1919 – Powers Hotel, Fargo, North Dakota

Architect:

powers_hotel_lge

powers_hotel2_lgepowers_hotel2_lge

Built in two stages, the first three floors were completed in 1914-15, the top two were added later by 1919. With the extension, a more elaborate parapet was added to the hotel. It now provides a focal point to Broadway, with a substantial presence on an intersection.