1978 – IKOY Office Building, 396 Assiniboine Avenue, Winnipeg
Architect: IKOY
Office for the architectural firm IKOY in a “High Tech” style. Constructed in 90 days, the mirror clad building has a north/south orientation looking towards the Assiniboine river behind. The structure was constructed of precast concrete panels with exposed, cross-tied steel tube bracing internally. In true High Tech fashion bright colours were used for elements including the external stair, the internal bracing, and the metal mezzanine level. Internal photographs from the time of construction show an incredible amount of natural light. Winner Governor General’s Medal, 1982.
Published November 2, 2025

