorily, each route requiring an act of parliment and this was all acheived by the private sector.

    LUAS in contrast had a full disused rail line on one route and it is entirely a victim of its designers on the other. While being 1000% behind public transport I am 100% angry with whatLUAS has become. Three things stand out for me

    1. The Tallaght route via the centre of the Naas Rd, what does this route service other than car lots?

    2. The Calatrava bridge in Dundrum preceding the Macken St bridge, why did Dundrum require such an expensive bridge, does anyone have any pictures of the original bridge?

    3. The behaviour of the contractors in particular at Harcourt St and the recent derailment. It is not as if this project was on time and on budget.

    Three words, Good litigation Solicitors 😡

    #742267
    -Donnacha-
    Participant

    The Dundrum bridge isn’t Calatrava, is it?

    #742268
    Paul Clerkin
    Keymaster

    The Taney Bridge in Dundrum is not by Calatrava, though it may be slightly Calatravaesque although I don’t think so myself……

    #742269
    Anonymous
    Inactive

    Originally posted by Paul Clerkin
    The Taney Bridge in Dundrum is not by Calatrava, though it may be slightly Calatravaesque although I don’t think so myself……

    It isn’t your traditional bridge and I’m sure it has a pricetag akin to a Calatrava when a less ‘Over-engineered’ solution would have been appropriate.

    #742270
    garethace
    Participant

    Does anyone know where exactly around here, that DL/RD council starts and DCC ends?

    Is this bridge perhaps like a termination point between the two? 🙂

    #742271
    Paul Clerkin
    Keymaster

    Originally posted by Diaspora

    It isn’t your traditional bridge and I’m sure it has a pricetag akin to a Calatrava when a less ‘Over-engineered’ solution would have been appropriate.

    See we cannot please you. Sure here’s a less “over engineered solution,” – it just looks like the Matt Talbot bridge over the Liffey……

    #742272
    bluefoam
    Participant

    My big problem with the Luas is that it doesn’t link the two sides of the city, making it useless for many commuters. I was never a big believer in the Northside Southside divide, but it seems that recently the city planners have done everything in their power to split the city.

    #742273
    JJ
    Participant

    A couple of answers to the above.

    The original tram system was based on the earlier horse trams which were built from about 1871 on. The system consisted of many individual lines and the electrification of these started around 1896. It grew gradually over the years before being outclasseed in every sense by the growing bus market.

    Jim Kilroy’s book Irish trams gives a very detailed accout of all this.

    There were many objections to the electrification as people were concerned about the effects on the horses ( they thought they would be electricuted) and it also involved the digging up of some existing lines and the installation of the overheads ( the overheads were all based on using only poles. No building fixings were used)

    Taney bridge cost about €9m to build and was designed by Roughan and O’Donovan engineers. One of the reasons for its shape was to allow it to be constructed simultaneously with a new road widening and junction reconstruction scheme at Taney Junction. The total span is about 180m. I’ve attached a picture of the old bridge which spanned about 8m !

    I’d agree with the commments about HaArcourt Street. The general houskeeping by the contractors was disgraceful.

    The recent derailment was an total non event. It happened during testing and in particular during a shunting movement. Irish Rail had three such de-railments the same week in their Inchicore depot. In railway terms its no worse than a flat tyre on a bus.

    Cheers all,
    JJ

    🙂

    #742274
    3KIC
    Participant

    Originally posted by Paul Clerkin

    See we cannot please you. Sure here’s a less “over engineered solution,” – it just looks like the Matt Talbot bridge over the Liffey……

    SHOCK!
    An Taisce consultant proposes “Yellow Pack” Architecture
    SHOCK!
    😉

    #742275
    Anonymous
    Inactive

    Originally posted by 3KIC

    SHOCK!
    An Taisce consultant proposes “Yellow Pack” Architecture
    SHOCK!
    😉

    I have now moved away from An Taisce and I far from called for a yellow-pack solution, nor would the Matt Talbot bridge be appropriate as its biggest flaw is its low clearance, that prevents boats from docking close to the Custom House.

    But given that everything comes back to the scarcity of resources there were better places to use the funds. Surely the Macken St bridge merited greater priority or even more logically an integrated system. Functional and clean would have cost a lot less and that was what I was suggesting, if you want yellow pack just commute the existing system there are no frills such as integrated ticketing or a rail connection to the airport.

    #742276
    Anonymous
    Inactive

    Sorry, always doing this:)

    #742277
    garethace
    Participant

    An taisce behind you? Oh well…

    Anyhow, this is my only comment:

    I’ve attached a picture of the old bridge which spanned about 8m !

