1915 – Unbuilt Design for Maryland Bridge, Winnipeg

Architect: Arthur A. Stoughton

0774.jpg

0002.jpg

Unbuilt proposal for a Memorial Bridge over the Assiniboine in Winnipeg to replace the decaying Maryland Bridge.

“The accompanying illustration is of the proposed Maryland Street Bridge, one of three bridges which it is proposed to build across the Assiniboine River. The estimated co.st of the three structures is $459,355, divided as follows: Maryland Street Bridge, $141,680; Main Street Bridge, $191,276; Arlington Street Bridge, $126,379. These estimates include land damages, the removal of old bridges, and the construction of temporary bridges during the erection of the Main and Maryland Street structures. Mr. Paul Schioler is Bridge Engineer of the City of Winnipeg.”
Engineering and Contract Record, July 281, 1915

Cite This Article ▼ Click to expand

APA Format:
Clerkin, Paul (2012, April 11). *1915 – Unbuilt Design for Maryland Bridge, Winnipeg*. Archiseek.com. https://www.archiseek.com/1915-unbuilt-design-for-arlington-bridge-winnipeg/ (Updated 2026, April 30)
MLA Format:
Clerkin, Paul. "1915 – Unbuilt Design for Maryland Bridge, Winnipeg." *Archiseek.com*, 11 Apr. 2012, https://www.archiseek.com/1915-unbuilt-design-for-arlington-bridge-winnipeg/. Updated 30 Apr. 2026.

Published April 11, 2012 | Last Updated April 30, 2026

More!