    That is what I call an ‘upgrade’…. very nice slide attachment JJ, thanx… and very nice explanation too…

    Brian O’ Hanlon.

    #742278
    Anonymous
    Inactive

    Line A serves a major industrial area with thousands of employees. Many people in tallaght work in these ‘parking lots’ off the naas road and currently have no way of getting there other than getting the poxy 56a to e.p mooney and walking the rest of the way.

    It opens up an entirely different axis to that already served by dublin bus to tallaght, to travel the same route as existing bus services would be pointless. I can’t get to any of the areas served by line A by bus (save O’Connell Street.)

    I had this discussion with you before Diaspora … which of the six major roads crossing at walkinstown roundabout would you close to facilitate luas? You replied that did line A not also deserve a taney bridge, which may be true, but where should it go after that, down the crumlin road ??? West dublin is riddled with traffic & more than most areas of the city, there is/was no scope for closing any of the major routes from same to town to facilitate luas.

    … great pic of the taney bridge Paul

    #742279
    Anonymous
    Inactive

    Originally posted by Diaspora
    It was probably more complex as vast amounts of land had to be acquired compulsorily, each route requiring an act of parliment and this was all acheived by the private sector.

    Not so. They were all built on public roads. Yes they needed an Act of Parliament, all that was then necessary was to pay for wayleave rights to the robber barons in Dublin Corporation, something which continued up until the mid 1960s despite there being no tramlines!

    #742280
    kefu
    Participant

    What have the completion of the Taney Bridge and the Macken Street Bridge got to with each other any way?
    One was built by the RPA, one is being built by Dublin City Council.
    More relevant point would have been why not build Macken St Bridge before Blackhall Place (James Joyce) Bridge.
    Can’t understand your logic here Diaspora – a €9 million spend for an architectural triumph of a bridge that can be seen for miles around is a lot better than a €6 million spend on some concrete span bridge.

    #742281
    blue
    Participant

    As JJ has already pointed out the main reason behind the choice of bridge type was so the very busy intersection could remain open as much as possible during construction.

    The second reason was aesthetics and I think they should be praised for their choice not chastised. Roughan and O’Donovan are quite forward thinking in terms of taking aesthetics into account right form the word go and not just as an after thought. They won the first AAI award given for a bridge and make modern motorway driving a bit more interesting.

    Engineers get a bad rap for when it come to design, sometimes rightly, but when they do design something like the Taney bridge they should be praised.

    #742282
    Anonymous
    Inactive

    Originally posted by ewanduffy

    Not so. They were all built on public roads. Yes they needed an Act of Parliament, all that was then necessary was to pay for wayleave rights to the robber barons in Dublin Corporation, something which continued up until the mid 1960s despite there being no tramlines!

    In many cases there were no cpo’s but in many cases there were, particularly where the roads weren’t wide enough to accomodate both tram and carriage seperately, hence the cpo of many a front garden as described by the united tramway case of 1907 that gave the phrase ‘injurious effection’ But your point is well made not all tram routes required wholesale cpo’s.

    Originally posted by PeterFitzpatrick
    which of the six major roads crossing at walkinstown roundabout would you close to facilitate luas? where should it go after that, down the crumlin road ???

    A routing via the KCR or Crumlin childrens Hospital would have served a much denser population base, and it is not a case of closing roads but rather adjusting the hierarchy of use to reflect a substantial investment (in the right place). .

    Originally posted by Peter Fitzpatrick
    West dublin is riddled with traffic & more than most areas of the city, there is/was no scope for closing any of the major routes from same to town to facilitate luas?

    So this area of Dublin is busier than the crossings at Hueston Station, Church St, Capel St and Gardiner St. Did you ever consider that the existing poor public transport where people live might have a lot to do with such high car dependency?

    Originally posted by Peter Fitzpatrick
    It opens up an entirely different axis to that already served by dublin bus to tallaght, to travel the same route as existing bus services would be pointless. I can’t get to any of the areas served by line A by bus (save O’Connell Street.)

    Deficiencies in the exisating Dublin Bus network are no excuse to send a rail link down the centre of a Dual Carriageway past multiple car lots, when other routes through moderately dense residential areas exist. What are the major employers on the Naas Rd??? Sisk employs 2500 but they’re mostly onsite I believe.

    #742283
    garethace
    Participant

    True,

    I think Sisk’s 2500 workers show up at the Red Cow Inn each xmas for a day-long piss-up…. but that’s about it… all other times of the year they are just adding to the general conjestion going into Dublin city centre or whereever the Sisk building site are these days…